Infor XA (MAPICS) Application Module Reference
Most Infor XA (MAPICS) sites have a long history of customisation, and nobody is sure which modules are still used. This reference lists the main application areas with scope, typical users and one migration point each, so you can build an honest inventory.
| Application area | What it covers | Typical users | Migration consideration |
|---|---|---|---|
Customer Order Management | Order entry, pricing, allocation, shipping and invoicing triggers | Customer service, sales admin | Pricing rules and order status history need mapping |
Inventory Management | Item balances, locations, transactions, cycle counting | Stores, inventory control | Decide how many years of transactions to carry |
Bill of Material | Product structures, where used, effectivity | Engineering | Clean obsolete structures before loading |
Product Data Management | Engineering change control and item revisions | Engineering, document control | Revision history may need a separate archive |
Master Production Scheduling | Planning of end items and forecasts at the schedule level | Master scheduler | Planning parameters rarely map one to one |
Material Requirements Planning | Net requirements, planned orders, action messages | Planners, buyers | Lead times and lot sizing rules must be validated |
Capacity Requirements Planning | Load against work centers from planned and released orders | Production planning | Work center calendars need recreating |
Shop Floor Control | Manufacturing orders, routing, labor and material reporting | Supervisors, planners | Open orders usually closed or reloaded at cutover |
Product Costing | Standard cost roll up, variances | Cost accountants | Costing method differences affect opening inventory value |
Purchasing | Purchase orders, receipts, vendor performance | Buyers, receiving | Open purchase orders and vendor terms need loading |
Accounts Receivable | Customer invoices, cash application, aging | Credit and collections | Open items at cutover date, not history |
Accounts Payable | Vendor invoices, payments, aging | Accounts payable clerks | Open items and vendor bank details |
General Ledger | Chart of accounts, journals, period close, reporting | Controller, accountants | Account structure and opening balances |
Sales Analysis | Sales history and statistics by customer and item | Sales management | Often replaced by a reporting tool, keep an archive |
Forecasting | Statistical demand forecasts from history | Planners | Needs history exported as input to the new system |
Distribution Requirements Planning | Replenishment across plants and warehouses | Supply chain | Network structure may change in the new design |
Product Configurator | Rules based configuration of products to order | Sales engineering | Rule logic is often the hardest item to reproduce |
Module names and packaging varied across Infor XA releases and over the years of local customisation. Use this as an inventory prompt and confirm which areas are actually licensed and in daily use at your site.
Legacy XA inventory review
An optional review of your module inventory and custom program list with a migration view.
Optional. The tool and every export work without this. No spam.
How to use the reference
Search for an area, then confirm three things with your users: is it licensed, is it used daily, and who owns the data. Export the table to Excel and add columns for owner, customisation count and retire, migrate or replace. A one page view of what the business really uses is the best input for any decision about staying, upgrading or moving.
- Interview the user, not only the administrator
- Add a column for customisations per area
- Mark each area retire, migrate or replace
Why the inventory matters
XA runs on IBM i, where custom RPG programs, query files and spreadsheets pulling data often sit outside any documentation. A module that looks small on paper can hold heavy custom logic, especially configurator, pricing and shop floor reporting. Counting those dependencies early prevents the typical surprise late in a replacement project.
Common mistakes
Teams often assume a standard module maps cleanly to a module in the target system. In practice, costing, planning parameters and configurator rules differ in structure, so treat them as design work. Another mistake is loading all history. Decide per area whether you need open items only, summarised history or a full archive.
- Do not assume one to one module mapping
- Decide history depth per area
- Keep read only access to the old system after cutover
Frequently Asked Questions
Is MAPICS the same as Infor XA?
MAPICS was the original product name for the manufacturing ERP. Infor XA is the name it carried after Infor acquired the vendor. Many people still say MAPICS, so both terms appear in searches and in internal documentation.
How do I find which modules we actually use?
Combine three sources: your license list, job and program usage on the IBM i, and interviews with department heads. Usage evidence from job logs is more reliable than recollection when settling whether a module is still in use.
