China Supplier Quote Comparison Worksheet (VAT Adjusted)
Quotes from Chinese suppliers arrive in different formats: some include 13 percent VAT, some do not, and Incoterms, tooling and MOQ differ. This worksheet normalizes them so a buyer can compare real cost.
| Supplier | City | Quoted terms | Quoted unit price (incl. VAT) | VAT rate (%) | Unit price ex-VAT | MOQ | MOQ order value ex-VAT | Tooling charge | First order cost | Lead time (days) | |
|---|---|---|---|---|---|---|---|---|---|---|---|
CNY 13 | CNY 25,398 | CNY 43,398 | |||||||||
CNY 12 | CNY 61,504 | CNY 73,504 | |||||||||
CNY 13 | CNY 13,451 | CNY 35,451 | |||||||||
CNY 12 | CNY 37,282 | CNY 46,282 | |||||||||
CNY 12 | CNY 31,195 | CNY 46,195 |
Compare quotes on the same Incoterm before ranking. Mainland general taxpayers usually quote at 13 percent VAT for goods, while small-scale taxpayers may quote around 3 percent, so a lower sticker price can hide a lack of deductible input VAT for the buyer. Export buyers should confirm whether the quote includes VAT and whether the exporter can claim the refund.
Supplier comparison from your ERP
Optional: a read-only sourcing report built from your approved vendor and purchase history data.
Optional. The tool and every export work without this. No spam.
How to use it
Add one row per supplier. Enter the quoted unit price, the VAT rate included in that price, the MOQ, any tooling charge and the lead time. The sheet removes VAT to show an ex-VAT unit price, then calculates the MOQ order value and the first order cost, which is price times MOQ plus tooling. If a quote is already ex-VAT, set the VAT rate to zero. Add rows with the button, delete those you do not need, and export the final table to Excel for your RFQ file.
Why VAT-adjusted comparison matters
In China, general VAT taxpayers charge 13 percent on most manufactured goods, while small-scale taxpayers use a simplified rate that has often been 3 percent. Quoted prices may or may not include these. Comparing a VAT-inclusive quote to an ex-VAT quote overstates the cost gap by more than 10 percent. For export business, domestic VAT is generally neutralized by the refund or exemption system, so the economic base is the ex-VAT price.
- Ex-VAT price = quoted price / (1 + VAT rate)
- First order cost = ex-VAT price x MOQ + tooling
- Always compare on one Incoterm
- Ask for the special fapiao if input VAT matters
Reading the result and common mistakes
The lowest unit price is rarely the cheapest first order, because tooling and MOQ push cost up. A supplier with a slightly higher price and low MOQ can win for pilot runs. Mistakes include comparing EXW to FOB, forgetting freight and duty after the comparison, ignoring payment terms, treating a tooling charge as free when the supplier keeps the mold, and not recording the quote date. Use the lead time column to flag suppliers that cannot meet the schedule.
Frequently Asked Questions
What VAT rate should I enter?
Use the rate shown on the quote or the supplier's taxpayer status. Many goods are at 13 percent for general taxpayers, and small-scale taxpayers may charge a reduced simplified rate. Ask the supplier to state it.
Why does the sheet include tooling in the first order?
Tooling is often paid upfront and affects cash and break-even volume. Including it in the first order cost prevents a cheap unit price from hiding a large tooling charge.
Can I add extra columns?
The worksheet has fixed columns, but you can export to Excel and add freight, duty, payment terms and quality scores. Keep the VAT-adjusted base so later changes remain comparable.
Should I compare different Incoterms?
Only after adding the cost to bring them to the same point. EXW excludes export clearance and freight, while DDP includes almost everything. Convert before ranking.
If quotes and approved vendors live in your ERP, Netray can help turn this comparison into a repeatable sourcing report. We can build it privately on your own side.
Related Tools
China Sourcing Landed Cost Calculator (FOB to US Delivered)
Build the true delivered cost per unit of a China FOB purchase, then test how a tariff change moves it.
Supply Chain & InventoryUS Duty Calculator for China Imports (Section 301, MPF, HMF)
Estimate total US duties and fees on a shipment from China and see how total cost moves as the additional tariff rate changes.
Supply Chain & InventoryChina Supplier RFQ (Request for Quotation) Template
A fill-in RFQ document that makes Chinese suppliers quote on the same terms: volumes, Incoterm, VAT basis, tooling, quality and payment.
Supply Chain & InventoryRaw Material Index Price Adjustment Calculator (China Suppliers)
Calculate the new unit price and annual cost impact when copper, steel or resin indexes move, using a deadband and a pass-through share.
More Supply Chain & Inventory tools
See all- China Customs HS Code Classification Worksheet
- China EXW to FOB, CIF and DDP Price Conversion Calculator
- Oracle Fusion Inventory Turns and Carrying Cost Calculator
- Distribution ERP Fill Rate Calculator
- Distributor Rebate Tracking Worksheet
- Branch Transfer Planning Worksheet
- Distributor Slow-Moving Inventory Review Worksheet
- Distributor Vendor Performance Scorecard Worksheet
- Distributor GMROI Calculator
Keep exploring
Free tools
- Supplier RFQ Quote Comparison WorksheetCompare supplier quotes on landed cost: unit price, freight, duty, MOQ and lead time per supplier, with extended cost and price spread calculated.
- China Supplier RFQ (Request for Quotation) TemplateA fill-in RFQ document that makes Chinese suppliers quote on the same terms: volumes, Incoterm, VAT basis, tooling, quality and payment.
- China Sourcing RFQ Quote Comparison WorksheetLine up factory quotes on landed unit cost including freight, duty and tooling per piece so the cheapest price is not the wrong choice.