CWDM and DWDM Wavelength and Frequency Grid Reference
Wavelength division multiplexing places many signals on one fiber, each at its own carrier on an ITU-defined grid. This reference lists the 18 CWDM wavelengths and 21 DWDM 100 GHz channels around the 193.1 THz anchor with their frequency and wavelength.
| Grid | Channel | Frequency (THz) | Wavelength in vacuum (nm) |
|---|---|---|---|
CWDM | 1271 nm | 235.87 | 1271.00 |
CWDM | 1291 nm | 232.22 | 1291.00 |
CWDM | 1311 nm | 228.67 | 1311.00 |
CWDM | 1331 nm | 225.24 | 1331.00 |
CWDM | 1351 nm | 221.90 | 1351.00 |
CWDM | 1371 nm | 218.67 | 1371.00 |
CWDM | 1391 nm | 215.52 | 1391.00 |
CWDM | 1411 nm | 212.47 | 1411.00 |
CWDM | 1431 nm | 209.50 | 1431.00 |
CWDM | 1451 nm | 206.61 | 1451.00 |
CWDM | 1471 nm | 203.80 | 1471.00 |
CWDM | 1491 nm | 201.07 | 1491.00 |
CWDM | 1511 nm | 198.41 | 1511.00 |
CWDM | 1531 nm | 195.81 | 1531.00 |
CWDM | 1551 nm | 193.29 | 1551.00 |
CWDM | 1571 nm | 190.83 | 1571.00 |
CWDM | 1591 nm | 188.43 | 1591.00 |
CWDM | 1611 nm | 186.09 | 1611.00 |
DWDM 100 GHz | 193.1 THz + 10 x 100 GHz | 194.1 | 1544.53 |
DWDM 100 GHz | 193.1 THz + 9 x 100 GHz | 194.0 | 1545.32 |
DWDM 100 GHz | 193.1 THz + 8 x 100 GHz | 193.9 | 1546.12 |
DWDM 100 GHz | 193.1 THz + 7 x 100 GHz | 193.8 | 1546.92 |
DWDM 100 GHz | 193.1 THz + 6 x 100 GHz | 193.7 | 1547.72 |
DWDM 100 GHz | 193.1 THz + 5 x 100 GHz | 193.6 | 1548.51 |
DWDM 100 GHz | 193.1 THz + 4 x 100 GHz | 193.5 | 1549.32 |
DWDM 100 GHz | 193.1 THz + 3 x 100 GHz | 193.4 | 1550.12 |
DWDM 100 GHz | 193.1 THz + 2 x 100 GHz | 193.3 | 1550.92 |
DWDM 100 GHz | 193.1 THz + 1 x 100 GHz | 193.2 | 1551.72 |
DWDM 100 GHz | 193.1 THz (anchor) | 193.1 | 1552.52 |
DWDM 100 GHz | 193.1 THz - 1 x 100 GHz | 193.0 | 1553.33 |
DWDM 100 GHz | 193.1 THz - 2 x 100 GHz | 192.9 | 1554.13 |
DWDM 100 GHz | 193.1 THz - 3 x 100 GHz | 192.8 | 1554.94 |
DWDM 100 GHz | 193.1 THz - 4 x 100 GHz | 192.7 | 1555.75 |
DWDM 100 GHz | 193.1 THz - 5 x 100 GHz | 192.6 | 1556.55 |
DWDM 100 GHz | 193.1 THz - 6 x 100 GHz | 192.5 | 1557.36 |
DWDM 100 GHz | 193.1 THz - 7 x 100 GHz | 192.4 | 1558.17 |
DWDM 100 GHz | 193.1 THz - 8 x 100 GHz | 192.3 | 1558.98 |
DWDM 100 GHz | 193.1 THz - 9 x 100 GHz | 192.2 | 1559.79 |
DWDM 100 GHz | 193.1 THz - 10 x 100 GHz | 192.1 | 1560.61 |
CWDM wavelengths follow the 20 nm grid of ITU-T G.694.2 and DWDM channels the frequency grid of ITU-T G.694.1 anchored at 193.1 THz. Wavelengths are calculated as 299,792.458 divided by the frequency in THz, in vacuum. Vendors often print rounded values and their own channel numbers, so confirm against the optic label.
Keep channel plans consistent
Optional: we can talk through how a channel plan and circuit inventory might be linked to your business data.
Optional. The tool and every export work without this. No spam.