Do we need every module in a replacement?
Not necessarily. Some areas such as sales analysis or forecasting may be better served by a reporting or planning tool. Decide area by area whether to replace, merge into another module, or retire.
What about custom RPG programs?
List them with the files they read and write, and who runs them. Many perform work that the target system handles natively, while others encode business rules that must be rebuilt as configuration or extension.
If you are planning to retire XA, we can help catalogue custom programs and queries and build a read only query layer over the legacy data for the transition.
Related Tools
IBM i Commands for Infor XA Administrators Reference
A lookup of common IBM i CL commands for jobs, output, libraries, objects, data and backups, with what each is for.
Developer ToolsInfor XA DB2 for i SQL Extract Generator
Fill in library, file, columns and filter to get a limited SELECT, a row count check and a CPYTOIMPF command to produce a CSV.
ERP Migration & SelectionInfor VISUAL and XA Legacy System Risk Assessment
Ten questions that score how exposed your VISUAL or XA system is on support, skills, hardware, customisation and integrations.
Other ERPsInfor VISUAL Database Table Reference
A searchable lookup of the main VISUAL Manufacturing tables, what each holds and the usual join keys, for report writers and analysts.
More Other ERPs tools
See all- Infor XA (MAPICS) Period End Close Checklist
- Infor VISUAL Work Order Status and Structure Reference
- Infor VISUAL Manufacturing Scheduling Checklist
- Acumatica Generic Inquiry Design Template
- Acumatica Manufacturing Edition Setup Checklist
- Sage X3 Import Template Worksheet
- Acumatica Implementation Budget Estimator
- Sage Intacct Objects and Standard Dimensions Reference
- Sage 300 Database Table Reference
New to Infor XA? Start with the Infor XA guide and toolkit.
Keep exploring
Free tools
- MAPICS and Infor XA Private AI Layer Blueprint GeneratorGenerate a shareable architecture plan for adding a private, on-prem AI assistant to MAPICS and Infor XA, with components, security controls and a three-phase rollout.
- Infor XA (MAPICS) Migration Readiness AssessmentTen questions that score how ready you are to move off Infor XA (MAPICS), covering customizations, IBM i dependencies, data quality and ownership.
- Infor XA (MAPICS) Period End Close ChecklistA step by step period end checklist for XA (MAPICS) sites covering cutoff, inventory, work in process, receivables, payables and the ledger.
ERP fixes and how-tos
- Infor XA costing: cost types, roll-up and standard cost setupHow product costing works in Infor XA (MAPICS): standard versus current cost, how roll-up builds cost from BOM and routing, setup order, and common pitfalls.
- Infor XA REST API: expose XA through IBM i Integrated Web Services or IONHow to expose Infor XA (MAPICS) data and functions as REST on IBM i using Integrated Web Services or ION, with an example call and the safety rules for writes.
- How to Add AI to MAPICS and Infor XA on IBM i Without Leaving Your NetworkHow to give MAPICS and Infor XA on IBM i a private AI assistant: DB2 for i access, journal-based change capture, local GPU model, authority mapping and rollout.
Guides
- MAPICS to SyteLine Migration Planning GuidePlan your MAPICS XA or MAPICS AS/400 migration to Infor SyteLine or CloudSuite Industrial. Data mapping, timeline, and risk mitigation strategies.
- AI-Powered Legacy ERP ModernizationModernize legacy ERP systems with AI. Gradual transformation from BPCS, MAPICS, BAAN, and other legacy systems to modern Infor cloud ERP.
Integrations
- How to add an AI chatbot to Infor XAHow to add an AI chatbot to Infor XA on IBM i: grounded answers from Db2 for i, internal and customer portals, role-based access, and a fully on-prem option.
- How to add AI agents to Infor XA on IBM iHow to add AI agents to Infor XA on IBM i: a tool layer over Db2 for i and RPG programs, approval gates, on-prem models, and realistic expedite and exception flows.