EpicorFree calculatorPDF, Excel, Word exportEpicor EclipseWholesale Distribution

Epicor Eclipse AI Assistant Sizing and Value Calculator

This calculator sizes a private AI assistant over Epicor Eclipse extract data. It estimates GPUs for peak load, vector index size, hours saved and payback from assumptions you can edit.

Your numbers

users

Users licensed to use the assistant.

50 %

Share of named users who ask at least one question on a given day.

questions

Pilot logs give the real figure; 5 to 15 is common once habit forms.

tokens

Question, rows from the reporting store and document chunks, plus the answer. Short branch answers keep this near 2,500.

documents

Price lists, product data sheets, contracts and branch procedures.

pages

Average across the document set.

minutes

Branch lookups save a few minutes each; use the time to find stock or history across screens.

per hour

Salary plus benefits and overhead for the people asking.

per GPU per month

Hardware amortised over 36 months plus power, cooling, support and rack space.

tokens/s

Aggregate tokens per second under batching for your model and quantisation. Measure it; this is the most sensitive assumption.

one-time

Integration, document pipeline, security review and pilot.

Your results

GPUs needed (before redundancy)
1
Peak-hour tokens per second divided by throughput per GPU, rounded up. Add a spare GPU if you need failover.
Monthly value
$23,814
Hours saved x loaded hourly cost. Treat as an upper bound until a pilot confirms the time saved.
Questions per day
540
Named users x active share x questions per active user.
Tokens per day
1,620,000
Questions per day x tokens per question.
Peak concurrent requests
1
Assumes 25 percent of daily questions land in the busiest hour and each request holds a slot for about 15 seconds.
Vector index size
3.4406
Gigabytes, assuming 2 chunks per page, 1024-dimension float32 embeddings and 50 percent index overhead. Original files are extra.
Hours saved per month
662 hrs
Questions per day x minutes saved, over 21 working days.
Simple payback
2.4 months
One-time cost divided by monthly value minus GPU cost. Shows 0 when value does not exceed GPU cost.

Planning estimate only. Tokens per second, time saved per question and peak share vary widely; replace the defaults with measurements from your own pilot before committing to hardware.

Free, optional. Reopen it on any device.
Save results:

Monthly value vs daily active share

Sweeps Daily active share from 5 to 100, holding your other inputs fixed.

Epicor Eclipse sizing review

Optional: send your numbers and get an engineer's second opinion on GPU count, index size and the value assumptions.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Enter named users, the daily active share and questions per user. Eclipse sites with many branches often see sharp morning peaks, so use measured busiest-hour counts when you have them. One-time cost should include the extract design and reporting store, which is the bulk of the work on this platform.

  • Include extract and loader build in one-time cost
  • Use realistic branch lookup times
  • Keep tokens per question modest
  • Sweep the active share to see adoption effects

The method

Questions per day come from users, active share and questions per active user. The busiest hour carries 25 percent. GPUs = peak tokens per second / throughput, rounded up. Index = documents x pages x 2 chunks x 1024 x 4 bytes x 1.5 overhead. Hours saved = questions x minutes / 60 x 21; value is hours x hourly cost; payback = one-time cost / (value - GPU cost).

Reading the sweep

The line shows value rising with adoption. The steepest gains come early as more people use the assistant; beyond about two thirds active, value flattens as heavy users dominate. Use the shape to set an adoption target for the pilot rather than assuming every named user will be active.

Common mistakes

Frequent errors are assuming real-time data from an extract, forgetting extract and loader costs, and counting questions that Eclipse already answers in one screen. Be explicit about the as-of time so time saved is not offset by rechecks.

Frequently Asked Questions

Why is one-time cost significant for Eclipse?

Because the data path is extract based. Designing, scheduling and validating extracts and a reporting store takes real effort, and every later answer depends on that foundation, so the cost deserves an honest figure.

How many GPUs does an eight-branch distributor need?

Often one 24 GB GPU for around 90 named users with a 7B to 14B model. A sharp morning peak or long catalogue context may require a second, so measure the busiest hour.

What does the value figure ignore?

It ignores fewer errors, faster customer responses and better buying, which can matter more than time saved. It also ignores the risk of stale data. Treat the figure as one input, not the whole case.

Can I reuse the hardware for other work?

Yes. A GPU server that runs an assistant for Eclipse can also serve other internal tools later. If you plan this, spread GPU cost across uses in the monthly cost input.

If you want the numbers checked against your branch usage and extract options, Netray can help. The calculator needs no contact.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Integrations

Software