Battery Cell Formats and Chemistries Reference: 18650, 21700, 4680, LFP, NMC, NCA
Purchasing and engineering teams in EV programs constantly compare cell formats and chemistries, and the first questions are usually about size and voltage. This table puts the common ones side by side so you can sanity-check a quote or a datasheet.
| Format or chemistry | Category | Nominal voltage | Typical upper charge voltage | Notes |
|---|---|---|---|---|
18650 | Cylindrical format | Depends on chemistry | Depends on chemistry | Approximately 18 mm diameter by 65 mm length. Long history in laptops and early EV packs. |
21700 | Cylindrical format | Depends on chemistry | Depends on chemistry | Approximately 21 mm diameter by 70 mm length. Larger capacity per cell than 18650. |
26650 | Cylindrical format | Depends on chemistry | Depends on chemistry | Approximately 26 mm diameter by 65 mm length. Common with LFP chemistry in power tools and storage. |
4680 | Cylindrical format | Depends on chemistry | Depends on chemistry | Approximately 46 mm diameter by 80 mm length. Large-format cylindrical cell introduced for newer EV packs. |
Prismatic | Format | Depends on chemistry | Depends on chemistry | Rigid rectangular metal case. Efficient packing, common in Asian and European EV packs. |
Pouch | Format | Depends on chemistry | Depends on chemistry | Laminated foil enclosure. Flexible shape, needs structural support and swelling management in the module. |
LFP (LiFePO4) | Chemistry | 3.2 V | 3.65 V | Lithium iron phosphate. Good thermal stability and cycle life, lower energy density, flat voltage curve. |
NMC (nickel manganese cobalt) | Chemistry | 3.6 to 3.7 V | 4.2 V (some variants higher) | Widely used in EVs. Higher energy density than LFP. Several nickel-rich variants exist. |
NCA (nickel cobalt aluminium) | Chemistry | 3.6 V | 4.2 V | High energy density. Used in some cylindrical cell packs. |
LCO (lithium cobalt oxide) | Chemistry | 3.7 V | 4.2 V | Mostly used in consumer electronics rather than vehicles. |
LMO (lithium manganese oxide) | Chemistry | 3.7 V | 4.2 V | Good power capability, lower cycle life. Sometimes blended with NMC. |
LTO (lithium titanate anode) | Chemistry | 2.3 to 2.4 V | 2.8 V | Very fast charge and long life, lower energy density and higher cost. |
Sodium-ion | Chemistry | About 3.0 to 3.1 V | Varies by design | Emerging alternative without lithium. Check supplier data for actual figures. |
400 V class pack (NMC example) | Pack architecture | About 355 V at 96 cells in series | About 403 V at 4.2 V per cell | 96 cells in series times 3.7 V nominal gives about 355 V. Parallel groups add capacity. |
800 V class pack (NMC example) | Pack architecture | About 710 V at 192 cells in series | About 806 V at 4.2 V per cell | Doubling series count doubles voltage. Insulation and clearance design must follow. |
State of charge window | Concept | Not applicable | Not applicable | Manufacturers usually limit the usable window to protect cell life, so usable and gross capacity differ. |
Voltages are typical values for general planning. Use the cell supplier datasheet for actual nominal, minimum and maximum voltage and temperature limits.
Cell lot traceability review
Optional: we can discuss how cell lots and supplier data could be traced through your ERP and quality records.
Optional. The tool and every export work without this. No spam.
How to use the table
Search by format name, such as 21700, or by chemistry, such as LFP. Cylindrical, prismatic and pouch rows describe the physical format, and the chemistry rows describe the electrochemistry and voltage. A real cell is one of each, for example a prismatic LFP cell. Use the pack architecture rows to estimate series count for a target voltage class and export the filtered rows to Excel for a sourcing comparison.
