Training Path Builder
SAP ECC training path builder
Pick a role, the SAP ECC 6.0 modules you need and the hours you can spend each week, and get a dated week by week plan. Every lesson names the transaction codes to practice in SAP GUI, from VA01, ME21N, MIGO and CO11N to FB50, PFCG, SE80 and BD87. Tick lessons off as you go, save the plan to your account and export it for your team.
78 lessons across 16 modules. Free, runs in your browser, no login needed.
1Your role
Swap modules to match your job, for example FI for accounts payable clerks or PP for production staff.
2Modules
3Schedule
Lessons are spread over working days. A lesson that does not fit in a week moves to the next one.
Practice in a sandbox, training or test client, never in production. Transaction codes are for SAP ECC 6.0 in SAP GUI; some depend on your enhancement package, active business functions and installed components (for example classic WM or SAP Gateway), and your roles decide which ones you can open.
Your week by week plan
Week 1
3.2 hWeek 2
3.8 hWeek 3
3.6 hWeek 4
1.5 h
Official SAP ECC (ERP Central Component) learning
Get this reviewed by an engineer
Rolling this out to a team? Send the plan and an engineer will reply with what to add, cut or reorder for your version and process.
How to use it
- 1
Pick a role. Choose the role you are training for. It selects the lessons and the modules a person in that role usually needs.
- 2
Choose modules. Add or remove modules such as SD, MM, PP, FI, CO, Basis or ABAP. SAP GUI navigation is always included. Turn on advanced lessons for configuration and design topics.
- 3
Set your schedule. Enter hours per week and a start date. Lessons are packed into weeks and given target dates on working days.
- 4
Practice in a sandbox client. Work through each lesson in a sandbox, training or test client, never in production, and tick it off.
- 5
Export or save. Download the plan as PDF, Excel, Word or CSV, or save it to your account to keep your progress.
Modules covered
- SAP GUI navigation and basics
- Easy Access, transaction codes, favorites, variants, ALV lists and organizational units.
- Sales and Distribution (SD)
- Quotations, sales orders, pricing, credit, deliveries and billing.
- Materials Management and purchasing (MM)
- Material and vendor master, requisitions, POs, release, goods receipt and invoice verification.
- Inventory and warehouse (MM-IM, WM)
- Stock reports, goods movements, physical inventory and classic WM transfer orders.
- Production Planning (PP)
- BOMs, routings, MRP, production orders, confirmations and order close.
- Quality Management (QM)
- Inspection lots, results recording, usage decisions and notifications.
- Plant Maintenance (PM)
- Functional locations, equipment, notifications, orders and maintenance plans.
- Financial Accounting (FI)
- G/L, payables, receivables, payment program, period close and asset accounting.
- Controlling (CO)
- Cost centers, planning, allocations, internal orders, product costing and CO-PA.
- Reporting and queries
- QuickViewer, SAP Query, table display and background reports.
- Customizing (SPRO and IMG)
- IMG navigation, enterprise structure, number ranges and customizing requests.
- Basis: users, security and operations
- Users, roles, jobs, monitoring, performance, spool, profiles and notes.
- ABAP development
- Dictionary, reports, function modules, BAPIs, classes, debugging and forms.
- Enhancements and user exits
- Customer exits, BAdIs and SD user exit includes.
- IDoc, ALE, RFC and data loads
- IDocs, partner profiles, monitoring, RFC, web services and LSMW.
- Transports, upgrades and S/4HANA readiness
- Transport management, EHP updates, SPDD and SPAU, and conversion prechecks.
Questions
Where do I find official SAP ECC training?
SAP runs its training through SAP Learning (learning.sap.com) for learning journeys and certification, and SAP Training (training.sap.com) for paid classroom and virtual courses. Most new SAP content targets SAP S/4HANA, so for ECC 6.0 the SAP Help Portal documentation for SAP ERP is the main official reference. Check course availability for ECC topics directly with SAP.
Is there an SAP ECC user guide?
