ERP OperationsFree checklistPDF, Excel, Word export

ERP Database Backup Checklist

Most ERP outages that become disasters are not caused by the failure itself but by a backup that was missing, corrupted, encrypted by malware or never tested. This checklist covers the full chain from scope to restore proof.

0%

0 of 27 items complete

10 critical items still open - these are the highest-risk gaps.

Free, optional. Reopen it on any device.
Download checklist:

Scope and schedule

Storage and protection

Retention and compliance

Restore testing and monitoring

A backup that has never been restored is an assumption, not a backup. Treat every critical item as pass or fail.

Recovery readiness review

Want a second opinion on your ERP backup and recovery design? Optional, no obligation.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the checklist

Walk through each group with the person who owns the backups and the person who would restore them; they are often different people. Tick items you can prove, not items you believe. Export the result to PDF or Excel for your audit file. Anything you cannot tick becomes a dated action with an owner. Repeat after any significant change, and at least twice a year.

RPO, RTO and what they decide

Recovery point objective is how much data you can afford to lose, for example 15 minutes of transactions. It sets how often you take log backups. Recovery time objective is how long the business can be without the ERP, and it sets the restore method and hardware. A plant that ships daily may accept an hour of lost data; one with real time shop floor reporting may not. Write both numbers down and test against them, because backup frequency alone does not guarantee either.

  • RPO drives backup frequency
  • RTO drives restore design and bandwidth
  • Both must be agreed with the business, not set by IT alone

Beyond the database

An ERP is more than its main database. Attachments, custom reports, integration middleware, EDI maps, license files, certificates and configuration all matter during recovery. Cloud and hosted ERPs shift some of this to the vendor, but you still need to know their retention, restore request process and your own exports. Check the contract rather than assuming. For on-premises air-gapped sites, plan for offline media and a documented transport process.

Common mistakes

Keeping backups on the same SAN or hypervisor as production means one failure takes both. Backup jobs that succeed while backing up an empty or wrong database are common after migrations. Encryption keys stored only on the encrypted server make recovery impossible. Using the same admin credentials for backup storage as for production lets ransomware delete backups. Never testing is the most frequent and most costly error.

Frequently Asked Questions

How often should I test an ERP restore?

At least quarterly for the main database, plus after major changes, with a full restore to a separate server and a business check of the data. Annual tests are too rare to catch silent corruption or missing components.

What is the 3-2-1 backup rule?

Keep three copies of your data, on two different types of media, with one copy offsite. Many teams now add an immutable or offline copy to survive ransomware, sometimes called 3-2-1-1.

Do I need log backups for my ERP database?

If the database uses the FULL recovery model and you need point in time recovery, yes. Without log backups the log grows without bound. If you accept restoring to the last full backup, SIMPLE recovery may be fine, but decide deliberately.

Does a cloud ERP still need my own backups?

Check what the vendor covers. Many provide platform recovery but not recovery from your own mistakes such as a bad import. Regular exports of key data and configuration give you an independent copy.

If you want help designing an on-premises recovery plan for ERP and the AI or reporting layers around it, we can work through it with your team.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides