JD Edwards UBE Runtime Log Worksheet
Batch performance complaints in JD Edwards are usually vague: the job is slow. A short runtime log turns that into numbers you can compare, so you can tell if a version slowed down, a queue is overloaded, or the data volume simply grew.
| UBE and version | Server / queue | Run date | Records processed | Runtime (min) | Records per second | Result | Observation | |
|---|---|---|---|---|---|---|---|---|
13.9394 | ||||||||
39.0244 | ||||||||
7.3446 | ||||||||
13.5185 | ||||||||
68.8889 |
Take records and runtime from your own Work With Submitted Jobs and report logs. Example rows are illustrative only. Compare the same version across days rather than different reports against each other.
Trend your UBE runtimes automatically
Optional: ask how batch history could be queried in plain language instead of copied into a log.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
Log every notable run of a UBE and version: the server and queue, the date, the records processed and the runtime in minutes. The worksheet calculates records per second for each row and the overall throughput at the bottom. Add a short observation such as month end, lock wait or large batch. Export to Excel to sort by throughput or filter by queue.
- Take runtimes from Work With Submitted Jobs or the job log.
- Use a consistent record count source, such as the report summary.
- Log failures too, with a note on the cause.
Reading the numbers
Throughput is records divided by seconds. It is a rough comparison tool, not a precise benchmark. If the same version drops sharply between two dates with similar volumes, look for locking, a changed index, a database statistics issue or competing jobs on the same queue. If throughput is steady but runtime grew, volume grew. Compare like with like: a posting UBE and a print UBE do very different work per record.
Where the time usually goes
In batch runs the time is commonly spent in database reads and writes, waiting on locks, or in business functions called per record. Logic or data selection changes in a processing option or data selection can change the number of records read without changing the records printed. Note the processing option template and data selection used for every logged run so results stay comparable.
Common mistakes
Teams compare a run that was alone on the queue with one that shared it with a dozen jobs. They log wall-clock time that includes waiting in queue, not the execution time. They forget to record the version. Keep the log short and consistent rather than detailed and abandoned.
Frequently Asked Questions
Where do I find runtime for a UBE?
Work With Submitted Jobs shows submitted, start and end times for each job, and the job log and report footers give more detail. Use the execution start and end, not the time the job spent waiting in the queue.
Is records per second a reliable benchmark?
It is useful for comparing the same version over time, not for comparing different reports. Record size, joins, business functions and I/O differ greatly between UBEs, so use it as a trend signal rather than a score.
How many runs should I log?
Start with the jobs people complain about and your month end critical path. Five or six runs of each give a baseline. Add more only if they help you make a decision.
Can I export the log?
Yes. Export to Excel, CSV or PDF from the tool. Excel is handy for pivoting by queue, server or version once you have a few weeks of data.
If you want runtime trends pulled automatically from your job history and asked in plain language, Netray can show how that works on your own data.
Related Tools
JD Edwards Batch Window Runtime Calculator
Estimate how long a JDE UBE will take from record volume, throughput and parallel runs, and test whether growth will break the batch window.
OracleJD Edwards Environment Refresh Runbook Template
A fill-in runbook for refreshing a JDE test or development environment from production: scope, data sources, pre-checks, steps, validation and sign-off.
OracleJD Edwards Go-Live Cutover Plan Worksheet
Plan each cutover task with an owner, start hour and duration, and see end times and total window length before the weekend arrives.
OracleJD Edwards User Defined Code Change Log Worksheet
Track each UDC value you add, change or retire, which environments it has reached, who approved it and why.
More Oracle tools
See all- JD Edwards Document Types Reference (OP, SO, OV, PV)
- JD Edwards UBE Job Scheduling Worksheet
- JD Edwards Table Reference (F4211, F4311, F0101, F4101, F4102)
- JD Edwards Tools Release Upgrade Checklist
- JD Edwards Orchestrator Design Template
- JD Edwards Security Workbench Worksheet
- JD Edwards Next Numbers Capacity Worksheet
- JD Edwards Object Promotion Request Template
- JD Edwards Data Dictionary Item Request Template
New to JD Edwards EnterpriseOne? Start with the JD Edwards EnterpriseOne guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.
Keep exploring
Free tools
- JDE UBE Runtime Baseline Log WorksheetAn editable log of UBE runs with computed throughput, so you can compare before and after a tools release, database or hardware change.
- JD Edwards UBE Job Scheduling WorksheetEditable worksheet to plan and document scheduled UBE batch jobs with versions, queues, run windows, dependencies and owners.
- JD Edwards Batch Window Runtime CalculatorEstimate how long a JDE UBE will take from record volume, throughput and parallel runs, and test whether growth will break the batch window.
ERP fixes and how-tos
- How to set data selection and processing options in JD EdwardsHow data selection and processing options actually work on a JD Edwards version, how they differ, and how to set them up correctly for a report or batch program.
- How to set up BI Publisher output for a JD Edwards reportJDE BI means BI Publisher: how to attach an RTF template to a JD Edwards EnterpriseOne UBE version, what to configure first, and why it may print the old way.
- JDE UBE failed (status E): how to read jde.log and jdedebug.logA JD Edwards UBE that ends with status E gives almost nothing in the Work With Submitted Jobs screen. Here is exactly where jde.log and jdedebug.log live and how to read them.
Runs with your ERP
- Vertex Tax Connectors with JD Edwards EnterpriseOneHow Vertex calculates sales, use and VAT tax for JD Edwards EnterpriseOne and World, plus Oracle EBS and Cloud ERP: integration model, flows, setup, pitfalls.
- Oracle CPQ and JD Edwards EnterpriseOne: quote to sales orderHow Oracle CPQ integrates with JD Edwards EnterpriseOne: customer data into quotes, sales orders created from quotes, and status back, with setup and pitfalls.
- Cleo Integration Cloud with JD Edwards: EDI Connector and Migration PathCleo Integration Cloud has a prebuilt JD Edwards EnterpriseOne connector for EDI. See data flows, setup steps, pitfalls and Oracle Fusion migration notes.
AI on your ERP
- Private AI for Oracle ERP Data Across EBS, JD Edwards and FusionPrivate AI across Oracle ERP data: open-weight models on your GPUs over EBS, JD Edwards and Fusion, with ERP security and no external model calls.
- AI for JD Edwards EnterpriseOne Manufacturing, Without Leaving the F-Tables ExposedGrounded AI over JD Edwards EnterpriseOne Manufacturing: work orders, routings, and Orchestrator data, answered on-prem without sending F-table data to a public model.
Integrations
- How to add an AI chatbot to JD Edwards EnterpriseOneAdd an AI chatbot to JD Edwards EnterpriseOne: grounded in ERP data via AIS, for planners, buyers and customers, and able to run fully on-prem.
- How to add AI agents to JD Edwards EnterpriseOneHow to add AI agents to JD Edwards EnterpriseOne: Orchestrator and AIS as the tool layer, read-only first, human approval on writes, on-prem models.