Other ERPsFree templatePDF, Excel, Word exportInfor LX / BPCSManufacturingAll Infor LX and BPCS tools

Infor LX / BPCS private AI layer blueprint generator

This generator turns a few facts about your Infor LX / BPCS installation into a structured architecture plan for a private AI layer. It is meant to give IT, the ERP owner and security a shared document to react to, not to replace design work.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

Infor LX / BPCS Private AI Layer Blueprint Generator

Private AI layer architecture plan: Infor LX / BPCS

Company: Acme Precision Ltd System: Infor LX / BPCS BPCS 6.0.x Database: Db2 for i (IBM i 7.3) Hosting: On-prem server Named users: 120 across 2 site(s) Target go-live: 2027-03-31

1. Context and goals

Acme Precision Ltd runs Infor LX / BPCS (BPCS 6.0.x) on Db2 for i (IBM i 7.3) and wants AI-assisted answers without moving data off its own infrastructure.

Primary use cases: Open order and backorder questions, item availability by warehouse, shop order status, vendor delivery history, and explanations of MRP action messages for planners.

The assistant is read-only in phase 1. Any write-back is prepared as a draft and posted only through Infor LX / BPCS's supported interfaces after a named user approves it.

2. Components

ComponentDesignNotes
Data access pathRead-only business-named SQL views over BPCS files on a replicaFile and field dictionary
Change captureJournal receivers or hourly extractJournaling status
Retrieval indexVector index over documents and attachments with access-control metadata, on local storageChunking and refresh schedule to agree
Tool serverMCP or REST tool server exposing approved, parameterised read actionsAction list agreed with business owners
Model servingOpen-weight model on vLLM or Ollama; GPU: None yetModel choice validated on Acme Precision Ltd questions
Identity and permissionsRead-only profile plus facility and warehouse filterProfile mapping
AuditLog of user, question, query or action, documents retrieved and answerRetention set with compliance

3. Security controls mapped to your inputs

Hosting model: On-prem server. If air-gapped, no outbound route exists for the model, index or tool server, and updates arrive on approved media after scanning.

Data that must never leave the site: Customer lists with pricing, engineering BOMs for controlled products, and supplier cost data.

Controls: read-only service account limited to named views, per-user visibility filters in the tool server, encryption at rest on the replica and index, network segmentation between the assistant and production, and an audit trail reviewed on a set schedule.

4. Rollout

PhaseScopeExit criteria
1. Read-only questionsNamed views and a small document set for a pilot group; every answer shows its query or sourcesPilot users rate answers acceptable on agreed test questions
2. DraftsAssistant prepares summaries, messages or transaction drafts that are reviewed but not postedDrafts accepted with few edits; no data exposure findings
3. Approved actionsPosting through supported interfaces under the approving user's identityAudit record complete; business owner sign-off

5. Open questions for IT

1. Which libraries, schemas or organisations are in scope for 120 users at 2 site(s)? 2. Can a replica or reporting copy be provided, and with what refresh lag? 3. Which document stores need indexing, and what access rules apply to them? 4. Who owns the data dictionary and approves the action list? 5. What are the power, rack and cooling constraints for GPUs (None yet)? 6. How will model updates be brought in and approved?

Approvals

IT lead / Date
ERP owner / Date
Information security / Date

A planning aid, not a design guarantee. Verify table names, interfaces and supported versions against your Infor LX / BPCS documentation and with your vendor or implementation partner before building.

Review of your Infor LX / BPCS AI architecture

Optionally send your exported plan for a short expert review of the data path, permissions and sizing.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the generator

Fill in the company, version, database, hosting model, user count and sites. Write the use cases in plain language, for example the five questions users ask most often. List the data that must stay on site, such as pricing, controlled drawings or personal data. Then export the result to PDF or Word and circulate it. The open questions section is designed to start the right conversation with infrastructure and security teams.

  • Be specific about use cases; vague goals produce vague scope.
  • Name data classes, not just systems.
  • Choose the hosting model honestly, including air-gapped if required.
  • Share the export before buying GPUs.

What the blueprint contains

The plan has a context section, a component table, security controls mapped to your answers, a three-phase rollout and a list of open questions. The components follow a common pattern: a read-only data path over a replica, a retrieval index, a tool server, a locally served open-weight model, identity mapping and an audit log. The details for Infor LX / BPCS reflect how it stores data and handles access.

  • Read-only first, drafts second, approved actions last.
  • Per-user visibility enforced outside the model.
  • Every answer traceable to a query or document.
  • Air-gapped operation supported by design.

Reading the output

Treat each table row as a decision to confirm, not a fact. For example, the data access row names a mechanism; your team still has to verify the exact objects in your release. The rollout table gives exit criteria so that each phase has a clear stop or go decision. Pair this blueprint with the sizing calculator to estimate GPU count and the monthly value so that the business case and the architecture agree.

  • Use the sizing calculator for GPUs and payback.
  • Run security review on section 3 before pilot.
  • Assign an owner to every open question.

Common mistakes

The most common mistake is starting with the model instead of the data path and permissions. A good model on top of an unfiltered database is a security incident waiting to happen. The second is skipping the data dictionary: coded table and field names need plain-language descriptions or answers will be unreliable. The third is allowing write access too early. Keep the first phase read-only and measure answer quality before adding drafts.

  • Do not give the model a database connection.
  • Do not skip replica isolation from production.
  • Do not index documents without their access rights.
  • Do not call it done without an audit log.

Frequently Asked Questions

Does this generator send my data anywhere?

No. The document is generated in your browser from the fields you enter. You choose whether to share the export with anyone, including us.

Is the blueprint specific to Infor LX / BPCS?

The structure is common to any private AI layer, while the data access, change capture and permission rows reflect how Infor LX / BPCS stores data and handles access. You should still verify object names and interfaces for your version.

Can I use it for an air-gapped site?

Yes. Select the air-gapped hosting option. The security section then states that no outbound route exists and that updates arrive on approved media.

Who should review the output?

At minimum the IT lead, the Infor LX / BPCS owner and information security. The open questions list is written so each can take away items to answer.

If you would like help turning this plan into a working Infor LX / BPCS assistant on your own hardware, Netray builds private, on-prem AI layers with partners who know the system.

Get Infor LX and BPCS alerts

Support and maintenance deadlines, release changes that affect Infor LX and BPCS sites, and new free Infor LX and BPCS tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Infor LX and BPCS: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Infor LX and BPCS? Start with the Infor LX and BPCS guide and toolkit.

Keep exploring