How to use the table
Search by wavelength, frequency or channel to find the matching entry, then export the table to Excel or PDF for your channel plan. CWDM channels are spaced 20 nm apart from 1271 to 1611 nm, which lets uncooled lasers and wide filters be used. DWDM channels are on a frequency grid anchored at 193.1 THz, here at 100 GHz spacing, which is about 0.8 nm in the C-band.
- Use frequency, not wavelength, when you plan DWDM channels
- Check that the mux, ROADM and transceiver all use the same grid
- Reserve the OSC wavelength if your system needs an optical supervisory channel
Where the numbers come from
The DWDM grid defined in ITU-T G.694.1 uses frequencies of 193.1 THz plus or minus multiples of the spacing. Wavelength follows from lambda = c / f, with c equal to 299,792.458 km/s, so 193.1 THz is 1552.52 nm. The CWDM grid in ITU-T G.694.2 runs from 1271 nm to 1611 nm in 20 nm steps; the frequency column here is derived from those wavelengths for comparison and is not itself a grid definition.
Practical notes
Most DWDM equipment is sold on a 50 GHz or 100 GHz grid in the C-band, which spans roughly 1530 to 1565 nm, with extended L-band systems around 1565 to 1625 nm. Flex-grid systems from G.694.1 allocate slices in 12.5 GHz units, so a coherent 400G carrier may occupy 75 GHz or more. When a transceiver label shows a wavelength and your plan shows a frequency, convert with the formula and allow for the rounding in the labels.
Common mistakes
Mixing CWDM and DWDM transceivers on the same mux is a frequent cause of dark ports. Others confuse wavelength in vacuum with wavelength in glass, which is shorter by the refractive index, or read channel numbers from different vendors as though they were standard. A single misprinted channel number can place a carrier on a neighbor's wavelength, so always cross-check the frequency.
Frequently Asked Questions
What is the DWDM anchor frequency?
ITU-T G.694.1 uses 193.1 THz as the reference for the frequency grid, which corresponds to about 1552.52 nm in vacuum. Channels are placed at multiples of the spacing from it.
How far apart are CWDM channels?
20 nm, from 1271 nm to 1611 nm for the 18 channels in G.694.2. The wide spacing allows uncooled lasers and low-cost filters but gives fewer channels than DWDM.
Is wavelength in vacuum different from in fiber?
Yes. In glass the wavelength is shorter by the index, about 1.468, but the nominal wavelength used in grids and on labels is the vacuum value.
Why is 100 GHz about 0.8 nm?
Because delta lambda = lambda squared x delta f / c. At 1550 nm and 100 GHz this is about 0.8 nm, and 50 GHz is about 0.4 nm.
Netray can help you keep channel plans and circuit inventory consistent with the equipment and spare records in your ERP.
Related Tools
Fiber Optic OSNR and EDFA Span Calculator
Estimate optical signal-to-noise ratio for a chain of identical EDFA spans and find how many spans the link supports.
Industry TemplatesFiber Optic Chromatic Dispersion Penalty Calculator
Estimate pulse broadening from chromatic dispersion for a given fiber length, source linewidth and bit rate, and see the dispersion-limited reach.
Engineering & PLMFiber Optic Numerical Aperture and V-Number Calculator
Compute NA, acceptance angle, relative index difference, V-number, cutoff wavelength and mode count for a step-index fiber.
Industry TemplatesFiber Optic Latency and Propagation Delay Calculator
Calculate one-way and round-trip delay over a fiber route, and find the longest route that meets a round-trip latency budget.
More Industry Templates tools
See all- Fiber Optic Link Loss Budget Calculator
- Fiber Type Reference: OS2, OM3, OM4, OM5
- Fiber Splice Loss Worksheet
- OTDR Test Report Template
- Fiber Connector Insertion Loss and Return Loss Reference
- dBm to mW Optical Power Converter
- Fiber Optic Bend Radius Reference
- Fiber Optic Test Log Worksheet
- Fiber Optic Splice Closure Record Template
Keep exploring
Free tools
- CWDM and DWDM Channel Wavelength ReferenceLook up CWDM wavelengths and DWDM 100 GHz channel numbers, frequencies in THz and wavelengths in nm.
- Fiber Optic Wavelength Bands and Windows ReferenceSearchable table of the ITU optical bands and the wavelengths used by multimode, singlemode, PON and test equipment.
- Laser Types, Wavelength and Application ReferenceFind the output wavelength, spectral region and typical industrial use for common gas, solid-state, fiber, diode and excimer lasers.