B2B e-commerce portalSAP ECCRuns on-prem

Corevist Commerce B2B portal with SAP ECC

Corevist Commerce is a B2B ordering portal for manufacturers that shows SAP contract pricing, availability, order status, invoices and payments to customers. Per the vendor it integrates directly with SAP, with a directory listing citing 49 SAP-certified integration points, or through SAP BTP Integration Suite. It also supports S/4HANA.

How Corevist Commerce connects to SAP ECC

Direct SAP integration

The portal calls SAP for pricing, ATP, orders and invoices, so customers see SAP's own numbers rather than a copy. On ECC this means reliable SAP connectivity from the portal host and a dedicated technical user.

SAP BTP Integration Suite

An alternative path through SAP's integration platform, useful when you want to govern connections in one place or are moving toward S/4HANA.

What data moves

FromToDataWhen
SAP ECCPortalCustomer-specific contract prices and discountsCatalog view or cart pricing
SAP ECCPortalATP and stock availabilityProduct page or checkout
PortalSAP ECCSales orders and quotesCustomer submits order
SAP ECCPortalOrder status, shipments and invoicesCustomer opens order history

Setting it up

  1. 1Choose the integration pathDecide between direct SAP connection and BTP Integration Suite based on your security and S/4HANA plans.
  2. 2Create the technical userProvision a dedicated SAP user with the minimum authorizations for pricing, ATP, order create and display.
  3. 3Map customers to portal accountsLink SAP sold-to, ship-to and payer partners to portal users and roles.
  4. 4Align sales area and pricingConfirm sales organization, distribution channel and pricing procedure so the portal price matches VA01.
  5. 5Load catalog and contentSync material master and add portal content such as images and datasheets.
  6. 6Test order round tripPlace orders with partial availability, blocked customers and special ship-to addresses.
  7. 7Load testCheck how real-time SAP calls behave during peak ordering hours before go-live.

What usually breaks

  • !Real-time pricing calls add load to SAP at peak hours if not sized and monitored.
  • !Customers with multiple ship-to partners or hierarchies show wrong prices when partner functions are mapped poorly.
  • !Orders that fail SAP credit or incompletion checks appear accepted in the portal but stuck in SAP.
  • !Material and unit of measure conversions confuse portal quantities versus SAP sales units.
  • !Technical user authorization gaps appear only for rare order types.
  • !Customer-facing exposure of internal statuses or prices needs a deliberate filter.

A private AI layer across both systems

Stuck order triage

A private assistant checks portal orders against SAP incompletion logs and credit blocks and explains each stuck order, drafting the fix for a CSR to approve.

Customer service answers

Let internal staff ask where an order is or why a price differs, with the SAP query shown and roles respected.

Portal adoption analysis

Compare portal against email or EDI orders by customer to find accounts worth moving online.

Try it here, free

Ecommerce B2B Portal ROI Calculator

Open full tool

Model the labor and rework savings from moving manual order entry to a self-service B2B portal, and see the payback period against build and run cost.

When something else fits better

  • EDI or punchout may serve large customers better than a portal.
  • SAP's own commerce products are an option if you already license them.
  • A simple order status page with no ordering is enough when the main need is fewer status calls.

Frequently asked questions

Does the portal copy SAP data?

Per the vendor it reads pricing, availability and order data from SAP so customers see live numbers. How much is cached is a configuration detail to confirm with Corevist for your volume.

What does the 49 integration points figure mean?

It comes from a directory listing that cites 49 SAP-certified integration points. Treat it as a vendor claim and ask Corevist which of those points your use cases actually need.

Can it run through BTP?

Yes, the vendor lists SAP BTP Integration Suite as an alternative to direct integration, which helps if you plan an S/4HANA move.

Pairing documented at www.corevist.com/demo/ . Corevist Commerce is a product of Corevist; Netray is independent and not affiliated with either vendor.

Get SAP ECC 6.0 alerts

Support and maintenance deadlines, release changes that affect SAP ECC 6.0 sites, and new free SAP ECC 6.0 tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for SAP ECC 6.0: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to SAP ECC 6.0? Start with the SAP ECC 6.0 guide and toolkit, or plan with SAP ECC to S/4HANA Conversion Planner, Training Path Builder, Upgrade Path Planner.

Keep exploring