How to Quote PCB Assembly From a Customer BOM

Short answer

To quote PCB assembly from a customer BOM, normalize every line to a manufacturer part number, price each component at the quantity break for each build size, check stock and lead time on franchised sources, add overage for placement attrition and minimum buy quantities, then add board, assembly labor, NRE, and margin. The step most shops get wrong is availability: a cheap price on a part with a 40 week lead time is not a quote, it is a liability. This walkthrough shows the order of operations an estimator should follow.

Step 1: Clean and Normalize the BOM

Start by checking the BOM against the Gerber or assembly drawing before pricing anything. Confirm the count of reference designators matches the quantity column on every line, because a mismatch there is the most common source of a quote that loses money. Resolve lines that have a value but no manufacturer part number, separate DNP and customer-consigned lines, and note any lines that allow an approved alternate.

Capture package details that affect process: BGA, QFN with thermal pads, fine-pitch connectors, press-fit parts, and anything that needs selective solder or hand assembly. This is also where you decide if the build needs X-ray inspection, conformal coat, or underfill, since each adds operations that belong in the labor model.

Step 2: Price at the Right Quantity Breaks

Price each line for each quantity the customer asked about, not just one. A 10 piece prototype and a 500 piece run pull entirely different breaks, and reel versus cut tape pricing changes the math on passives. Use your actual sources and discounts, not list price.

Passive components are often bought in full reels for volume builds, so the quote should reflect the reel cost and consider what happens to the leftover quantity. Flag lines where the cost per piece is dominated by a single expensive part such as an FPGA, memory, or RF module, because those lines deserve their own risk treatment and often their own validity window rather than a blanket adder.

  • Price at every build quantity on the RFQ, not an average
  • Use your negotiated distributor discounts and approved sources
  • Separate reel, cut tape, and tray pricing for passives and ICs
  • Mark lines over a cost threshold for individual review

Step 3: Availability, Lead Time and Last Time Buy Risk

Check stock depth and factory lead time for every line, and look for lifecycle status. A part marked not recommended for new designs or approaching end of life may be fine for a one time build and a disaster for a three year program. Quote validity should reflect the longest or most volatile line, so a 30 day validity on a BOM with allocated parts is sensible.

For long lead items, quote the schedule honestly: either the customer supplies the parts, you buy at risk with a deposit, or you propose a pre-approved alternate. Writing the lead time risk on the quote protects you from the dispute that follows when delivery slips for reasons that were visible at quoting time.

Try it here, free

SMT Setup Cost and Minimum Batch Size Calculator

Open full tool

Find setup cost per board for any batch size, and the minimum batch needed to keep setup under a target cost per board.

Step 4: Overage, Attrition and Minimum Buy Quantities

Machines drop parts. Small passives such as 0201 and 0402 components need meaningful overage, while larger ICs need a small spare count, and tape leader and splice waste adds to the total. Overage rules should be a table by package type, not one percentage for the BOM.

Then handle minimum order quantities: if the part comes only in a reel of 3,000 and the job needs 200, someone owns the remaining 2,800 pieces. Decide whether that cost is charged to the customer, absorbed into price, or held for the next order. Quotes that ignore leftover material push cash into excess inventory that never gets billed.

Step 5: Roll Up and Review Before It Goes Out

Add bare board cost, SMT and through-hole labor from your time standards, test and inspection, stencil and programming NRE, packaging and freight, then margin. Review the quote against similar past jobs: if cost per placement or margin is out of line with closed jobs of similar complexity, find out why before sending. Netray can run this comparison as a private AI layer over your ERP, retrieving comparable jobs and their actual costs for the estimator.

It is overkill if you only build a few repeat assemblies; a clean spreadsheet and a good habit of closing the loop on actuals will serve you fine.

Frequently asked questions

How much overage should I add when quoting SMT assembly?

It depends on package size and line condition. Small chip passives need the most because of pick and place drops and tape waste, while larger ICs need only a few spares. Use a table by package type built from your own scrap data, and review it quarterly. A flat percentage across the BOM either overcharges or loses money on specific lines.

How long should a PCBA quote be valid?

Match validity to your most volatile line. A BOM of stable passives can hold 30 to 60 days, while one with allocated memory or FPGAs may justify two weeks or less. State the expiry on the quote and the conditions under which you will requote, such as a lead time change or a part going out of stock.

Do I quote on franchised distributors only?

Many shops do, especially for defense, aerospace, and medical customers where counterfeit avoidance is contractual. For consumer or industrial work, some shops allow independent distributors with customer approval and inspection requirements stated on the quote. Whatever you choose, write it down so estimators price consistently.

If you want to see how a draft quote can be built from your own closed jobs and BOM history, send Netray a recent RFQ and its actuals.