ERP WAN Bandwidth Sizing Calculator for Plants and Remote Sites
Plants ask carriers for bandwidth by gut feel and then blame the ERP when screens lag. Most slow sessions are latency or packet loss, but undersized circuits do cause real queueing. This calculator builds the number from users, reports, voice and replication.
Your numbers
Peak concurrent sessions, not total accounts.
Thin client or web ERP is often 50 to 200 kbps. Measure your own.
Your results
Planning estimate. Measure real flows with NetFlow or your firewall reports before ordering a circuit, and add latency requirements separately.
Recommended circuit (Mbps) vs concurrent users
Sweeps Concurrent ERP users at site from 5 to 400, holding your other inputs fixed.
Optional network readiness check
Tell us your sites and ERP and we will flag the links most likely to hurt user experience. No obligation.
Optional. The tool and every export work without this. No spam.
How to use it
Enter the peak number of concurrent users at the site. For interactive traffic per user, start with 100 to 200 kbps for RDP or web ERP, then replace it with a measured figure from your firewall or NetFlow. Add the average data users pull each hour such as reports, attachments and drawings. Include concurrent calls and any backup replication that runs in the working day, then set overhead and a target peak utilization.
- Use the busiest 15 minutes, not the daily average
- Count both directions and size for the busier one
- Keep drawings, CAD and software updates out of the average
The method
Interactive demand is users times kbps. Report demand converts MB per hour into Mbps using 8 bits per byte over 3,600 seconds. Their sum is multiplied by a burst factor, since people click at the same moment after a shift change. Voice and replication are added, then protocol and VPN overhead. Dividing by the utilization target leaves headroom, because queueing delay rises quickly beyond about 70 percent load.
Worked example
Sixty users at 150 kbps is 9 Mbps. Reports at 40 MB per hour per user add about 5.3 Mbps. With a 2x burst the interactive peak is 28.7 Mbps. Eight calls add 0.7 Mbps and replication 5 Mbps. With 20 percent overhead the total is about 41 Mbps, and at 70 percent utilization the recommended circuit is around 59 Mbps, so a 100 Mbps tier is the sensible purchase.
Common mistakes
Sizing from total employee count, forgetting that shop floor terminals and Wi-Fi scanners also generate traffic, and running full backups across the same circuit as production. Also check latency: a clean 20 ms path to a cloud ERP matters more than raw megabits. Use QoS to protect voice and ERP traffic, and schedule large transfers outside shift hours.
Frequently Asked Questions
How much bandwidth does one ERP user need?
Typically 50 to 200 kbps for interactive sessions over RDP or a web client, plus bursts for reports and attachments. Heavy use of drawings or BI dashboards can add several megabits per user, so measure your own traffic.
Is latency or bandwidth more important for ERP?
For chatty client-server ERP and RDP, latency and packet loss usually matter more than raw bandwidth. Aim for low and stable round trip time. Extra bandwidth does not fix a poor path.
Why use a 70 percent utilization target?
Queueing delay and packet drops rise sharply as a link approaches saturation, and bursts will exceed the average. Designing for a peak of about 70 percent leaves room for bursts and growth.
Should I include backup traffic?
Include anything that runs during working hours. If backups or replication run overnight on a schedule, exclude them from the daytime number but check they finish inside the window.
If you are weighing a cloud move or an on-prem private AI layer for the ERP, Netray can help you map which traffic must leave the plant and which can stay local.
Related Tools
Backup Window and Throughput Calculator
Calculate full and incremental backup duration from data size, link speed, efficiency and dedupe, and the throughput needed to hit your window.
Industry TemplatesPlant Switch Port Budget Worksheet
List devices by plant area, add growth, and get the ports required, switches needed and spare ports for each closet or cell.
ERP Migration & SelectionOn-Prem Server Refresh vs Cloud TCO Calculator
Put hardware, support, space, admin time and hosting fees on one page to compare a server refresh with a cloud hosting move over your planning horizon.
ERP OperationsPlant IT Change Request (CAB) Form Template
A change request form that covers scope, risk, rollback, production impact and approvals for IT changes that touch ERP, MES or shop floor systems.
More ERP Operations tools
See allKeep exploring
Free tools
- ERP Server Sizing CalculatorRough-size application and database servers for an ERP from named users, concurrency, database size and growth, with headroom.
- SyteLine AI Assistant Sizing and Value CalculatorSize the GPUs and estimate the monthly value and payback of a private, on-prem AI assistant for SyteLine.
- Data Lakehouse Sizing CalculatorEstimate storage footprint, compute hours, and monthly spend for a lakehouse platform from raw data volume, annual growth rate, and retention policy.
ERP fixes and how-tos
- Resolving SyteLine multi-site replication conflict errorsSyteLine multi-site replication conflicts happen when the same record is changed at two sites before the sync runs. Here is how the conflict log works and how to clear a stuck replication queue.
- Baan Open Order Report: Sales and Purchase Sessions, Filters and TablesHow to get a Baan open order report for sales and purchase orders: which sessions to use, how to filter open lines, and which tables to query or export.
Guides
- Network Optimization for ERP System PerformanceOptimize network performance for ERP systems. Covers WAN optimization, latency measurement, protocol tuning, QoS configuration, and multi-site ERP networking.
- How to Configure SyteLine SQL ReplicationGuide to configuring SQL Server replication for SyteLine databases. Learn transactional replication, snapshot setup, subscriber management, and monitoring for reporting databases.
- AMD MI300X for Enterprise LLM Deployment: A Practical Alternative to NVIDIAAMD MI300X vs NVIDIA Blackwell B200 specs: memory, bandwidth, compute units vs CUDA cores, ROCm and vLLM support, and when MI300X fits enterprise LLMs.
Troubleshooting
- Why CPU offloading makes LLM inference so slow, and when it is still worth itCPU offload fixes out-of-memory errors but tanks throughput because every offloaded layer crosses slow PCIe bandwidth on each single forward pass.
- Why HuggingFace model downloads are slow or stall partway through, and how to fix itSlow or stalled HuggingFace downloads are usually fixed with hf_transfer, resumable downloads, or an internal mirror. Here is how to diagnose and fix each cause.