BAPI_SALESORDER_CREATEFROMDAT2 ABAP Code Generator
Integrations from web shops, EDI or other systems often create SAP sales orders through BAPI_SALESORDER_CREATEFROMDAT2. This generator writes the skeleton, including the X structures, partners, schedule line, return check and commit.
Fill in
BAPI call
DATA: ls_header TYPE bapisdhd1,
ls_headerx TYPE bapisdhd1x,
lt_items TYPE STANDARD TABLE OF bapisditm,
ls_item TYPE bapisditm,
lt_itemsx TYPE STANDARD TABLE OF bapisditmx,
ls_itemx TYPE bapisditmx,
lt_partner TYPE STANDARD TABLE OF bapiparnr,
ls_partner TYPE bapiparnr,
lt_sched TYPE STANDARD TABLE OF bapischdl,
ls_sched TYPE bapischdl,
lt_schedx TYPE STANDARD TABLE OF bapischdlx,
ls_schedx TYPE bapischdlx,
lt_return TYPE STANDARD TABLE OF bapiret2,
ls_return TYPE bapiret2,
lv_vbeln TYPE bapivbeln-vbeln.
* Header
ls_header-doc_type = 'OR'.
ls_header-sales_org = '1000'.
ls_header-distr_chan = '10'.
ls_header-division = '00'.
ls_header-purch_no_c = 'PO-2026-0451'.
ls_headerx-updateflag = 'I'.
ls_headerx-doc_type = 'X'.
ls_headerx-sales_org = 'X'.
ls_headerx-distr_chan = 'X'.
ls_headerx-division = 'X'.
ls_headerx-purch_no_c = 'X'.
* Partners (customer numbers need leading zeros)
ls_partner-partn_role = 'AG'.
ls_partner-partn_numb = '100001'.
APPEND ls_partner TO lt_partner.
ls_partner-partn_role = 'WE'.
ls_partner-partn_numb = '100001'.
APPEND ls_partner TO lt_partner.
* Item
ls_item-itm_number = '000010'.
ls_item-material = 'FG-1001'.
ls_item-target_qty = 10.
ls_item-target_qu = 'EA'.
APPEND ls_item TO lt_items.
ls_itemx-itm_number = '000010'.
ls_itemx-updateflag = 'I'.
ls_itemx-material = 'X'.
ls_itemx-target_qty = 'X'.
ls_itemx-target_qu = 'X'.
APPEND ls_itemx TO lt_itemsx.
* Schedule line
ls_sched-itm_number = '000010'.
ls_sched-req_qty = 10.
ls_sched-req_date = '20261130'.
APPEND ls_sched TO lt_sched.
ls_schedx-itm_number = '000010'.
ls_schedx-updateflag = 'I'.
ls_schedx-req_qty = 'X'.
ls_schedx-req_date = 'X'.
APPEND ls_schedx TO lt_schedx.
CALL FUNCTION 'BAPI_SALESORDER_CREATEFROMDAT2'
EXPORTING
order_header_in = ls_header
order_header_inx = ls_headerx
IMPORTING
salesdocument = lv_vbeln
TABLES
return = lt_return
order_items_in = lt_items
order_items_inx = lt_itemsx
order_partners = lt_partner
order_schedules_in = lt_sched
order_schedules_inx = lt_schedx.Check the return table and commit
LOOP AT lt_return INTO ls_return WHERE type = 'E' OR type = 'A'.
WRITE: / ls_return-type, ls_return-id, ls_return-number, ls_return-message.
ENDLOOP.
IF sy-subrc = 0.
CALL FUNCTION 'BAPI_TRANSACTION_ROLLBACK'.
ELSE.
CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'
EXPORTING
wait = 'X'.
WRITE: / 'Sales order created:', lv_vbeln.
ENDIF.Test in a sandbox client first. Convert customer numbers with CONVERSION_EXIT_ALPHA_INPUT and material numbers with the conversion exit for your release. Pricing, output and credit checks run as in VA01, so the order can still be blocked. Verify structure names and fields in SE37 and SE11 on your release.
Order integration design review
Optional: a short call on the error handling and approval design of an order integration.
Optional. The tool and every export work without this. No spam.
How to use the generator
Fill the fields with your organization data and one test item, then copy the code into an ABAP program or a function module wrapper. Replace the single item block with a loop if you create multiple items, incrementing the item number in steps of ten. Read the return table every time, because the BAPI reports problems as messages and not as exceptions.
