Broker vs Franchise Component Buy Cost Calculator
When a part is on allocation, the franchise lead time may be 40 weeks while a broker can ship next week at four times the price. This calculator puts both options on one number: the extra purchase cost, the testing bill, the expected loss from a bad lot, and the value of the days you save.
Your numbers
Visual, X-ray, decap sample, electrical test, lab fees.
Your own estimate for this broker and part type.
Rework, field returns, recall handling, customer penalties.
Your results
Planning model. Probabilities are your estimates, not statistics. Use test labs and your quality system for acceptance decisions.
Net benefit vs probability the lot is bad
Sweeps Probability the lot is bad from 0 to 30, holding your other inputs fixed.
Spot-buy history from your ERP
Optional: see how supplier approval, receipt and quality history could be shown next to a broker quote.
Optional. The tool and every export work without this. No spam.
How to use the calculator
Enter the quantity and both unit prices, then the cost of authentication testing for the lot. Set the probability that the lot is bad and the chance your test plan catches it. Enter what a bad lot would cost if it reached product, and what you could recover from the broker if you catch it. Finally enter the days you save and your daily cost of waiting. The primary result is the net benefit of buying from the broker.
- Use a delay cost based on real line-down or penalty exposure, not a guess of lost sales.
- Keep the bad-lot probability honest. Use a higher value for obsolete or high-demand parts.
- Run the chart to see how quickly the answer flips as risk rises.
The model behind it
The model is an expected-value comparison. Broker all-in cost is purchase plus testing plus two expected losses. If a bad lot slips through, you pay the failure cost. If testing catches it, you lose the unrecovered share of the purchase. The value of speed is days saved times the daily delay cost. Net benefit equals that value minus the extra expected cost over the franchise price. It does not model risk aversion, so a safety-critical or defense application may justify a higher bar than break-even.
Reading the result
A strongly positive net benefit suggests the broker route is rational if testing is done properly. Near zero, prefer franchise or a partial buy. Negative means you are paying for speed you do not need. For regulated work, many contracts restrict independent distributor purchases, so check your flowdown requirements before using any number from this page. AS6081 and AS5553 describe counterfeit avoidance practices that buyers commonly reference.
Common mistakes
The usual error is leaving out the cost of a bad lot reaching product, which makes every broker buy look cheap. The second is treating testing as perfect. Sampling reduces risk but does not eliminate it, which is why the detection rate is an input. Also remember that a broker price today can fall when allocation eases, so a spot buy for the whole build quantity is not always necessary.
Frequently Asked Questions
Is a broker buy always counterfeit risk?
No. Many independent distributors sell genuine surplus. Risk depends on the part, the source and the test plan. The calculator lets you enter a low probability for a trusted source and a higher one for an unknown source.
What testing should I budget?
Typical plans combine external visual inspection, marking permanence, X-ray or acoustic scanning, and electrical sampling, with decapsulation for higher-risk parts. Lab quotes vary widely, so use your actual quote for the lot.
How do I estimate the cost of delay?
Add idle labor, expediting freight, contractual late penalties and deferred revenue margin per day. Avoid counting the same loss twice. Ask finance for the contribution margin per day of a stopped line.
Can I split the buy between franchise and broker?
Yes. Run the calculator for the quantity you need now from the broker, and keep the balance on a franchise order. Splitting limits exposure while still covering the near-term gap.
If your ERP holds approved vendor status, receipt inspection results and past nonconformances, Netray can help surface that history at the moment a buyer evaluates a spot buy.
Related Tools
Component Shortage Line-Down and Expedite Cost Calculator
Put a number on a missing part: idle labor, unrecovered output and penalties, against the cost of an expedited buy.
Aerospace & DefenseCounterfeit Parts Risk Assessment (AS5553)
A 10-question assessment of your counterfeit electronic parts exposure, aligned to AS5553 and DFARS counterfeit prevention requirements, with a risk band and mitigation plan.
Supply Chain & InventoryReel MOQ Overbuy and Carrying Cost Calculator
Decide between a full reel at the MOQ and cut tape by comparing all-in unit cost with carrying and obsolescence cost.
Electronics ManufacturingComponent Obsolescence Risk Assessment
Answer 10 questions to score how exposed your BOMs are to component EOL, DMSMS, and lifecycle blind spots, with graded recommendations.
More Supply Chain & Inventory tools
See all- PCBA RFQ Request for Quote Template
- Component Lead Time Risk Worksheet
- Approved Vendor List (AVL) Template
- Electronic Component Distributor Quote Comparison Worksheet
- SMT Reel and MOQ Buy Quantity Calculator
- Electronic Component Sourcing Resilience Assessment
- Oracle Fusion Inventory Turns and Carrying Cost Calculator
- Distribution ERP Fill Rate Calculator
- Distributor Rebate Tracking Worksheet
Keep exploring
Free tools
- Texas Franchise Tax Margin CalculatorEstimate Texas franchise tax by comparing the four margin methods, apportioning to Texas receipts and applying the no tax due threshold.
- Component Lead Time Risk WorksheetScore each electronic component for lead time risk using quoted vs historical lead time, stock cover and source count, then export the ranked list to Excel.
- PeopleSoft Integration Broker Tables and Message Status ReferenceFind the Integration Broker tables behind the asynchronous and synchronous monitors, what each message status means, and what to do about errors, retries and growth.
ERP fixes and how-tos
- How to Add a Private AI Layer to PeopleSoft On-PremReference architecture for AI on PeopleSoft FSCM and HCM: PS Query and Integration Broker access, security join tables, a local model and approved write-back.
- QAD Says "Unable to Connect to the Application Server": How to Fix ItQAD Enterprise Applications cannot connect to the application server. Check the AppServer broker status, licensing, firewall, and connection string to fix it fast.
Guides
- AI for Component Shortages and Obsolescence in EMSUse AI to handle component shortages, PCNs, EOL notices and last time buys in EMS: match alerts to open jobs and BOMs, with engineers approving every change.
- Build vs Buy: The Real Cost of Enterprise AI AgentsBuild vs buy AI agents for the enterprise: total cost, timelines, and risk compared for manufacturers, with a decision framework CIOs can use today.
- How to Quote PCB Assembly From a Customer BOMStep by step PCB assembly quoting from a customer BOM: part matching, price breaks, lead time risk, overage and attrition, and quote validity for EMS shops.