ERPVendor: ProShop Agent view

What is ProShop ERP? Modules, integrations and alternatives

ProShop ERP is a cloud-based ERP and quality management system built for precision machining and similar custom manufacturing. It combines quoting, work orders, scheduling, tooling, inventory, quality records and document control in one application, with a focus on regulated work such as aerospace and medical.

Also known as: ProShop, Pro Shop ERP, ProShop ERP system

ProShop ERP is designed around the idea that a shop's quoting, production, quality and documentation data should live in one system rather than in an ERP plus separate quality and document tools. A work order carries its routing, work instructions, tooling, inspection plans and quality records, so that operators on the floor see the current approved information.

It is used mainly by machine shops and contract manufacturers, many of which serve aerospace, defense, medical device and other regulated customers. Typical users include estimators, programmers, machinists, quality staff and owners. Because quality and document control are native modules, shops preparing for audits such as AS9100 or ISO 13485 often evaluate it for that reason, though the certification itself remains the shop's responsibility.

In a manufacturing stack, ProShop can act as the primary system for the job shop, with CAM, CMM or inspection software, and accounting tools around it. It is delivered as a web application, which affects how integrations, device access and data hosting are handled. Shops with strict data residency or air-gapped requirements should confirm hosting options directly with the vendor.

Modules and capabilities

Estimating and quoting

Builds quotes from parts, operations, materials and outside services, and converts them into work orders.

Work orders and shop floor

Provides digital travelers with routings, instructions, drawings and time tracking for operators.

Scheduling and planning

Loads operations onto work centers and supports shop-level planning of work.

Tooling and fixtures

Tracks tools, fixtures and related setup information tied to parts and operations.

Quality management

Covers inspection plans, nonconformance and corrective action records, calibration and related quality processes.

Document and revision control

Manages drawings, work instructions and revisions so that the floor uses approved versions.

Inventory, purchasing and accounting

Covers material, purchase orders and receiving, with accounting functions or exchange with an accounting package depending on setup.

Integrations and data access

API

The vendor provides an API for programmatic access. Confirm its scope, authentication model and rate limits for your plan before designing integrations.

CAM and programming

Programs, drawings and setup documents are attached to parts and operations, with CAM tools commonly sitting beside it.

Inspection and metrology

Inspection results and reports can be attached to work orders; CMM and inspection software integration depends on available interfaces.

Accounting

Accounting is handled within the product or exchanged with an external package, depending on how the shop is set up.

Documents and file exchange

Drawings, models and customer documents are typically uploaded and linked to parts and revisions.

Strengths

  • Quality management and document control are built into the same system as production
  • Floor-facing digital travelers reduce use of outdated paper and local files
  • Web delivery avoids server maintenance for the shop
  • Strong fit for precision machining workflows in regulated industries
  • Single data model lowers the reconciliation work between separate tools

Limitations

  • Focused on machine shops and custom manufacturing; less suited to process, repetitive or very large multi-site operations
  • Cloud delivery may not satisfy strict on-premises or air-gapped requirements
  • Switching from a long-running ERP means migrating history and retraining staff
  • Integration depth depends on available API scope and plan

Where AI helps ProShop ERP users

  • - Answer questions about work orders, quality records and tooling using natural language over read-only data
  • - Assist with drafting nonconformance and corrective action write-ups from operator notes for quality staff to review
  • - Search work instructions, inspection plans and customer requirements to answer floor questions
  • - Draft quotes from similar past parts and actual hours for an estimator to confirm
  • - Check document sets against audit checklists to surface missing records before an audit

Evaluating ProShop ERP? Check these

  1. Ask how the product handles the specific quality records and customer flow-downs your customers require
  2. Confirm hosting, data residency and support for controlled or export-restricted data
  3. Run a real part through quote, work order, inspection and shipment during the demo
  4. Review API scope and what data you can extract if you ever leave
  5. Plan data migration, training and a phased cutover rather than a single switch
  6. Speak to shops of similar size and process mix about their implementation experience

Common alternatives: ECI JobBOSS2, ECI E2 Shop System, Global Shop Solutions, Epicor Kinetic, Plex Smart Manufacturing Platform, Odoo.

Frequently asked questions

What is ProShop ERP?

ProShop ERP is a cloud-based ERP and quality management system for machine shops and custom manufacturers. It joins quoting, work orders, scheduling, tooling, inventory, quality records and document control, and it is commonly evaluated by shops serving aerospace, defense and medical customers.

Is ProShop ERP only for machine shops?

It is designed mainly for machine shops and similar custom manufacturers. Shops with fabrication, assembly or other make-to-order work may also evaluate it. Companies with continuous process, high-volume repetitive or complex multi-site needs usually need a different class of system.

What traceability and lot tracking does ProShop ERP provide for precision manufacturers?

ProShop ERP ties traceability to the work order. Material received against a purchase order can be recorded with its lot or heat identifiers and supplier material certifications, then linked to the work orders that consume it, so a finished part can be traced back to its raw material and forward to the shipment and customer. The same work order holds the routing, operator time, revision of the drawing and instructions used, inspection results, nonconformances and outside processing records, which builds a complete production history for each job. Confirm the exact lot, serial and certificate handling for your plan in a demo, using a real part and the flow-down requirements from your customers.

Does ProShop ERP replace a separate QMS?

It includes quality and document control functions, so some shops use it as their main QMS tooling. Whether it meets your certification and customer requirements depends on how you configure it and what your auditors accept. Verify with your registrar and customers.

Can ProShop ERP run on premises?

It is primarily delivered as a cloud application. Shops with strict on-premises or air-gapped requirements should ask the vendor directly about any alternative hosting. If none exists, plan around the cloud model or consider other systems.

How can AI help ProShop ERP users?

AI is useful for questions over work orders and quality records, drafting quotes from history, searching instructions and inspection plans, and pre-audit record checks. Keep access read-only, show the underlying query, and require human approval before any write. Private models can be used where data cannot leave the shop.

Running ProShop ERP?

We add AI, chat, automation and integrations to the systems manufacturers already run, on-prem if needed.

Get a free assessment

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

ERP fixes and how-tos

Guides

AI on your ERP

Integrations

Software