Supply Chain & InventoryFree calculatorPDF, Excel, Word exportEpicor EclipseWholesale Distribution

Branch Stockout Cost Calculator for Multi-Branch Distributors

At a single branch, a stockout looks like a missed sale. Across a branch network it also creates transfers, expedites and customer drift. This calculator prices the stockout days for one item at one branch.

Your numbers

units/day
18 days
$
%

Customer buys elsewhere instead of waiting.

%
$

Truck, driver time and handling per unit moved.

Your results

Annual stockout cost for this item and branch
$1,323
Cost of each stockout day
$74
Demand during stockouts
252
Units lost for good
88
Units supplied by transfer
101
Margin lost
$970
Transfer expense
$353

The remainder of demand is assumed to wait and be filled by backorder at no extra cost. Adjust the percentages to your reality.

Free, optional. Reopen it on any device.
Save results:

Annual stockout cost by stockout days

Sweeps Stockout days per year from 0 to 120, holding your other inputs fixed.

Branch availability analysis

Optional: we can show how branch stockout and transfer data could be pulled together from ERP records.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Choose a fast mover that stocks out occasionally. Enter its average daily demand, the number of stockout days you see per year, and the margin per unit. Estimate three behaviors: how much demand is lost for good, how much is rescued by a transfer from another branch, and what a transfer costs per unit. The remainder is treated as waiting at no extra cost.

  • Pull stockout days from daily on-hand snapshots or no-stock lines.
  • Use real transfer cost: trucking, labor and handling.
  • Run the top 20 items by revenue for each branch.

The formula

Demand during stockouts equals daily units times stockout days. Lost margin equals that demand times the lost share times unit margin. Transfer expense equals demand times the transfer share times transfer cost. The sum is the annual cost. For 14 units a day and 18 stockout days, demand during stockouts is 252 units, so a 35 percent loss rate at 11 dollars margin costs about 970 dollars before transfers.

Reading the result

The cost per stockout day tells you how much a day of extra safety stock is worth. If adding a few days of cover costs less than the stockout days it prevents, increase the branch stocking level. If transfers are the main cost, consider stocking the item centrally or at a closer branch.

Common mistakes

Counting all demand as lost overstates the problem because many contractors will wait for a day or two. Another error is leaving out the demand pattern: if a stockout hits on peak days, daily demand understates it. Use demand on the specific days out of stock where you can.

Frequently Asked Questions

How do I count stockout days?

Use a daily on-hand snapshot or movement history and count days with zero available quantity while the item had demand. If you lack snapshots, estimate from no-stock lines on orders.

What lost sales percentage is typical?

It varies widely by product and customer. Commodity items often lose more demand than specialized items. Estimate from sales rep feedback or test with a range, since the chart shows sensitivity.

Does it apply outside Eclipse?

Yes. The model is generic to any branch-based distributor. The Eclipse label reflects the typical multi-branch use case, not a system integration.

What about substitutes?

Treat substitute sales as recovered demand by lowering the lost percentage. The substitute may have a different margin, which you can reflect in the unit margin.

Netray can help identify stockout days and transfer patterns by branch and item from your ERP data, read-only.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Comparisons

Software