Compliance & ContractsFree referencePDF, Excel, Word exportAerospace & Defense

ECCN Decoder: Commerce Control List Categories, Groups and Reasons for Control

An ECCN is the Export Control Classification Number that places an item on the Commerce Control List. This decoder explains each part of the number and the reason for control codes you will see on the ECCN entry and the Commerce Country Chart.

Download:
Part of the ECCNCodeMeaningExample or note
Category
0
Nuclear Materials, Facilities and Equipment, and Miscellaneous
0A501 firearms and related items
Category
1
Materials, Chemicals, Microorganisms and Toxins
1C010 fibrous and filamentary materials
Category
2
Materials Processing
2B001 machine tools
Category
3
Electronics
3A001 electronic components
Category
4
Computers
4A003 digital computers
Category
5
Telecommunications (Part 1) and Information Security (Part 2)
5A002 information security items
Category
6
Sensors and Lasers
6A003 cameras
Category
7
Navigation and Avionics
7A003 inertial systems
Category
8
Marine
8A001 submersible vehicles
Category
9
Aerospace and Propulsion
9A610 military aircraft and related items
Product group
A
Systems, equipment and components
Hardware and parts
Product group
B
Test, inspection and production equipment
Machines and tooling used to make items
Product group
C
Materials
Alloys, chemicals, compounds
Product group
D
Software
Software specially designed for controlled items
Product group
E
Technology
Technical data for development, production or use
Reason for control
NS
National Security
Common for Wassenaar related dual-use items
Reason for control
MT
Missile Technology
Missile Technology Control Regime items
Reason for control
NP
Nuclear Nonproliferation
Nuclear Suppliers Group items
Reason for control
CB
Chemical and Biological Weapons
Australia Group items
Reason for control
RS
Regional Stability
Used for many military related and 600 series items
Reason for control
FC
Firearms Convention
Firearms related items
Reason for control
CC
Crime Control
Crime control and detection equipment
Reason for control
AT
Anti-Terrorism
Applies to the broadest set of destinations
Reason for control
EI
Encryption Items
Encryption controls in Category 5 Part 2
Reason for control
SL
Surreptitious Listening
Eavesdropping equipment
Reason for control
UN
United Nations Embargo
Items subject to UN arms embargo restrictions
Reason for control
SS
Short Supply
Items controlled to conserve supply
Classification
EAR99
Subject to the EAR but not listed on the CCL
Most low-tech commercial goods, still needs screening
Classification
600 series
Military items moved from the USML to the CCL
9A610, 3A611, 8A609 and similar
Classification
9x515
Spacecraft and related items moved from the USML
9A515 spacecraft and related equipment
Format
3A001
Category 3, group A, item number 001
Read left to right: category, group, number

The two digits after the group letter indicate the control regime in broad terms: numbers beginning with 0 are generally Wassenaar controlled, 1 for MT, 2 for NP, 3 for CB, 6 for the 600 series munitions and 9 for unilateral controls. Entries differ in detail. The actual license requirement comes from the Commerce Country Chart and the ECCN entry, not from this table.

Add ECCN holds to your ERP

Optional: a short review of how to store ECCN and USML data on items and block shipments to unscreened destinations.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to read an ECCN

Take the example 3A001. The first digit is the CCL category, here Electronics. The letter is the product group, here A for equipment, assemblies and components. The last three digits identify the specific entry. Look up the entry in Supplement No. 1 to Part 774 of the EAR and read the License Requirements section, which lists the reasons for control. Then use the Country Chart in Supplement No. 1 to Part 738 to see whether a license is needed for the destination.

Reasons for control drive the answer

A reason for control such as NS or RS only creates a license requirement for destinations marked on the Country Chart for that reason. AT applies to a small group of destinations. An ECCN with only AT control will often ship without a license to most countries, though sanctions and end-use rules still apply. That is why classification alone is not the license decision. You also need destination, end user and end use.

  • Find the ECCN entry and its reasons for control
  • Check the destination on the Country Chart
  • Screen the party and the end use
  • Look for a license exception only after confirming a license is needed

600 series, 9x515 and EAR99

Export reform moved many military items from the USML to the CCL as 600 series and 9x515 entries. These carry stricter policies than usual dual-use items, including control for most destinations and limits on license exceptions. EAR99 is the catch-all for items subject to the EAR but not listed. It is not a free pass, since embargoes, denied party lists and end-use restrictions apply to EAR99 shipments.

Common mistakes

Teams copy the ECCN from a supplier or datasheet without checking it, use the wrong item such as the machine instead of its software, or classify a finished system by its commercial purpose when a component drives the control. Do not mix up ECCN with the Schedule B or HTS number, which are tariff codes. Keep the classification rationale on file and review it when the product changes.

Frequently Asked Questions

What is the difference between an ECCN and an HTS code?

An ECCN is the export control classification from the Commerce Control List and determines licensing. An HTS or Schedule B number is a tariff code used for customs duties and trade statistics. Both may be needed on an export, but they answer different questions.

What does EAR99 mean?

EAR99 covers items that are subject to the EAR but not specifically listed on the Commerce Control List. They generally do not need a license for most destinations, but embargoed countries, restricted parties and prohibited end uses still require authorization.

What is a 600 series ECCN?

A 600 series ECCN, such as 9A610 or 3A611, covers military items moved from the USML to the CCL during export control reform. They are treated more strictly than ordinary dual-use items and have limited license exception availability.

Can I rely on the manufacturer's ECCN?

It is a useful input, but you are responsible for your own export decisions. A manufacturer ECCN may refer to a different configuration or version. Confirm that it matches your product and keep a copy of the statement with your records.

If your item master lacks ECCN data or you want automatic holds when a controlled item is ordered for a foreign ship-to, we can build that on your own ERP data. The decoder works without it.