The X structures
The BAPI uses a changing flag pattern. Every value field in the data structure has a matching field in the X structure, and you set it to X for each field you pass, with UPDATEFLAG set to I on create. Forgetting the X flag is the most common reason a value you filled is silently ignored. The same pattern applies to items and schedule lines.
Commit and error handling
The BAPI does not commit by itself. You must call BAPI_TRANSACTION_COMMIT, with WAIT set to X if you read the order straight after, or roll back when the return table has an error or abort message. Message type W can be acceptable, but log it. For high volume, test locking and performance, and think about idempotency with the customer PO number so a retry does not create a duplicate.
- Check type E and A messages
- Commit with WAIT = X
- Convert numbers with exits
- Use the customer PO for duplicate checks
Frequently Asked Questions
Which BAPI creates a sales order in SAP?
BAPI_SALESORDER_CREATEFROMDAT2 is the standard function module for creating a sales order. It takes header, item, partner and schedule line data, plus the matching X structures, and returns the new document number and a message table.
Why is my field ignored by the BAPI?
Most often the matching flag in the X structure was not set to X. Set UPDATEFLAG to I for creation and mark each filled field in the X structure. Also confirm the field exists in the structure on your release.
Do I need to call BAPI_TRANSACTION_COMMIT?
Yes. The create BAPI only prepares the update. Without BAPI_TRANSACTION_COMMIT the order is not saved. Use rollback if the return table has an error or abort message so locks and buffered data are released.
Is there a newer option for S/4HANA?
SAP offers OData and SOAP APIs such as the Sales Order (A2X) API on the SAP Business Accelerator Hub. They are the usual choice for new external integrations, while the BAPI remains common in ABAP-side code. Check your release.
If you are building an order integration into SAP and need it reviewed, with human approval on write-back, Netray can take a look at the design. Ask for a review.
Related Tools
SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
Fill in sales organization, order type and date range to get a ready ABAP report skeleton that joins VBAK and VBAP and reads VBFA.
SAPSAP SD Tables Reference (VBAK, VBAP, LIKP, VBRK and More)
Lookup of the main SAP SD tables with their key fields and what changed in S/4HANA. Search, then export to Excel or PDF.
SAPSAP SD Go-Live and Cutover Readiness Checklist
A readiness checklist for sales and distribution cutover: data, configuration, interfaces, testing and hypercare.
SAPSAP SD Transaction Codes Reference
A searchable list of common SAP sales and distribution transaction codes, grouped by process area, for daily use and onboarding.
More Developer Tools tools
See all- SAP ABAP Open Items SELECT Generator
- ABAP BAPI Return Handling and Commit Generator
- SAP ACDOCA SQL Query Generator
- SAP QM Inspection Lot ABAP SELECT Generator
- SAP Quality Notification Pareto SQL Query Generator
- SAP QM Usage Decision BAPI Skeleton
- ABAP Custom Exception Class Generator
- ABAP Unit Test Class Generator
- SAP ABAP AUTHORITY-CHECK Snippet Generator
New to SAP HANA and Basis? Start with the SAP HANA and Basis guide and toolkit.
Keep exploring
Free tools
- SAP ECC BAPI_SALESORDER_CHANGE ABAP GeneratorGenerate a working ABAP program that updates an SAP sales order with BAPI_SALESORDER_CHANGE, with the correct X structures, schedule line handling, error check and commit or rollback.
- SAP BAPI Production Order Create and Release ABAP TemplateFill in material, plant, order type and dates and get an ABAP skeleton that creates and releases a production order with a commit.
- SAP BAPI_GOODSMVT_CREATE ABAP Code GeneratorFill in plant, material, quantity and movement type to get a working ABAP skeleton for posting a goods movement through the standard BAPI.
ERP fixes and how-tos
- SAP MM BAPI for PO Create and Change: BAPI_PO_CREATE1 and BAPI_PO_CHANGEHow to use BAPI_PO_CREATE1 and BAPI_PO_CHANGE: header, item and schedule structures, the X-structures, error handling in RETURN and the commit step.
- SAP Sales Order Incompletion Log in VA01/VA02: Fix and ConfigureSales order stuck incomplete? Read the VA02 incompletion log, find missing fields, and configure incompletion procedures and status groups in SD customizing.
- How to Use BAPI_TRANSACTION_COMMIT CorrectlyBAPIs never commit their own update. Here is when to call BAPI_TRANSACTION_COMMIT with WAIT, and why a BAPI can run fine and still save nothing.