Welding Wire Deposition Rate Calculator
Deposition rate is the kilograms of weld metal you put into the joint per arc hour. This calculator derives it from wire diameter, wire feed speed and deposition efficiency, then sizes the wire you need to buy for a given amount of weld metal.
Your numbers
Solid MAG wire is often 93 to 98 percent; flux cored wire is typically lower.
Carbon steel is about 7.85. Stainless is about 7.9 to 8.0, aluminium about 2.7.
Your results
Calculated from geometry. Real deposition also depends on stickout, gas, polarity and transfer mode; verify against the filler metal data sheet.
Deposition rate (kg/h) vs wire feed speed
Sweeps Wire feed speed from 2 to 20, holding your other inputs fixed.
Consumables reconciliation review
Share how wire and gas are issued and we will outline a variance report from your ERP data.
Optional. The tool and every export work without this. No spam.
How to use it
Pick the wire diameter and set the feed speed you actually run. Enter deposition efficiency from the wire data sheet, or use a conservative figure. Add the weld metal weight for the job from your weld volume estimate. You get the deposition rate, the wire to purchase and the arc time. The chart shows how rate scales with feed speed so you can judge whether a faster setting is worth the loss of control and extra spatter.
The formula
Wire cross-section equals pi times diameter squared over four, in mm2. Multiply by feed speed in m/min and by 60 minutes, then by density in g/cm3 and divide by 1000 to get kg of wire per hour. Multiplying by deposition efficiency gives weld metal per hour. A 1.2 mm solid steel wire at 8 m/min feeds about 4.3 kg/h and deposits about 4.0 kg/h at 95 percent.
Reading the result
Arc time is not job time. Real fabrication achieves an operating factor well under 100 percent because of fit-up, repositioning, cleaning and inspection. Use the arc hours output together with a realistic operating factor in your labor estimate. For wire purchases add a margin for spool ends, restarts and rework instead of stretching the efficiency figure.
- Solid MAG: high efficiency, low slag
- Flux cored: lower efficiency, higher rate in position
- Metal cored: less slag, efficiency in between
Common mistakes
Do not take the maximum deposition rate printed in a brochure as a daily average. Rates quoted for flat position do not hold for vertical or overhead work. Also keep units straight: m/min versus in/min, and kg versus lb. Using current instead of wire feed speed will mislead, because current changes with stickout while feed speed stays fixed.
Frequently Asked Questions
How do I convert wire feed speed to kg/h?
Multiply the wire cross-section in mm2 by feed speed in m/min, by 60, by density in g/cm3, then divide by 1000. For 1.2 mm steel wire at 8 m/min this gives about 4.3 kg/h of wire fed.
What is deposition efficiency?
It is the share of the consumed wire that ends up in the weld rather than as spatter, fume or slag. Solid MAG wire is commonly high 90s percent. Flux cored wires lose more as slag, so they are lower.
Does shielding gas change deposition rate?
Not the wire melt rate for a given feed speed, but it changes spatter and therefore efficiency. Argon rich mixes usually spatter less than pure CO2, which raises the usable share of the wire.
Is arc time the same as welding time?
No. Arc time counts only the seconds the arc is on. Include an operating factor, often between 20 and 60 percent for manual work, to get paid labor hours.
If you want purchased wire, weld hours and actual jobs reconciled inside your ERP, Netray can help build that reporting on your own data.
Related Tools
Welding Heat Input Calculator
Compute arc energy and net heat input from amps, volts, travel speed and process efficiency, and see how speed changes the result.
Industry TemplatesShielding Gas Consumption and Cost Calculator
Estimate monthly shielding gas use, cost and cylinders from flow rate, arc-on time and purge time per weld.
Industry TemplatesStick Electrode Consumption and Stub Loss Calculator
Work out how many stick electrodes and how many kilograms to buy for a given weld metal weight, including stub loss and yield.
Industry TemplatesPipe Welding Diameter-Inch Cost Calculator
Convert pipe size and weld count into diameter-inches, then estimate cost and crew hours at your rate and productivity.
More Industry Templates tools
See all- Welder Duty Cycle Calculator
- Welding Power Consumption and Cost Calculator
- AWS Welding Symbols Reference
- AWS Filler Metal Classification Reference
- Welding Position Codes Reference (AWS and ISO)
- Welding Shielding Gas Selection Reference
- Distributor Free Freight Policy Template
- Job Shop Quote Cover Letter Template
- Monthly Operations Review Meeting Pack Template
Keep exploring
Free tools
- Welding Process Deposition Efficiency and Operating Factor ReferencePlanning ranges for deposition efficiency, operating factor, deposition rate and typical use by arc welding process.
- Welding Cost Calculator (Per Meter and Per Joint)Turn weld metal weight, deposition rate and shop rates into filler, gas, labor and total cost per meter of weld.
- Welding and Fabrication Quote Proposal TemplateFill in job, code, inspection, pricing and terms to produce a clear quote for a welded fabrication job.
Guides
- How to Estimate Welding Cost for a Fabrication QuoteHow fabricators estimate welding cost: weld volume, deposition rate, arc-on time, filler efficiency, and where AI helps pull actual hours from past jobs.
- Wire Forming Cost Estimate: Setup, Run Rate and ScrapHow to estimate wire forming cost per piece: wire length, CNC wire former setup, cycle time, secondary operations, scrap and quantity breaks for wire form shops.
- ERP for Spring and Wire Form ManufacturersWhat spring and wire form makers need from ERP: wire lot tracking, coiler routings, secondary operations, load test records and job costing by part family.
AI on your ERP
- AI for E2 Shop System in Metal Fabrication: Quote History, Material Yield and Delivery RiskPrivate AI for E2 Shop System fabricators: sheet and plate quoting history, nesting yield, welding job costs and delivery risk, answered from your own data.
- AI for Dynamics 365 Business Central in Metal FabricationPrivate AI for Business Central metal fabricators: quote-to-job costing, heat-lot traceability, outside processing and remnant stock grounded in your data.