ERP RFP Evaluation Effort Calculator
Inviting more vendors to an RFP feels safe, but every response needs to be read and scored by people who also have a job. This calculator estimates the hours, weeks and cost of evaluation so you can choose a sensible long list size and design a leaner process.
Your numbers
Share of invited vendors that actually submit a full response.
Technical proposals read slowly when you are checking against requirements.
People still have day jobs.
Your results
An effort estimate under stated assumptions. Split evaluators by section and use a two stage process to reduce the load.
Evaluator hours by vendors invited
Sweeps Vendors invited to respond from 2 to 40, holding your other inputs fixed.
RFP process review
Optional: a short review of your RFP scope, long list and scoring approach.
Optional. The tool and every export work without this. No spam.
How to use it
Enter how many vendors you plan to invite, how many typically respond, the response length and the reading speed. Add the scoring time per evaluator and the number of evaluators per response. Then enter the hours each person can actually give per week and a loaded hourly cost. The tool returns total evaluator hours, the elapsed weeks, and the labor cost. The chart shows how total hours rise as the long list grows.
The arithmetic
Responses equal invited vendors times the response rate. Each evaluator spends pages divided by reading speed, plus scoring time, on every response. Total hours multiply that by responses and evaluators. Elapsed weeks assume all evaluators work in parallel and each reads every response, so it equals one person's total hours divided by weekly availability. Cost multiplies total hours by the loaded rate.
Worked example
Twelve invited vendors at a 60 percent response rate gives about seven responses. At 120 pages and 10 pages per hour plus 4 hours of scoring, each evaluator spends 16 hours per response, so 112 hours in total each. With four evaluators that is 448 hours and, at 6 hours a week, nearly 19 weeks. That is far longer than most teams plan for, and it argues for a shorter long list.
Ways to reduce the load
Cut the response length with a structured questionnaire that forces short answers, and pre-qualify vendors with a request for information before the full RFP. Split evaluation by section so that a finance lead reads finance responses and an operations lead reads shop floor responses. Use mandatory requirements as a gate, so non-compliant proposals are screened out in minutes.
- Use a pre-qualification round
- Limit response length per section
- Assign evaluators by topic, not all everything
- Score against a fixed rubric
Frequently Asked Questions
How many vendors should I invite to an ERP RFP?
Many teams shortlist three to five after a lighter screening step. Inviting more increases effort sharply without always improving the outcome. Use the chart here to see the load at different long list sizes.
Does every evaluator need to read everything?
Not necessarily. Splitting by section reduces total hours a lot, but you still want at least one person to read each proposal end to end for consistency and to catch contradictions.
What response rate should I assume?
It depends on how well the RFP is targeted. A broad invitation list may see around half respond, while a short, well matched list may see most respond. Adjust to your own experience.
Can AI help read responses?
It can help summarize and map answers to requirements, but a human should score and check the output. Treat it as a first pass, particularly for confidential documents that should stay on private infrastructure.
If you would like help designing a leaner selection process, our team can share what we have seen work. The calculator needs nothing from us.
Related Tools
ERP Selection Delay Cost Calculator
Put a monthly price on stalling an ERP selection: benefits you do not capture, the legacy system you keep paying for, and price drift on the quote.
ERP Migration & SelectionERP Proposal Price Normalization Worksheet
Line up three ERP proposals on the same cost lines, with one-time and annual amounts, and compare the five year total.
ERP Migration & SelectionERP Selection Steering Committee Decision Memo Template
A structured decision memo that takes your ERP shortlist, scoring, cost and risks to the steering committee for a clear recommendation.
ERP Migration & SelectionERP RFP Completeness Checklist
Verify your ERP request for proposal covers everything vendors need to quote accurately, so responses are comparable and post-award scope disputes are avoided.
ERP Migration & SelectionERP Selection Scorecard for Manufacturers
Score the rigor of your ERP selection process in 10 questions and find the gaps vendors exploit before you sign a contract you cannot easily exit.
More ERP Migration & Selection tools
See all- ERP TCO Comparison Calculator (5-Year)
- ERP Migration Risk Assessment
- Data Migration Effort Calculator
- ERP Go-Live Readiness Checklist
- ERP Change Management Readiness Assessment
- ERP Integration Complexity Calculator
- Cloud vs On-Premise ERP Cost Calculator
- ERP Upgrade vs Replace Assessment
- ERP Implementation Timeline Estimator