JD Edwards User Defined Codes Table SQL (F0004, F0005)
This generator writes four SQL queries against the JD Edwards EnterpriseOne user defined code tables: F0004 for UDC types, F0005 for values, a decode join from a business table, and F0005D for alternate language descriptions. It handles the right-justified DRKY key that breaks most first attempts.
Fill in
UDCs live in the control tables data source (for example PRODCTL, CRPCTL, TESTCTL).
00/DT is document type.
From UDC 01/LP.
1. UDC types for a product code (F0004)
SELECT t.DTSY AS product_code,
t.DTRT AS udc_type,
t.DTDL01 AS description,
t.DTCDL AS code_length,
t.DTCNUM AS numeric_flag,
t.DTLN2 AS two_line_flag
FROM CRPCTL.F0004 t
WHERE t.DTSY = '00'
ORDER BY t.DTRT;2. Values of one UDC (F0005)
SELECT u.DRSY,
u.DRRT,
LTRIM(RTRIM(u.DRKY)) AS code,
u.DRDL01 AS description_1,
u.DRDL02 AS description_2,
u.DRSPHD AS special_handling,
u.DRHRDC AS hard_coded
FROM CRPCTL.F0005 u
WHERE u.DRSY = '00'
AND u.DRRT = 'DT'
ORDER BY LTRIM(RTRIM(u.DRKY));3. Decode a code in a business table (F0101 search type, UDC 01/ST)
-- DRKY is CHAR(10) and short codes are stored right-justified with leading blanks,
-- while business columns such as ABAT1 are left-justified. Trim both sides.
SELECT a.ABAN8,
a.ABALPH,
a.ABAT1,
u.DRDL01 AS search_type_description
FROM CRPDTA.F0101 a
LEFT JOIN CRPCTL.F0005 u
ON u.DRSY = '01'
AND u.DRRT = 'ST'
AND LTRIM(RTRIM(u.DRKY)) = LTRIM(RTRIM(a.ABAT1))
ORDER BY a.ABAN8;4. Translated description with fallback (F0005D)
SELECT LTRIM(RTRIM(u.DRKY)) AS code,
COALESCE(d.DRDL01, u.DRDL01) AS description
FROM CRPCTL.F0005 u
LEFT JOIN CRPCTL.F0005D d
ON d.DRSY = u.DRSY
AND d.DRRT = u.DRRT
AND d.DRKY = u.DRKY
AND d.DRLNGP = 'F'
WHERE u.DRSY = '00'
AND u.DRRT = 'DT'
ORDER BY LTRIM(RTRIM(u.DRKY));Works on Oracle and SQL Server (LTRIM/RTRIM and COALESCE exist on both). On IBM i use your library names in place of the schemas. Check the control tables data source name for your path code in OCM before running. Wrapping DRKY in TRIM stops index use; for large decode reports, materialise the trimmed UDC list first.
Get a decoded reporting layer
Tell us the tables you report on and we will build a set of views that decode every UDC column correctly for your path codes.
Optional. The tool and every export work without this. No spam.
Where UDCs live in EnterpriseOne
User defined codes are maintained in P0004A (Work With User Defined Codes) and stored in the control tables data source, not with business data. On a typical install that means schemas such as PRODCTL, CRPCTL and TESTCTL, one per path code, while F0101 or F4211 sit in PRODDTA or CRPDTA. F0004 holds one row per UDC type (product code DTSY plus type DTRT) with its code length DTCDL. F0005 holds the values: DRSY, DRRT, the code DRKY, descriptions DRDL01 and DRDL02, special handling DRSPHD and the hard-coded flag DRHRDC. F0005D holds translated descriptions keyed by language DRLNGP.
How to use it
Set the control schema for the environment you are reporting on, the business data schema, and the product code and type you want (for example 00/DT for document types, 01/ST for address book search types). Query 1 lists every type under a product code with its length, useful when you are hunting for the right UDC. Query 2 lists values. Query 3 is the pattern for any decode join; replace F0101 and ABAT1 with your table and column and the 01/ST literals with that column's UDC. Query 4 returns the translated description when one exists and falls back to the base text.
- Find a column's UDC in the data dictionary (P92001), on the item's edit rule
- Hard-coded UDCs (DRHRDC = Y) are used by program logic; do not change their values
- Special handling codes drive logic in many programs, so report them too
The DRKY trap
DRKY is a 10 character field. When a UDC's code length is shorter than 10, JD Edwards stores the value right-justified, so a document type OP sits in DRKY as eight blanks followed by OP. The same value in a business column such as F4211 SDDCTO is left-justified. A join of DRKY = SDDCTO returns nothing, which is why the generated SQL trims both sides. The cost is that the database cannot use the F0005 index on DRKY, which is fine for UDCs of a few hundred rows but worth a materialised lookup in a heavy report.
Common mistakes
Querying the business data schema for F0005 often works by accident on a demo database and then fails in production where control tables are separate, so always point at the control tables data source. Second, people forget that each path code can have its own control tables, so a UDC added in CRP may not exist in production yet. Third, product codes are stored as four characters; comparing to the two character literal works on Oracle and SQL Server because trailing blanks are ignored in CHAR comparisons, but keep that in mind on other engines.
