Supply Chain & InventoryFree templatePDF, Excel, Word export

Freight Damage Claim Letter Template

When a pallet arrives crushed or a shipment comes up short, the claim you send in the next days decides whether you recover the cost. This template builds a clear claim letter with the shipment details, the loss and the documents the carrier will expect.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

Freight Damage Claim Letter Template

Freight Claim Letter

To: Claims Department, Northline Freight From: Acme Distribution Ltd Contact: Jordan Lee, Receiving Manager

Re: Claim for Damage PRO number: PRO-448201 Bill of lading: BOL-77310

Shipment details

ItemDetail
OriginHouston, TX
DestinationDallas, TX
Ship date2026-10-05
Delivery date2026-10-09
Exception noted on delivery receiptYes

Description of the loss

Two of six pallets arrived with crushed cartons and a forklift puncture on one pallet. Damage was photographed at the dock before unloading was finished.

We request that Northline Freight acknowledge this claim in writing and investigate it. The claimed amount is USD 4,860.00, calculated from the supporting invoice and the cost of damaged or missing goods.

Supporting documents enclosed

DocumentEnclosed
Original bill of lading (signed)
Delivery receipt showing exceptions
Commercial invoice or proof of value
Photographs of damage and packaging
Inspection report or damage assessment
Repair or replacement estimate

Authorization

Claimant representative / Date
Date / Date

This is a starting point, not legal advice. For US interstate trucking, claims generally must be filed in writing within nine months of delivery under 49 CFR Part 370, and the carrier has 30 days to acknowledge and 120 days to pay, decline or make an offer. Time limits and liability rules differ by mode and country, and the bill of lading terms may apply, so check your contract and local law.

Receiving exceptions to claims

Want receiving exceptions in your ERP to feed a claim package automatically? We can discuss what is practical.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the template

Fill in the carrier, PRO and bill of lading numbers, dates and a factual description of the loss. State the claim amount and attach the documents listed in the table. Export to PDF or Word and send it to the carrier claims department by the method named in the bill of lading, keeping proof of the date you sent it.

  • Describe what you saw, not who is to blame
  • Calculate the amount from the invoice, not an estimate
  • Keep copies of everything you send

What carriers look for

A carrier will check for a signed delivery receipt with exceptions noted, photographs, proof of value, and that the claim was filed within the time limit. Noting damage on the delivery receipt at the time of delivery is the strongest evidence. Concealed damage, found after the driver has left, is harder to prove, so report it quickly and keep the packaging.

At the dock: protect the claim

Before the driver leaves, inspect the freight, count pieces, and write any damage or shortage on the delivery receipt. Take photographs with the pallet label and the carrier trailer number in view. Keep the damaged goods and packaging until the carrier inspects them or releases them in writing, and do not scrap or ship them back without approval.

Common mistakes

Frequent causes of denied claims are signing clean for a visibly damaged shipment, filing late, missing proof of value, and claiming selling price when the carrier liability is limited by the bill of lading. Check whether you declared a value and bought cargo insurance, which can change the amount recoverable.

Frequently Asked Questions

How long do I have to file a freight claim?

For US interstate trucking the claim generally must be filed within nine months of delivery. Other modes and countries differ, and contracts may set other limits. File as early as you can and confirm the rule in your bill of lading.

What if I find damage after the driver leaves?

That is concealed damage. Notify the carrier in writing as soon as possible, photograph the goods and packaging, and keep everything for inspection. These claims are harder to win, so speed and documentation matter.

Do I need to sign the delivery receipt if there is damage?

You may sign, but write the exceptions on it first, such as damaged cartons or missing pieces. A clean signature suggests the freight arrived in good condition and weakens the claim.

What documents does a carrier require?

Commonly the bill of lading, delivery receipt, invoice or proof of value, photographs and a statement of the claim amount. Some carriers also ask for a repair estimate or inspection report.

If receiving exceptions are logged in your ERP or WMS, we can help turn them into a ready-to-send claim package automatically.