Yes. The SAP Help Portal has the SAP ERP 6.0 documentation by enhancement package, up to EHP8, with application help per component such as SD, MM, PP, FI and CO. Basis and ABAP tools are documented under SAP NetWeaver. Your own company process documents should complement it, because customizing differs by system.
Is SAP ECC the same as SAP ERP 6.0?
ECC (ERP Central Component) is the core component of SAP ERP; SAP ECC 6.0 and SAP ERP 6.0 are used for the same release, which is part of SAP Business Suite 7. Enhancement packages (EHP1 to EHP8) add functions on top of ERP 6.0 without a full release change.
How long is SAP ECC supported?
SAP announced in February 2020 that mainstream maintenance for core applications of SAP Business Suite 7, including SAP ERP 6.0, runs until the end of 2027, with optional extended maintenance from 2028 to the end of 2030. Check your own contract and the SAP release strategy pages for the terms that apply to you.
What should an SAP ECC beginner learn first?
Start with SAP GUI: logon, SAP Easy Access, the command field (/n and /o), favorites, F1 and F4 help, variants and ALV lists, plus the organizational units and the material, customer and vendor master. Then learn the transactions of your area, for example VA01, VL01N and VF01 for order to cash, or ME21N, MIGO and MIRO for procure to pay.
What does an SAP ECC developer need to learn?
Classic ABAP in SAP GUI: the ABAP Dictionary (SE11), reports and the Object Navigator (SE80), function modules and BAPIs (SE37), classes (SE24), the debugger, ST22 and ST05, enhancements with SMOD/CMOD and BAdIs (SE18/SE19), forms (SAPscript, Smart Forms, Adobe forms) and IDoc and RFC integration.
Can I practice in our production SAP ECC system?
No. Use a sandbox, training or quality client. Many lessons post goods movements and financial documents, change customizing or create users and roles, which you do not want in production. Production clients are usually locked against customizing changes in SCC4 anyway.
Should I still learn SAP ECC if we are moving to S/4HANA?
If you run ECC today, yes: you need it to operate until cutover, and conversions start from your ECC data, processes and custom code. Many transactions carry over to S/4HANA, but some areas change, for example the business partner replaces separate customer and vendor maintenance. The S/4HANA readiness lesson covers the checks to start with.
Sources
- SAP News: SAP S/4HANA maintenance until 2040 and SAP Business Suite 7 maintenance (Feb 2020)
- SAP Help Portal: SAP ERP (6.0 EHP8) documentation
- SAP NetWeaver 7.0 EHP2: Working with transaction codes
- SAP NetWeaver 7.0 EHP2: SAP Easy Access
- SAP NetWeaver 7.0 EHP2: Creating favorites
- SAP NetWeaver 7.0 EHP2: Creating QuickViews
- SAP ERP: Purchasing single-screen transactions (ME51N, ME21N)
- SAP ERP: Release purchase orders (ME28, ME29N)
- SAP ERP: Goods receipt (MIGO)
- SAP ERP: Movement types for customer stock (101, 311)
- SAP ERP: Invoice release (MRBR)
- SAP ERP: Physical inventory (MM-IM)
- SAP ERP: Goods movements via shipping (6xx movement types)
- SAP ERP: Reviewing and releasing blocked documents (credit)
- SAP ERP: Transaction codes for MRP
- SAP ERP: Production order phases (CRTD, REL, TECO)
- SAP ERP: Confirmations (CO11N)
- SAP ERP: Cost object controlling transaction codes
- SAP ERP: Single and composite roles (PFCG)
- SAP NetWeaver 7.0 EHP2: ABAP dump analysis (ST22)
- SAP ERP: ALE status monitoring (BD87)
- SAP ERP: Interface monitors (WE02, BD87, SMQ1, SMQ2)
- SAP NetWeaver 7.0 EHP2: Transaction SPDD
- SAP NetWeaver 7.0 EHP2: Transaction SPAU
- SAP ERP: Customer and vendor table checks prior to conversion
- SAP ERP: Master data consistency check for business partner conversion
- SAP Readiness Check: simplification items
- SAP Learning
- SAP Learning: certifications