Dynamics AX 2012 AI Assistant Sizing and Value Calculator
Use this calculator to turn your AX 2012 user count and question volume into a GPU count, token load, index size and a simple payback. Every formula is shown so finance and IT can challenge the assumptions.
Your numbers
Includes retrieved context. Document questions run higher than database lookups.
Aggregate throughput with batching for your model and card. Measure it; do not trust a datasheet.
Your results
Planning estimate. Measure real throughput on your model and hardware, add redundancy for production, and treat time-saved figures as hypotheses until a pilot confirms them.
Monthly net value vs named users
Sweeps Named AX users from 20 to 1000, holding your other inputs fixed.
Get a sizing review for your AX 2012 estate
Optional: share your inputs and we will sanity check GPU count, index design and rollout phases.
Optional. The tool and every export work without this. No spam.
How to use it
Enter named users and the share who actually use the assistant in a day. Estimate questions per user from the pilot or from how often people ask colleagues for data today. Tokens per question include retrieved context, so document-heavy use needs a larger number. Replace the default throughput with a figure measured on your own card.
- Start with 20 to 30% daily active users
- Use a measured tokens-per-second value
- Add redundancy for production
- Run low, expected and high scenarios
The formulas
Questions per day equals named users times active share times questions each. Peak-hour tokens per second equals 20% of daily questions times tokens per question divided by 3600. GPUs equal that peak divided by sustained throughput, rounded up. Index size multiplies pages by two chunks per page by 4096 bytes per vector with 50% overhead. Hours saved use 22 working days.
Reading the result
The GPU count is a floor for capacity, not a recommendation to run a single card in production. The payback figure is only as good as minutes saved per question, which is the weakest input; test it with a pilot group and timed tasks. If net value is negative at realistic inputs, a simpler tool such as reports or Power BI may serve you better.
Frequently Asked Questions
Why 20% of questions in the busiest hour?
It is a conservative planning assumption for office workloads where use clusters in the morning. Replace it with your own peak share if you have usage data.
Does throughput depend on the model?
Strongly. Model size, quantisation, context length and batch size all change tokens per second. Measure on the model you intend to run.
Why is the index so small?
Vectors are compact. Most storage in real deployments is the original documents, not the index, which this tool does not size.
Can I trust the payback number?
Treat it as a hypothesis. Time saved per question is an estimate and adoption varies. Validate with a pilot before committing budget.
If you want these numbers checked against your AX 2012 environment, Netray can run a short sizing review with your IT team.
Related Tools
Dynamics AX 2012 Private AI Layer Blueprint Generator
Fill in your AX 2012 environment and get an architecture plan for a private AI assistant, with components, controls, a 3-phase rollout and open questions for IT.
On-Prem AIGPU Sizing Calculator for LLM Inference
Work out how many GPUs you need to serve a given open-weight model to your user base, based on memory footprint and token throughput.
On-Prem AIOn-Prem LLM Total Cost of Ownership Calculator
Model the full multi-year cost of running LLMs on your own hardware, including GPU capex, power, cooling, support contracts, and operations staffing.
AI Agents & AutomationLLM Token Cost Calculator for ERP Chat
Estimate what an ERP chat assistant costs per month on a pay-per-token API, including retrieved context and output length.
More On-Prem AI tools
See allNew to Microsoft Dynamics AX 2012? Start with the Microsoft Dynamics AX 2012 guide and toolkit.
Keep exploring
Free tools
- Dynamics AX 2012 Private AI Layer Blueprint GeneratorFill in your AX 2012 environment and get an architecture plan for a private AI assistant, with components, controls, a 3-phase rollout and open questions for IT.
- AX 2012 to D365 Data Entity Mapping WorksheetPlan each AX 2012 data object, its D365 data entity, load sequence, record count and owner in one editable migration sheet.
- Dynamics AX Customization Inventory WorksheetEditable inventory of AX customizations with layer, disposition and rework estimate per object, totaled for upgrade planning.
ERP fixes and how-tos
- Adding a Private AI Layer to Dynamics AX 2012 On-PremAdd AI to Dynamics AX 2012 on-prem without moving data: SQL replica, AIF services, retrieval index, local LLM, mirrored AX roles, approved write-back.
- Planning an AX 2012 to Dynamics 365 Finance and Operations upgradeHow an AX 2012 to Dynamics 365 Finance and Operations upgrade actually runs: LCS upgrade project, code upgrade of customizations, and data migration, with the main risks.
- Fixing "The CIL object was not found" in Dynamics AX 2012AX 2012 throws CIL object not found after code changes. What CIL generation actually does, why incremental CIL misses it, and the full rebuild fix.
Integrations
- How to add an AI chatbot to Microsoft Dynamics AX 2012Add an AI chatbot to Dynamics AX 2012 for planners, buyers and customers, grounded in ERP data and able to run fully on-prem with open models.
- How to add AI agents to Microsoft Dynamics AX 2012How to add AI agents to Dynamics AX 2012 using AIF services, SQL read paths and approval gates, without a forced move to Dynamics 365 first.