Frequently Asked Questions
Which table holds JD Edwards user defined codes?
F0005 holds the UDC values and F0004 holds the UDC type definitions. Alternate language descriptions are in F0005D and alternate type descriptions in F0004D. All of them sit in the control tables data source for the path code, not in the business data schema.
Why does my join to F0005 return no rows?
Almost always because DRKY is stored right-justified with leading blanks for codes shorter than ten characters, while the business column is left-justified. Trim both sides of the comparison, as the generated query does, and make sure you query the control tables schema rather than the business data schema.
How do I see user defined codes in JDE 9.2 without SQL?
Use P0004A, Work With User Defined Codes, entering the product code and UDC type. From there you can also see the type definition, including code length and whether the code is numeric. Changing a UDC there writes to F0005 in the control tables data source for your environment.
What does the hard-coded flag DRHRDC mean?
When DRHRDC is Y, programs depend on the code values, so they must not be changed or deleted. You can usually change the description, but adding or removing values in a hard-coded UDC can break processing. Treat hard-coded UDCs as read-only configuration owned by Oracle's application logic.
If you want people to ask JD Edwards questions in plain English and get answers with UDC codes already decoded, on your own servers, we can set that up.
Related Tools
JD Edwards User Defined Code Change Log Worksheet
Track each UDC value you add, change or retire, which environments it has reached, who approved it and why.
OracleJD Edwards System Codes Reference
Look up what each JD Edwards system code stands for and how it shows up in table, application and UDC names.
OracleJD Edwards Document Types Reference (OP, SO, OV, PV)
Searchable lookup of common JD Edwards document types such as OP, SO, OV and PV, with the module and the table that normally holds them.
Developer ToolsJD Edwards Received Not Vouchered SQL Generator (F43121, F4311)
Generate SQL that lists JD Edwards receipts still open for vouchering, with PO line detail, supplier name and supplier totals to reconcile against the AAI 4320 account.
More Developer Tools tools
See all- JD Edwards Orchestrator and AIS REST Call Generator
- JD Edwards Orchestrator Groovy Custom Request Script Generator
- JD Edwards F0911Z1 Journal Entry Batch Input SQL Generator
- JD Edwards C Business Function Skeleton Generator
- JD Edwards F3002 Multi-Level BOM Explosion SQL Generator
- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
New to JD Edwards EnterpriseOne? Start with the JD Edwards EnterpriseOne guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.
Keep exploring
Free tools
- JD Edwards System Codes ReferenceLook up what each JD Edwards system code stands for and how it shows up in table, application and UDC names.
- JD Edwards User Defined Code Change Log WorksheetTrack each UDC value you add, change or retire, which environments it has reached, who approved it and why.
- JD Edwards C Business Function Skeleton GeneratorGenerate the .h and .c skeleton of a JD Edwards EnterpriseOne C business function that reads one table record by key, returns a value and sets an error correctly.
ERP fixes and how-tos
- How to Release a Sales Order on Hold in JD EdwardsFind why a JD Edwards sales order is held, release credit, margin or manual holds with Release Held Orders, and tune hold codes so fewer orders get stuck.
- How to Add a Private AI Layer to JD Edwards EnterpriseOne On-PremAdd a private AI layer to JD Edwards EnterpriseOne: AIS data service, Orchestrator, Security Workbench mapping, a local model and human approval.
- JD Edwards table conversion: how it works and how to run oneWhat a JD Edwards table conversion does to a JDE table's structure and data, when it runs in a package build, and how to run or design one manually.
Runs with your ERP
- Vertex Tax Connectors with JD Edwards EnterpriseOneHow Vertex calculates sales, use and VAT tax for JD Edwards EnterpriseOne and World, plus Oracle EBS and Cloud ERP: integration model, flows, setup, pitfalls.
- RF-SMART and JD Edwards EnterpriseOne: Barcode Scanning and Mobile WMSHow RF-SMART connects barcode scanning to JD Edwards EnterpriseOne and World: integration method, data flows, setup steps, pitfalls and where private AI helps.
- Oracle CPQ and JD Edwards EnterpriseOne: quote to sales orderHow Oracle CPQ integrates with JD Edwards EnterpriseOne: customer data into quotes, sales orders created from quotes, and status back, with setup and pitfalls.
AI on your ERP
- AI for JD Edwards EnterpriseOne Manufacturing, Without Leaving the F-Tables ExposedGrounded AI over JD Edwards EnterpriseOne Manufacturing: work orders, routings, and Orchestrator data, answered on-prem without sending F-table data to a public model.
- AI for JD Edwards Inventory Management and Shop Floor ManufacturingAI on JD Edwards EnterpriseOne inventory and manufacturing: item ledger, work orders, MRP messages and cost variances, answered in plain English on your own servers.
Integrations
- How to add AI agents to JD Edwards EnterpriseOneHow to add AI agents to JD Edwards EnterpriseOne: Orchestrator and AIS as the tool layer, read-only first, human approval on writes, on-prem models.
- How to use ChatGPT with JD Edwards EnterpriseOneHow to use ChatGPT with JD Edwards EnterpriseOne: custom GPT actions over AIS, exports versus live access, enterprise data controls, and private alternatives.