China Sourcing Landed Cost Calculator
FOB price is only the start. Freight, insurance, duty, customs fees and brokerage can add a third or more to the cost, and tariff changes move it fast. This calculator builds landed cost per unit and lets you sweep the duty rate.
Your numbers
Charged on 110 percent of cost plus freight.
Combine the base rate and any additional tariffs for your HTS code.
The actual fee has a minimum and maximum per entry.
Your results
Estimate for planning. MPF and HMF have minimums and caps, rates change, and special programs or exclusions may apply. Confirm duty with your customs broker.
Landed cost per unit vs duty rate
Sweeps Total duty and tariff rate from 0 to 100, holding your other inputs fixed.
Landed cost in your ERP
Optional: we can help set up delivered cost components and variance reporting in your ERP.
Optional. The tool and every export work without this. No spam.
How to use it
Enter the FOB unit price, quantity, ocean freight, insurance rate and the combined duty rate for your HTS code. Add broker and drayage costs as a lump sum. The result is total landed cost, landed cost per unit and the uplift over FOB. Use the chart to see where a tariff increase makes a China source more expensive than a nearby supplier, then load the per-unit result into your ERP item cost or purchase price variance analysis.
The formulas
Insurance is (goods plus freight) times 1.1 times the rate, following the usual 110 percent convention. Duty is customs value times the duty rate. In US imports customs value is generally FOB, not including international freight. MPF and HMF are percentages of value, with minimum and maximum limits per entry that this simple model does not apply.
- Landed = goods + freight + insurance + duty + MPF + HMF + broker
- Landed per unit = landed / units
- Uplift = landed per unit / FOB unit - 1
Common mistakes
Buyers often quote a part against FOB price and ignore duty stacking. Section 301 style additional duties apply on top of base rates and differ by HTS code, so always use the current combined figure. Another mistake is dropping small orders into the model without the fixed fees, which makes small lots look cheaper. In SAP, Oracle, Epicor or Infor, model the cost elements as planned delivered cost components so purchase price variance reflects reality.
Frequently Asked Questions
Is the duty applied to freight?
For US imports, customs value is generally the transaction value, which normally excludes international freight and insurance. Rules differ in other countries, such as CIF valuation in many markets, so confirm for your destination.
Can I use it for non-US destinations?
Partially. Replace MPF and HMF with zero, change the duty to your destination rate and add import VAT separately. Many countries value goods at CIF, so add freight and insurance to the duty base mentally.
How do I find the duty rate?
Classify the part under the Harmonized Tariff Schedule, then add any extra duties that apply to China-origin goods. A licensed customs broker can confirm the combined rate for your product.
Do MPF limits matter?
Yes for very small or very large entries because the fee is bounded by a minimum and maximum. For mid-size entries the percentage is a fair approximation. Check current limits at the customs authority.
If you want landed cost components captured automatically in your ERP purchasing flow, we can help design the cost elements and reports.
Related Tools
China Export VAT Refund Calculator (Exempt, Offset, Refund)
Estimate the refund, the VAT that stays in cost, and the carry-forward credit for an export order under the exempt, offset and refund (mian di tui) method.
Costing & FinanceRMB/USD Contract Margin and Breakeven FX Calculator
Find the margin on a USD-priced order built with RMB costs, the breakeven exchange rate and the profit swing per 1 percent move.
Supply Chain & InventorySpring Festival Supply Buffer Calculator (Pre-Build and Safety Stock)
Work out how much extra stock to order before Spring Festival so a supplier shutdown does not stop your line.
More Supply Chain & Inventory tools
See all- Oracle Fusion Inventory Turns and Carrying Cost Calculator
- Distribution ERP Fill Rate Calculator
- Distributor Rebate Tracking Worksheet
- Branch Transfer Planning Worksheet
- Distributor Slow-Moving Inventory Review Worksheet
- Distributor Vendor Performance Scorecard Worksheet
- Distributor GMROI Calculator
- Distributor Backorder Cost and Fill Rate Calculator
- EOQ with Vendor Minimum Order Calculator
Keep exploring
Free tools
- China Import Landed Cost CalculatorTurn a CNY supplier quote into a USD landed cost per unit, and see how the exchange rate moves it.
- China Sourcing RFQ Quote Comparison WorksheetLine up factory quotes on landed unit cost including freight, duty and tooling per piece so the cheapest price is not the wrong choice.
- China EXW to FOB, CIF and DDP Price Conversion CalculatorCompare supplier quotes on the same basis by adding the costs between EXW, FOB, CIF and delivered duty paid.
ERP fixes and how-tos
- Landed cost in SAP MM: planned and unplanned delivery costsHandle freight, duty and delivery costs in SAP MM: planned vs unplanned delivery costs, condition types, GR/IR posting and the effect on material valuation.
- Oracle Fusion Procurement: approved requisition not creating a purchase orderWhy an approved Oracle Fusion requisition never becomes a purchase order: procurement agent, sourcing, Process Requisitions, document style and BU setup.
- SAP open purchase orders report: ME2N, ME2M, ME2L and the underlying tablesHow to list open purchase order quantities in SAP with ME2N, ME2M and ME2L, which tables hold the data, and how to calculate open quantity from EKBE.
Runs with your ERP
- Avalara AvaTax with SAP S/4HANA Cloud Public Edition: US sales tax for manufacturersHow Avalara AvaTax adds US sales tax calculation to SAP S/4HANA Cloud Public Edition: extension model, data flows, setup, pitfalls and private AI.
- Asprova APS and SAP ECC: Finite-Capacity SchedulingHow Asprova finite-capacity scheduling complements SAP ECC and S/4HANA: flat file or OLE DB exchange, data flows, setup, pitfalls and a private AI layer.
Guides
- Reshoring Opportunities for Small Machine Shops and How to Quote ThemHow small US machine shops can capture reshoring work: what buyers actually need, how to quote total landed cost against offshore, and the capacity traps to avoid.
- Tariffs and Trade Compliance in the Manufacturing Supply ChainTariffs and trade compliance in the supply chain: HTS classification, country of origin, Section 232/301 duties, FTAs, and landed cost in your ERP.
AI on your ERP
- AI for ERP Across the US Defense Supply ChainA CIO's guide to adding AI on top of the ERP defense primes and tier 2-3 suppliers already run, without adding a compliance risk the program cannot absorb.
- A CIO's Guide to Sequencing AI on Your Manufacturing ERPA practical CIO guide to sequencing AI on top of your manufacturing ERP: where to start, how to budget, who should own it, and how to avoid a pile of stalled pilots.
Integrations
- How to add a mobile app to Epicor KineticBuild or choose a mobile app for Epicor Kinetic: barcode scanning, labor reporting, inventory moves and approvals over the REST API, with offline handling.
- How to build an MCP server for Epicor KineticDesign a Model Context Protocol server for Epicor Kinetic: which read tools to expose, BAQ and REST v2 mapping, auth, stdio vs HTTP transport and audit logging.