On-Prem AIFree checklistPDF, Excel, Word export

Enterprise RAG Security Checklist: Lock Down Your Retrieval Layer

This free enterprise RAG security checklist covers the controls needed to run a retrieval-augmented generation system safely against a real enterprise document corpus, and it is written for security architects, IT directors, and AI platform leads at manufacturers with ITAR, CMMC, or customer flow-down obligations. It spans five domains: corpus access control, data governance, query and prompt security, model and retrieval integrity, and monitoring and audit. RAG introduces a security surface most enterprise security programs have never assessed, because a vector database is effectively a second copy of your document estate operating under a completely different, and often much weaker, permission model.

0%

0 of 27 items complete

6 critical items still open - these are the highest-risk gaps.

Free, optional. Reopen it on any device.
Download checklist:

Corpus access control

Data governance for the corpus

Query and prompt security

Model and retrieval integrity

Monitoring, audit, and incident response

A production-ready enterprise RAG deployment is defensible when at least 90% of all items are complete and every critical item is closed. Any open critical item, especially unfiltered entitlement-aware retrieval, should block a production launch: an assistant that surfaces content a user could not see in the source system is both a security incident and a compliance finding waiting to happen.

Get your full RAG security control matrix

We will email you a personalized breakdown of your open and critical controls mapped to your compliance framework, and a Netray security architect will follow up with a remediation plan.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

Why RAG needs its own security review

A document management system enforces permissions at the file level, and users generally understand and expect that structure. A RAG system flattens that structure into chunks in a vector index and, unless deliberately engineered otherwise, serves the most relevant chunk to whoever asks, regardless of whether they could open the source file. This is not a hypothetical risk; it is the default outcome of indexing a corpus without building entitlement-aware retrieval, and it routinely surfaces restricted content to users who never had access to the original document.

The controls that matter most

Roughly a quarter of the items here are marked critical because they close paths that are difficult or impossible to detect after the fact. Entitlement-aware retrieval failures are silent: nothing crashes, nothing alerts, a user simply receives an answer that should not have been possible. Prompt injection through retrieved documents is similarly quiet, since a malicious instruction embedded in an indexed document can manipulate model behavior without any obvious signature in the user's own query. Close these first.

  • Entitlement-aware retrieval enforced at query time, not just at the document repository.
  • Live or regularly synced permission data so access changes actually propagate to the retrieval layer.
  • Defense against prompt injection embedded in retrieved documents, not just in user-typed input.
  • Complete query logging with retrieved document IDs, so an investigation has evidence to work with.

How to work through the list

Run it as a gated review with named owners per domain: platform engineering for access control and integrity, security for query defenses and monitoring, and a data or compliance function for governance. Score honestly, since a partially implemented entitlement filter is still an open control. Close every critical item before production traffic reaches real users, then work the remainder on a dated plan. Re-run the checklist whenever a new document source is added to the corpus or a new user population is granted access, since either change can silently invalidate a permission-boundary assumption that was valid at initial launch.

How Netray secures RAG deployments for regulated manufacturers

Netray builds retrieval-augmented generation systems for aerospace, defense, and electronics manufacturers where the security posture of the retrieval layer is a project requirement, not an afterthought. We build entitlement-aware retrieval that mirrors your ERP and PLM permission model directly, implement defenses against injection embedded in retrieved content, and produce audit evidence packages your assessors can actually use. Because we also build the SyteLine, LN, M3, and ServiceMax integration layer, entitlements stay consistent between the source system and the AI assistant rather than drifting apart over time.

Frequently Asked Questions

What is entitlement-aware retrieval and why does it matter more than model security?

Entitlement-aware retrieval means the search layer filters candidate documents by the requesting user's actual permissions before anything reaches the model, so the model is never even shown content the user should not see. It matters more than most model-level defenses because it closes the most common and most severe real-world failure: an assistant confidently answering a question using a restricted document, with no indication to the user that anything unusual happened. Without it, every other security control in the pipeline is protecting the wrong layer.

Can prompt injection come from inside my own documents?

Yes, and this is a frequently underestimated risk. A document with an embedded instruction like ignoring prior guidance or revealing system prompts can manipulate the model when it is retrieved and included in context, entirely independent of what the user actually typed. This risk grows with any corpus that includes externally sourced or user-uploaded content. Defenses include clearly delineating retrieved content from system instructions in the prompt structure and treating retrieved text as untrusted data, not as trusted instructions.

How do I test whether entitlement-aware retrieval actually works?

Build a documented test suite with accounts representing different permission levels, then attempt to retrieve restricted content through varied query phrasing designed to route around obvious filters. Test both direct requests and indirect ones, such as asking for a summary of a topic that only appears in a restricted document. Run this suite before launch and after any change to the corpus, the retrieval logic, or the permission sync mechanism, since any of the three can silently break the filtering.

Is corpus poisoning a realistic threat for an internal document set?

It is realistic wherever the ingestion pipeline includes content from sources with weaker write controls than your core document management system: shared drives, wikis, ticketing systems, or any source where a broader population can create or edit content. A deliberately crafted document designed to bias retrieval toward incorrect information, or to embed an injection payload, can enter the corpus through any such source. Restricting ingestion sources and monitoring for anomalous new content are the practical mitigations.

Get a control-by-control review of your RAG deployment with entitlement-aware retrieval verified against your ERP permission model.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Troubleshooting

Comparisons