Shipping Container Specifications and Capacity Reference
Before a container load is planned, someone has to answer how much fits in the box and how much it may weigh. This reference puts the typical internal dimensions, door openings, volume and payload of the common ISO containers in one table you can search and export.
| Container type | Internal length (m) | Internal width (m) | Internal height (m) | Door opening W x H (m) | Capacity (cbm) | Tare (kg) | Typical payload (kg) | Floor pallets (single layer) |
|---|---|---|---|---|---|---|---|---|
20 ft general purpose | 5.90 | 2.35 | 2.39 | 2.34 x 2.28 | 33 | 2,200 | approx 28,000 | 10 GMA, 11 EUR |
40 ft general purpose | 12.03 | 2.35 | 2.39 | 2.34 x 2.28 | 67 | 3,700 | approx 26,500 to 28,700 | 20 GMA, 23 EUR |
40 ft high cube | 12.03 | 2.35 | 2.69 | 2.34 x 2.58 | 76 | 3,900 | approx 26,500 to 28,600 | 20 GMA, 23 EUR |
45 ft high cube | 13.56 | 2.35 | 2.69 | 2.34 x 2.58 | 86 | 4,800 | approx 27,000 | 23 GMA, 26 EUR |
20 ft reefer | 5.44 | 2.29 | 2.27 | 2.29 x 2.26 | 28 | 3,000 | approx 27,000 | 9 GMA, 10 EUR |
40 ft high cube reefer | 11.58 | 2.29 | 2.55 | 2.29 x 2.56 | 67 | 4,800 | approx 29,000 | 19 GMA, 23 EUR |
20 ft open top | 5.90 | 2.35 | 2.35 | 2.34 x 2.28 | 32 | 2,300 | approx 28,000 | 10 GMA, 11 EUR |
40 ft open top | 12.03 | 2.35 | 2.35 | 2.34 x 2.28 | 65 | 4,000 | approx 26,000 | 20 GMA, 23 EUR |
Figures are typical and vary by manufacturer, age and shipping line. Use the carrier equipment guide for the actual box you are booked on. Pallet counts assume single-layer floor loading with typical stowage and no dunnage; mixed footprints or tall loads change the result.
Item dimension and weight cleanup
Load planning is only as good as your item dimensions and weights. We can review your item master data for logistics use.
Optional. The tool and every export work without this. No spam.
How to use the table
Find the container you are quoted and read the internal length, width and height for cube planning and the door opening for the tallest and widest cartons. Compare the cubic capacity with your cargo volume, then compare the payload with your cargo weight. Whichever limit hits first sets the container count. Export to Excel to paste the rows into a booking sheet.
Weight versus volume
Dense cargo such as metal parts, tile or machinery reaches the payload limit long before the cube is full, while light cargo such as furniture or packaging cube-outs first. Plan to the lower of the two, and remember that road weight limits in the origin and destination country can cap the legal payload below what the container can carry.
- Cube-out: volume is full, weight is not
- Weight-out: payload is reached, space remains
- Road limits can be lower than container limits
High cube, reefer and open top
High cube containers add about 30 centimetres of height, valuable for light cargo but not for heavy loads. Reefers lose internal space to insulation and the cooling unit, so their internal dimensions and cube are smaller than a dry box. Open top boxes suit tall or crane-loaded cargo, and the load still must be secured and covered. Always confirm availability and surcharges with the carrier.
Common mistakes
People often use external dimensions for a load plan, forget the door opening is smaller than the interior, or plan a full cube without dunnage space. Another common error is using nominal volume as usable volume; stowage factor and loading method typically lose a meaningful share of the cube. Add a margin and verify with a load plan for expensive cargo.
Frequently Asked Questions
How many pallets fit in a 40 ft container?
Typically about 20 GMA pallets (48 by 40 inches) or 23 to 24 EUR pallets (1200 by 800 millimetres) in a single layer. Turning pallets sideways or stacking can change the count, depending on height and weight.
What is the difference between a 40 ft and a 40 ft high cube?
Both are 40 feet long and about 2.35 metres wide inside. The high cube is about 30 centimetres taller, roughly 2.69 metres inside versus 2.39, which gives around 76 cubic metres instead of 67.
Why are reefer containers smaller inside?
Insulated walls, floor and the refrigeration unit at the front take space, so internal length, width and height are smaller than a dry container of the same external size.
Where do I get exact container specs?
The shipping line or lessor publishes an equipment guide with exact internal dimensions, tare weight and maximum payload for each box type. Treat any general table, including this one, as a planning estimate.
If container planning still lives in spreadsheets outside your ERP, we can help connect item dimensions and weights to load planning inside your existing system.
Related Tools
Pallet Sizes and Dimensions Reference by Region
Look up standard pallet footprints in inches and millimetres for North America, Europe, Asia and Australia, with typical uses.
Supply Chain & InventoryFreight Damage Claim Letter Template
Generate a written freight damage or loss claim to a carrier, with a documents list and the points a carrier will look for.
Supply Chain & InventoryWarehouse KPI Formulas and Definitions Reference
A lookup of the common warehouse and distribution KPIs with how each is calculated, what it tells you and where it misleads.
Costing & FinanceWarehouse Cost per Pallet Position Calculator
Turn monthly facility, labor, utilities and equipment cost into a cost per pallet position and per occupied pallet, and see how utilization moves it.
More Supply Chain & Inventory tools
See all- Oracle Fusion Inventory Turns and Carrying Cost Calculator
- Distribution ERP Fill Rate Calculator
- Distributor Rebate Tracking Worksheet
- Branch Transfer Planning Worksheet
- Distributor Slow-Moving Inventory Review Worksheet
- Distributor Vendor Performance Scorecard Worksheet
- Distributor GMROI Calculator
- Distributor Backorder Cost and Fill Rate Calculator
- EOQ with Vendor Minimum Order Calculator
Keep exploring
Free tools
- Shipping Container Specifications ReferenceLook up typical internal dimensions, cubic capacity, tare and payload for common ISO container types before you book space.
- Container Loading Capacity CalculatorEstimate cartons per container by volume and by weight, see which limit binds and how full the container is.
- Shipping Container Load Calculator (20ft, 40ft)Estimate how many cartons fit in a 20ft, 40ft or 40ft high cube container based on carton size, weight and container payload.