Infor XA DB2 for i SQL Extract Generator
Pulling data out of an Infor XA system for a spreadsheet, an audit or a migration usually means DB2 for i SQL and a copy to a stream file. This generator builds the preview, count, duplicate check and CSV export commands from five inputs.
Fill in
1. Preview a limited set of rows
SELECT ITNBR, ITDSC, ITCLS FROM XALIB.ITEMFILE WHERE ITCLS = 'FG' ORDER BY ITNBR FETCH FIRST 100 ROWS ONLY;
2. Count the rows that match
SELECT COUNT(*) AS ROW_COUNT FROM XALIB.ITEMFILE WHERE ITCLS = 'FG';
3. Check for duplicates on the order column
SELECT ITNBR, COUNT(*) AS DUPES FROM XALIB.ITEMFILE GROUP BY ITNBR HAVING COUNT(*) > 1 FETCH FIRST 50 ROWS ONLY;
4. Create a work file and export it to CSV (run from a CL command line)
RUNSQL SQL('CREATE TABLE QTEMP.XAEXTRACT AS (SELECT ITNBR, ITDSC, ITCLS FROM XALIB.ITEMFILE WHERE ITCLS = 'FG') WITH DATA') COMMIT(*NONE)
CPYTOIMPF FROMFILE(QTEMP/XAEXTRACT) TOSTMF('/home/export/item_extract.csv') MBROPT(*REPLACE) STMFCCSID(1208) RCDDLM(*CRLF) DTAFMT(*DLM) STRDLM(*DBLQUOTE) FLDDLM(',') ADDCOLNAM(*SYS)File and column names in this tool are placeholders. XA files often have short system names, so run DSPFFD on the real file first to get exact names, and check whether your release uses a company or plant field you must filter on. Steps 1 to 3 run in STRSQL or an SQL client, and step 4 is run on a command line. Test against a copy library before querying production at busy times.
XA data profiling for migration
An optional review of your extracts, duplicates and data quality before a move.
Optional. The tool and every export work without this. No spam.
How to use the generator
Find the real file and column names first with DSPFFD, because XA field names are short and not always intuitive. Enter the library, file, columns, filter and an output path in the integrated file system. Run the preview to confirm the data, the count to size the extract, the duplicate check to test your key, and then the export to produce a CSV you can download.
- Get exact names with DSPFFD
- Always preview with FETCH FIRST
- Check the key for duplicates before loading elsewhere
What each step does
The preview limits rows so a wrong filter does not scan and print a large file. The count tells you the size of the extract and lets you reconcile against the target after loading. The duplicate check shows whether the column you plan to use as a key is truly unique. The export builds a work table in QTEMP and uses CPYTOIMPF to write quoted, comma delimited text with column names in UTF-8.
Common mistakes
Forgetting company or plant fields is the most frequent cause of wrong counts, since one file may hold several entities. Character fields padded with spaces cause surprises in comparisons, so trim in your SQL where needed. Packed and zoned numbers with implied decimals can look wrong when exported raw, so cast or divide as appropriate and compare totals with an XA report.
- Filter on company or plant where the file has one
- Trim padded character fields
- Reconcile totals with a known XA report
- Run big extracts outside peak hours
Frequently Asked Questions
Can I run these queries from Excel or an SQL client?
Yes. Steps one to three work from STRSQL or any client using an IBM i ODBC or JDBC driver. Step four uses CL commands, so run it from a command line or a CL program, then download the resulting file from the IFS.
Why use FETCH FIRST?
It limits the number of rows returned, so a mistake in the filter does not produce a huge result and slow the system. Use it while developing a query, then remove it for the final extract.
How do I get column names?
Run DSPFFD on the file to list field names, types and lengths. You can also query the catalog view for columns in the library, which gives names and data types you can paste into the generator.
Will this change any data?
No. The queries only read, and the export writes to a temporary table and a stream file. Even so, run them with a profile that has read only authority to the production files as a safety measure.
If you are extracting XA data for a migration, we can help profile it, find duplicates and load it into the target system or a read only query layer.
Related Tools
IBM i Commands for Infor XA Administrators Reference
A lookup of common IBM i CL commands for jobs, output, libraries, objects, data and backups, with what each is for.
Other ERPsInfor XA (MAPICS) Application Module Reference
A lookup of the main Infor XA (MAPICS) application areas with scope and a migration consideration for each, for inventory of what you use.
Developer ToolsVISUAL SQL to CSV PowerShell Export Script Generator
Fill in server, database, query and folder to get a ready PowerShell script that exports VISUAL data to a dated CSV for scheduling.
ERP Migration & SelectionInfor VISUAL and XA Legacy System Risk Assessment
Ten questions that score how exposed your VISUAL or XA system is on support, skills, hardware, customisation and integrations.
More Developer Tools tools
See all- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- SAP QM Inspection Lot ABAP SELECT Generator
- SAP Quality Notification Pareto SQL Query Generator
- SAP QM Usage Decision BAPI Skeleton
- ABAP Custom Exception Class Generator
- ABAP Unit Test Class Generator
New to IBM i (AS/400) ERPs? Start with the IBM i (AS/400) ERPs guide and toolkit.
Keep exploring
Free tools
- Infor XA IBM i SQL Services Health Query GeneratorFill in your XA library, thresholds and subsystem and get five ready-to-run Db2 for i queries for file size, reorganise candidates, inactive users, active XA jobs and history file growth.
- IBM i (DB2 for i) SQL Data Extraction Script GeneratorGenerate DB2 for i SQL to inspect a file, count rows, and extract records with Julian date filters for JD Edwards World or other IBM i data.
- Infor XA Private AI Layer Blueprint GeneratorFill in your Infor XA version, database, hosting and use cases and get a shareable architecture plan for a private AI layer.
ERP fixes and how-tos
- How to add a private AI layer to Infor XA on-premReference architecture to add AI to Infor XA on-prem: read-only data path, retrieval, permissions, local GPUs, write-back control and rollout.
- How to Add AI to MAPICS and Infor XA on IBM i Without Leaving Your NetworkHow to give MAPICS and Infor XA on IBM i a private AI assistant: DB2 for i access, journal-based change capture, local GPU model, authority mapping and rollout.
- Infor XA costing: cost types, roll-up and standard cost setupHow product costing works in Infor XA (MAPICS): standard versus current cost, how roll-up builds cost from BOM and routing, setup order, and common pitfalls.
Integrations
- How to add AI agents to Infor XA on IBM iHow to add AI agents to Infor XA on IBM i: a tool layer over Db2 for i and RPG programs, approval gates, on-prem models, and realistic expedite and exception flows.
- How to connect Power BI to Infor XAHow to connect Power BI to Infor XA on IBM i: Db2 for i connector, on-premises data gateway, a staging warehouse, manufacturing dashboards and Q&A.