AS/400 (IBM i) Backup Verification Checklist
On IBM i, a backup job that ran is not the same as a backup you can recover from. This checklist walks through completion, coverage, storage and restore proof, so that you can show an auditor or a manager that your saves are real.
0 of 32 items complete
10 critical items still open - these are the highest-risk gaps.
Backup completion
Coverage
Media and storage
Restore proof
Process and governance
A backup that has never been restored is an assumption. Treat any unchecked critical item as an open risk with an owner and a due date.
Optional automated backup reporting
If you would like save results and restore evidence summarized automatically, we can discuss a read-only approach.
Optional. The tool and every export work without this. No spam.
How to use the checklist
Go through the checklist after a normal save cycle and tick only what you have verified on the system, for example by reading the job log. The critical items are those whose failure usually makes recovery impossible: a missing security data save, a single copy kept on site, or no restore test. Export the finished list to PDF or Excel and keep it as evidence. Run it monthly, and after any change to libraries, hardware, backup software or ERP configuration.
What a complete IBM i save includes
IBM i separates what you save into several commands. SAVSYS saves the licensed internal code and operating system. SAVSECDTA saves user profiles and authorities. SAVCFG saves configuration objects. SAVLIB saves user libraries, SAV saves integrated file system directories, and SAVDLO saves document library objects. Journals and receivers need a plan for saves between full backups. Many shops use BRMS to coordinate it. Whichever tools you use, compare what is saved with what the ERP and its integrations need.
- SAVSYS: system and licensed internal code
- SAVSECDTA and SAVCFG: security and configuration
- SAVLIB and SAV: libraries and IFS directories
- Journal receivers: changes between saves
Common mistakes
Frequent failures include saving while users hold locks and silently skipping objects, forgetting new libraries that were added after the backup was designed, and keeping only one copy of the latest backup on site. Another common issue is a recovery document stored only on the system that has failed. Finally, many shops measure backup success by the absence of an error message, when the real test is a timed restore with business validation. Schedule that test and treat it as part of the process.
Frequently Asked Questions
How often should I test an IBM i restore?
At least once a year for critical libraries, and a full recovery rehearsal to a spare partition or provider on a schedule your risk policy supports. Test again after major changes to hardware, backup software or ERP structure.
What does SAVSECDTA save?
It saves security information including user profiles, authorization lists and authority holders. Without it, restoring libraries may leave you with objects whose owners and permissions are wrong or missing.
Is a full system save needed if I save libraries daily?
Usually yes. Library saves do not restore the operating system and licensed internal code, so a full system save is the base for complete recovery. Frequency depends on your recovery goals and change rate.
Can I rely on a replicated copy instead of backups?
Replication helps with availability, but it also replicates deletion and corruption. Most organizations keep point-in-time backups in addition, and test restores from them.
If you want backup and recovery results reported automatically in plain language for your management or auditors, Netray can discuss it. The checklist is complete without contact.
Related Tools
IBM i (AS/400) System Health Check Checklist
A practical weekly and monthly health check for IBM i partitions running ERP such as JD Edwards World, covering storage, jobs, patches, security and recovery.
Costing & FinanceLegacy ERP Retirement Cost and Payback Calculator
Compare the annual run cost of a legacy IBM i ERP with a replacement, include migration and parallel run costs, and see payback and net savings.
ERP Migration & SelectionJDE World to E1 Migration Readiness Assessment
Ten questions that show how complicated a JD Edwards World to E1 (or other ERP) move will be, based on customization, data, interfaces and people.
ERP Migration & SelectionAS/400 Green Screen Modernization Assessment
Find out whether your IBM i green screen applications should be left alone, wrapped with a web or API layer, or replaced, based on 10 practical questions.
More ERP Operations tools
See allNew to IBM i (AS/400) ERPs? Start with the IBM i (AS/400) ERPs guide and toolkit.
Keep exploring
Free tools
- IBM i (AS/400) System Health Check ChecklistA practical weekly and monthly health check for IBM i partitions running ERP such as JD Edwards World, covering storage, jobs, patches, security and recovery.
- IBM i (AS/400) Disaster Recovery Runbook TemplateFill-in recovery runbook for an IBM i production partition: objectives, restore sequence, contacts, validation steps and drill history.
- IBM i (AS/400) User Profile Access Review WorksheetEditable review sheet for IBM i user profiles that scores special authorities and dormant accounts and records manager approval for audits.
Runs with your ERP
- RF-SMART Manufacturing Data Collection for JD Edwards WorldShop floor barcode data collection for JD Edwards World with RF-SMART: what it reports, how it connects, setup steps, pitfalls and a private AI layer on top.
- Vertex Tax Connectors with JD Edwards EnterpriseOneHow Vertex calculates sales, use and VAT tax for JD Edwards EnterpriseOne and World, plus Oracle EBS and Cloud ERP: integration model, flows, setup, pitfalls.
- RF-SMART and JD Edwards EnterpriseOne: Barcode Scanning and Mobile WMSHow RF-SMART connects barcode scanning to JD Edwards EnterpriseOne and World: integration method, data flows, setup steps, pitfalls and where private AI helps.
AI on your ERP
- AI for JD Edwards World on IBM i, without a EnterpriseOne migrationAdd AI to JD Edwards World on IBM i without replatforming: read the physical files safely, ground an LLM on your data, and keep control on the box you already run.
- JD Edwards AI Consulting: How to Scope and Implement AI on EnterpriseOneJD Edwards AI consulting and implementation: scope, phases, Orchestrator and AIS design, security, cost and partner questions for EnterpriseOne and World.
Integrations
- How to add AI agents to JD Edwards World on IBM iHow to add AI agents to JD Edwards World on IBM i: a read-first tool layer over DB2 for i, human approval before any write, and a fully on-prem model option.
- How to use ChatGPT with JD Edwards WorldUsing ChatGPT with JD Edwards World on IBM i: custom GPT actions vs data exports, enterprise data controls, and when a private model is the better fit.