ERP Vendor Longlist to Shortlist Tracker Worksheet
Most ERP selections start with a pile of vendor names from analysts, peers and cold calls. This tracker gives that pile a structure so you can cut it to a shortlist for a fair reason, not a gut feeling, and show the steering committee why each vendor stayed or left.
| Vendor / product | Deployment | Industry fit (1-5) | Functional fit (1-5) | Local support (1-5) | Cost fit (1-5) | Vendor viability (1-5) | Screening score (out of 25) | Decision | Reason | |
|---|---|---|---|---|---|---|---|---|---|---|
19 | ||||||||||
21 | ||||||||||
19 | ||||||||||
13 | ||||||||||
15 |
Scores are quick screening judgments from public information, analyst notes and one introductory call. Do the weighted scoring only after the RFP responses arrive. Keep a written reason for every Drop so the decision survives later questions from the steering committee.
Second opinion on your shortlist
Optional: send us your shortlist and we will point out gaps in the screening criteria for a manufacturing ERP.
Optional. The tool and every export work without this. No spam.
How to use the tracker
List every vendor you hear about, even ones you suspect are wrong. For each, rate five screening criteria from 1 to 5 using public material: product pages, industry references, partner directories, pricing indications and annual reports. The sheet adds the five scores into a total out of 25. Use the Decision column to mark who is invited to the RFP, who is on hold and who is dropped, with a one line reason. Export to Excel and share it with the steering committee before the RFP goes out.
- Screen from public information, do not burn vendor time yet
- Rate the same five criteria for every vendor
- Write a reason for every Drop and Hold
- Aim for three to four vendors in the full RFP
Why screen before the RFP
A full RFP costs both sides real effort. Vendors invest days in a response and your team spends weeks reading it. Sending it to twelve vendors produces twelve answers you cannot evaluate properly. A light screen on industry fit, functional fit, local support, cost and vendor viability removes obvious mismatches, such as a product with no manufacturing depth or a partner network that does not cover your region, before anyone writes a long document.
Choosing the five criteria
The defaults reflect what usually eliminates vendors for manufacturers. Industry fit asks whether similar plants run the product in production. Functional fit asks about the few processes that define your business, for example engineering change control, lot traceability or project costing. Local support covers implementation partners, language and statutory localisation. Cost fit compares rough total cost against budget. Viability looks at ownership, product investment and the release roadmap. Change the labels if your project has different gates, but keep the number at five or fewer.
Common mistakes
The biggest error is shortlisting on brand recognition alone. The second is letting one executive favourite stay on the list without a score. A third is mixing screening with detailed scoring, which turns a one day exercise into a month. Keep screening light and consistent, then do the heavy weighted evaluation on the shortlist only, using your requirements and demo scripts.
Frequently Asked Questions
How many ERP vendors should be on the shortlist?
Three to four is the usual range. Fewer than three weakens your negotiating position and gives you little comparison. More than four makes demos and reference calls too heavy for the team, and detailed scoring quality drops.
Should price be a screening criterion?
Use it as a rough fit check against budget, not a precise number. Real pricing depends on users, modules and implementation scope, which you only know after the RFP. Drop vendors early only when they are clearly outside your range.
Can I add or remove columns?
You can add and delete rows in the tool and edit every score. For different criteria, export to Excel and adjust the headers there. Keep the same criteria for all vendors, otherwise the totals are not comparable.
Where do vendor names come from?
Peer companies in your industry, analyst shortlists, partner directories, your current ERP vendor, and implementation consultants. Record where each name came from so you can spot bias, for example a list built only from one consultant's network.
If your shortlist includes Infor SyteLine, M3, LN or NetSuite and you want an independent view of how AI and reporting would work on top of each, Netray can review it with you.
Related Tools
ERP Vendor RFI Letter Template
Generate a request for information letter to send to ERP vendors before the full RFP, with scope, questions, timeline and response rules.
ERP Migration & SelectionERP Selection Scorecard for Manufacturers
Score the rigor of your ERP selection process in 10 questions and find the gaps vendors exploit before you sign a contract you cannot easily exit.
ERP Migration & SelectionERP Implementation Partner Evaluation Worksheet
Score system integrators and ERP partners on experience, team, method, references and commercial terms, with a weighted total for each criterion.
ERP Migration & SelectionERP Selection Decision Memo Template
Write the executive memo that recommends an ERP vendor: context, options, scoring, cost, risks, conditions and approval lines.
More ERP Migration & Selection tools
See all- ERP TCO Comparison Calculator (5-Year)
- ERP Migration Risk Assessment
- Data Migration Effort Calculator
- ERP Go-Live Readiness Checklist
- ERP Change Management Readiness Assessment
- ERP Integration Complexity Calculator
- Cloud vs On-Premise ERP Cost Calculator
- ERP Upgrade vs Replace Assessment
- ERP Implementation Timeline Estimator
Keep exploring
Free tools
- Job Shop ERP Vendor Landscape ReferenceA searchable list of ERP systems small machine shops commonly shortlist, with vendor, category and what to verify in each demo.
- Job Shop ERP Vendor Demo Script TemplateA scripted demo brief you send to ERP vendors so each shows the same real scenarios from quote to invoice, scored by your team.
- Job Shop ERP Vendor Demo Questions ChecklistQuestions to put to any job shop ERP vendor so the demo covers your real jobs, data and costs.
ERP fixes and how-tos
- How to Score ERP AI Vendors in an RFPBuild a defensible scoring model for ERP and AI bids: pass/fail gates, weighted criteria, scoring scales, evidence rules, and how to avoid demo bias and ties.
- Questions to Ask AI Vendors in an ERP RFPThe questions that separate real ERP AI from demo-ware: data access, role security, model hosting, accuracy testing, write-back controls, pricing and exit rights.
- ERP Selection in 2026: Where AI Actually MattersA CIO checklist for weighing AI capability in an ERP selection: what to actually test in a demo, which vendor AI claims are real, and where AI should not decide the vendor.
Guides
- How to Evaluate AI Vendors at Manufacturing Trade Shows Without Getting BurnedHow to evaluate AI vendors at manufacturing trade shows: demo scripts, red flags, security questions, and a scorecard you can use on the show floor.
- How to Configure Vendor Qualification in SyteLineLearn how to set up vendor qualification and approved supplier management in Infor SyteLine. Configure vendor assessments, quality scorecards, approval workflows, and ongoing performance monitoring.
- SyteLine Vendor Management Setup and Configuration GuideConfigure SyteLine vendor management for procurement efficiency. Set up vendor records, approval workflows, and performance scoring in CloudSuite Industrial.