Supply Chain & InventoryFree templatePDF, Excel, Word exportMexico

Carta Porte Shipment Data Sheet Template

Mexican road shipments of goods generally travel with a CFDI carrying the Carta Porte complement. The complement is only as good as the data that reaches the ERP, so use this sheet to collect it before the truck leaves.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

Carta Porte CFDI Shipment Data Sheet

Carta Porte Shipment Data Sheet

Issuer: Manufacturas del Norte S.A. de C.V. (MNO010101AB1) CFDI type: CFDI de traslado (T) Shipment reference: SHP-2026-004871 International transport: Yes, exit (export)

Locations

LocationAddressDate and time
OriginParque Industrial Apodaca, Apodaca, Nuevo Leon, CP 666002026-10-21 06:00
DestinationPuerto Seco, Nuevo Laredo, Tamaulipas, CP 880002026-10-21 18:00

Distance

Travelled distance: 230 km

Goods

Description: Machined aluminum housings, 24 pallets SAT goods key: 25174700 Gross weight: 8400 kg

Transport

ItemValue
CarrierTransportes Frontera S.A. de C.V.
Permit typeTPAF01
Permit numberNL-123456
Vehicle configurationT3S2
Plate12AB3C
InsuranceAseguradora Ejemplo, policy 99887766

Driver

Juan Perez Lopez, licence NL-7788990

Pre-departure check

CheckDone
Receiver and sender RFC verified
Goods keys and units valid in SAT catalogs
Weight matches packing list
Stamped CFDI and PDF travel with the driver

Approvals

Shipping coordinator / Date
Driver / Date
Logistics manager / Date

This is a data collection sheet, not the stamped complement. The Carta Porte complement is issued as part of a CFDI through your ERP or a PAC, and its version and validation rules change, so confirm fields against the current SAT guide. Sample values are fictitious.

Shipping data automation

Optional: we can scope how to feed shipment data from your ERP into the complement.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the sheet

Fill the fields for each shipment or paste them from your transport management data, then export the document to PDF or Word. Use it as the dispatch packet for new lanes, as the data requirement list when you configure your ERP or PAC, or as a training aid for shipping clerks. The pre-departure table gives the clerk a last check before release.

What the complement needs

The complement describes the movement: where it starts and ends with dates, the distance, the goods with SAT product keys, units and weights, the vehicle with permit type, permit number, configuration, plate and insurance, and the people involved such as the driver and, for some cases, the owner or lessee. International movements add the entry or exit indicator and customs data.

  • Origin and destination with postal codes and times
  • Goods with SAT keys, quantity, unit and weight
  • Vehicle permit, configuration, plate and insurance
  • Driver identification and licence

Making it work in the ERP

The most reliable approach stores static data once: location master data with postal codes, a carrier master with permits and insurance, and an item master with SAT keys and weights. Shipping then only adds the plate, the driver and the quantities. Weight is the usual friction point, so make net and gross weights part of item and packaging master data rather than free-typed values.

Common mistakes

Frequent problems include mismatched weights between the complement and the packing list, expired permits or insurance, wrong SAT goods keys and missing distance. Authorities can check shipments on the road, so a shipment without a valid complement may be detained. Verify the carrier credentials before assigning loads and keep evidence of the checks.

Frequently Asked Questions

What is Carta Porte?

It is a complement to the Mexican CFDI that documents the transport of goods, including origin, destination, goods, vehicle and driver data. It is generally required when goods move on Mexican federal roads, with some exceptions set by SAT.

Who issues the Carta Porte?

It depends on who owns the goods and provides the service. A carrier issues a CFDI for the transport service, and an owner moving its own goods issues a transfer CFDI with the complement. Confirm the rule for your case with a tax advisor.

Does this template stamp the complement?

No. It collects the data and creates a dispatch document. The stamped complement comes from your ERP or a PAC after validation against SAT catalogs.

Why do the weights matter?

Authorities compare the declared weight with the real load. Differences between the complement, packing list and actual load can cause fines or detention, so base declared weights on controlled master data.

If your shipping data lives in the ERP but the complement is assembled by hand, we can help automate data collection and validation before stamping.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

Manufacturing hubs

Integrations