Format versus chemistry
Format controls how the cell is packaged, cooled and mounted. Chemistry controls voltage, energy density, safety margin and life. Because they are independent, the same chemistry can be supplied in several formats. Compare like with like when evaluating suppliers: an NMC pouch cell and an LFP prismatic cell have different voltage, so a pack needs a different series count for the same system voltage.
- Format: cylindrical, prismatic or pouch
- Chemistry: LFP, NMC, NCA, LTO and others
- Series count equals pack voltage divided by cell voltage
Worked example for series count
A 400 V class pack built from NMC cells at 3.7 V nominal needs about 108 cells in series for 400 V nominal, or 96 in series if the target is around 355 V. With 4.2 V maximum, 96 cells reach about 403 V at full charge. An LFP pack at 3.2 V per cell needs about 125 cells in series to reach 400 V nominal. These numbers show why chemistry choice changes the bill of materials and the battery management channel count.
Common mistakes
Do not use the nominal voltage to size insulation or clearances. Use the maximum charge voltage, plus margin. Do not compare energy density figures taken at different levels, cell, module or pack. And do not assume that a format name guarantees interchangeability, since tabs, venting and terminals differ between suppliers even for the same nominal size.
Frequently Asked Questions
Which cell chemistry has the highest nominal voltage?
Among the common ones, NMC, NCA, LCO and LMO sit around 3.6 to 3.7 V nominal, higher than LFP at 3.2 V and LTO at about 2.3 to 2.4 V. Higher voltage per cell means fewer cells in series for a given pack voltage.
Why does a 4680 cell matter?
It is a larger cylindrical format than 21700. Larger cells reduce the number of cells, tabs and connections per pack, which can simplify assembly. Performance still depends on the chemistry and the supplier design.
Is LFP safer than NMC?
LFP is generally regarded as more thermally stable, but pack safety depends on the full design: cell quality, the battery management system, cooling and propagation protection. Use supplier test data, not the chemistry alone.
Can I use these voltages for design sign-off?
No. They are typical values for estimating. Always design from the cell supplier datasheet, which gives the exact nominal, minimum and maximum voltage and temperature limits for the specific cell.
Tracking cells, lots and supplier data across ERP and quality systems is a common pain point. Netray can discuss a private assistant that answers these questions from your own records.
Related Tools
Battery Pack Series Parallel Configuration Calculator
Enter series and parallel counts and cell data to get pack voltage, Ah, kWh, cell count, cell mass and power at a chosen C rate.
Industry TemplatesEV Charging Connectors, Modes and Protocols Reference
Look up the common EV charging connector types, charging modes and communication protocols, with region and typical use.
Quality & InspectionEV Battery Pack End-of-Line Test Checklist
A checklist of the typical end-of-line checks for a battery pack: electrical safety, BMS, leak and enclosure, torque and traceability.
Engineering & PLMIP Ingress Protection Code Reference (IEC 60529 and ISO 20653)
Look up the two digits of an IP code under IEC 60529 and the automotive IP6K9K style ratings, with a plain summary of each test.
More Industry Templates tools
See all- ICE to EV Transition Readiness Assessment for Suppliers
- Distributor Free Freight Policy Template
- Job Shop Quote Cover Letter Template
- Monthly Operations Review Meeting Pack Template
- OEE Improvement A3 Charter Template
- Sheet Metal Job Traveler Template
- Press Brake Setup Sheet Template
- Sheet Metal Cut List and Material Takeoff Worksheet
- Welding Wire Deposition Rate Calculator
Keep exploring
Free tools
- EV Battery Pack Cost CalculatorBuild up the cost of an EV battery pack per unit and per kWh from cells, non-cell content, assembly labor, scrap and overhead.
- Battery Pack Series Parallel Configuration CalculatorEnter series and parallel counts and cell data to get pack voltage, Ah, kWh, cell count, cell mass and power at a chosen C rate.
- EV Battery Pack End-of-Line Test ChecklistA checklist of the typical end-of-line checks for a battery pack: electrical safety, BMS, leak and enclosure, torque and traceability.