ERP Selection Steering Committee Decision Memo Template

At the end of an ERP selection, the steering committee needs a short document it can decide on. This template structures that memo: the decision requested, the options, the scoring, the cost, the risks and a clear recommendation with conditions. Fill in the fields, and export it to Word or PDF.

Fill in

Live preview
Download:

ERP Selection Steering Committee Decision Memo Template

ERP Selection Decision Memo

Company: Acme Precision Ltd Project: ERP Replacement Program Date: 2026-10-20 Prepared by: ERP Project Lead

Decision requested

Approve selection of Vendor B as the preferred ERP platform and authorize contract negotiation up to the approved budget.

Business problem

The current ERP is out of vendor support in 2028, requires manual workarounds in quoting and inventory, and cannot support planned growth in two additional plants.

Options considered

Vendor A (cloud subscription), Vendor B (cloud subscription with manufacturing add-on), Vendor C (perpetual license, hosted privately). Five vendors were screened and three were scored.

Evaluation and scoring

Weighted scores out of 100: Vendor A 71, Vendor B 82, Vendor C 76. Scoring covered functional fit, integration, vendor viability, implementation approach, and references.

Cost summary

Five year total cost: Vendor A 2.1M, Vendor B 2.3M, Vendor C 2.4M, including internal backfill and a 15 percent contingency.

Risks and mitigations

Data migration quality: early cleansing sprints. Customization creep: fixed scope and change board. Key person dependency: named backups and partner support.

Recommendation

Recommendation: Proceed with conditions

Conditions and next steps: Cap annual price uplift, fix services scope, complete reference calls with two discrete manufacturers, and confirm integration approach for the shop floor system.

Decision record

Committee memberRoleDecisionComments
Executive sponsor
Finance
Operations
IT

Approvals

Executive sponsor / Date
Chief financial officer / Date
Chief information officer / Date

A starting point for internal governance, not legal or procurement advice. Attach the scoring sheet, the normalized price comparison and reference call notes as appendices. Keep it to two pages so the committee reads it.

Selection evidence review

Optional: an expert read of your decision memo and its supporting evidence.

Optional. The tool and every export work without this. No spam.

How to use it

Start with the decision requested in a single sentence, because everything else supports it. Fill the business problem in terms the executives care about: end of support, lost margin, growth limits, compliance gaps. Summarize the scoring and five year cost from your selection scorecard and price comparison. List the top risks with a mitigation each, and finish with the recommendation and the conditions that come with it.

What a good memo contains

A strong memo is short and specific. It names the options, states why the finalists scored the way they did, shows total cost on a like for like basis and does not hide unresolved risks. It also separates the recommendation from the conditions: for example, proceed provided the price uplift is capped and a reference call with a similar manufacturer is positive. Committees can then approve with clear guardrails.

  • One decision, stated first
  • Like for like cost
  • Risks with owners
  • Conditions that can be checked

Using the sample data

The sample content describes a mid sized discrete manufacturer choosing between three finalists. Replace each field with your own facts. If you are recommending a proof of concept or a deferral, say what questions it answers and by when. The decision record table lets each committee member record a position and comments, which helps later when someone asks why a particular platform was chosen.

Common mistakes

Memos often bury the ask on page three, present vendor claims as findings, or show a single price without assumptions. Another frequent problem is skipping dissent: if a department disagrees, record it and the mitigation. Finally, avoid presenting the memo as the end of diligence; contract terms, data migration plans and implementation partner commitments still need to be nailed down.

Frequently Asked Questions

How long should an ERP decision memo be?

Two pages plus appendices is a good target. The committee should be able to read the memo in a few minutes and refer to the scoring, price comparison and reference notes for detail.

Who should sign the memo?

The executive sponsor, finance and IT leadership are typical, along with operations leaders who own the processes the ERP will run. Use the roles that match your governance.

Should the memo name a single vendor?

Usually yes, with conditions. If the evidence is not strong enough, recommend a paid proof of concept or a limited further step with a date, rather than a vague deferral.

What attachments should I include?

The weighted scorecard, a normalized five year price comparison, reference call notes, a risk register and the proposed contract terms that you want to secure before signature.

If you want help preparing the evidence behind your recommendation, or an outside challenge of the assumptions, our team can support that. The template is free and works on its own.