How to set up BI Publisher output for a JD Edwards report
how to set up BI Publisher output for a JD Edwards report
Also searched as
- attach BI Publisher template to JDE UBE
- JDE report design aid BI Publisher layout
- EnterpriseOne BI Publisher PDF output setup
- convert JDE report to BI Publisher format
- JDE BI
- JDE BI Publisher
Short answer
In JD Edwards, 'JDE BI' usually means BI Publisher, the template-based report layout tool, rather than a separate business intelligence product. BI Publisher for JD Edwards EnterpriseOne lets a UBE render through an RTF or PDF template designed in BI Publisher instead of EnterpriseOne's own print engine, giving far more control over layout for things like invoices, checks, and financial statements. Setting it up means confirming the connection to a BI Publisher server, building or importing a template against the report's XML data structure, and associating that template with the specific report version through Report Design Aid.
Applies to: JD Edwards EnterpriseOne 9.2 with BI Publisher for JD Edwards EnterpriseOne configured
Attach a BI Publisher layout to a UBE version
- 1Confirm EnterpriseOne is already configured with a working connection to the BI Publisher server - this is a one-time system setup done by CNC, not something set per report.
- 2Open the report in Report Design Aid and identify or create the version you want to output through BI Publisher rather than the standard print engine.
- 3Generate or confirm the report's XML data definition, which describes the fields and structure BI Publisher will use to build the template.
- 4Design the RTF template in Word using the BI Publisher desktop add-in, mapping fields from the XML data definition into the layout, or start from a template already delivered for that report if one exists.
- 5Upload the finished RTF template into the BI Publisher server under the correct report data definition.
- 6In the version's print options or Report Design Aid output settings, set the output type to BI Publisher and reference the correct template.
- 7Run the version in a test environment and confirm the output renders as expected in PDF (or the chosen output format) before moving the change to production.
Why use BI Publisher instead of standard JDE print
EnterpriseOne's native print engine is functional but limited for anything with complex formatting needs - multi-language output, precise check and form alignment, conditional formatting, or branded financial statements. BI Publisher templates are designed visually in Word (or Excel for spreadsheet-style output) against the report's actual data, giving report designers far more control without touching the underlying report's business logic.
This is why BI Publisher setup is most common for outward-facing documents like invoices, purchase orders, checks, and statutory reports, where exact layout matters, rather than for internal working reports where the default JDE output is fine.
The moving parts
Three things have to line up: the BI Publisher server itself has to be reachable from EnterpriseOne and correctly registered at the system level, the report needs an XML data definition that exposes its fields to BI Publisher, and a template built against that data definition needs to be associated with the specific version through Report Design Aid. Missing any one of these and the report either fails to render through BI Publisher or silently falls back to standard output.
The XML data definition is generated from the report's own data structure - if the underlying report's business view or event rules change, the data definition and any template built against it may need to be regenerated to stay in sync.
Template design workflow
Templates are typically built in Microsoft Word using the BI Publisher Desktop add-in, which lets a designer insert data fields, tables, and conditional regions directly against a sample of the report's XML output. This means report layout changes can often be made by someone comfortable with Word and BI Publisher, without needing a JDE developer to modify Report Design Aid event rules for a pure formatting change.
Once the RTF template is finalized, it is uploaded to the BI Publisher server under the matching report data definition, and multiple templates can exist for the same report - for example, different layouts per country or per output format - selected at the version or processing option level.
Common reasons the report still prints in the old format
The version's output type was not actually switched to BI Publisher in its print options. The template was uploaded under the wrong data definition or report ID, so BI Publisher cannot find a match. The BI Publisher server connection itself is misconfigured or unreachable, causing EnterpriseOne to fall back to standard print rather than failing outright. Or the XML data definition is stale relative to a recent change in the report's business view, so fields in the template no longer map to anything.
Try it here, free
Oracle EBS XML Publisher RTF Template Syntax Reference
Searchable list of the RTF template tags used in EBS XML Publisher (BI Publisher) reports, with examples for loops, grouping, conditions, date and number formatting, totals, variables and page layout.
Common pitfalls
- !Assuming a report will use BI Publisher automatically once a template exists, without switching the version's output type.
- !Building a template against an outdated XML data definition after the underlying report's data changed.
- !Not testing in a non-production environment before pointing a high-volume report like invoicing at a new template.
- !Treating BI Publisher template design as a pure layout task and forgetting that some conditional logic still needs to be handled in the report's event rules, not the template.
- !Uploading a template under the wrong report data definition so BI Publisher silently cannot find it.
How an ERP-grounded AI assistant handles this
ERPray can answer questions like which reports already have a BI Publisher template configured, or pull the exact data definition fields available for a given report, saving a report designer from opening Report Design Aid just to check. Building or fixing the actual template layout is still a design task for a person working in BI Publisher Desktop - ERPray helps with the lookup and setup verification around it, not the visual design work itself.
Frequently asked questions
Do I need a JDE developer to change a BI Publisher template layout?
For pure formatting changes - spacing, fonts, adding a logo, rearranging fields already in the data definition - no, anyone comfortable with Word and the BI Publisher Desktop add-in can update the template. A developer is only needed if the change requires new data that is not already exposed in the report's XML data definition.
Why does my report still show the old JDE print format after I uploaded a template?
The most common cause is the version's output type was never switched to BI Publisher in its print options, so EnterpriseOne is still using its own print engine. Confirm the output type setting on the version before assuming the template itself is the problem.
Can one report have different BI Publisher templates for different countries or languages?
Yes. Multiple templates can be associated with the same report data definition, commonly selected by language, country, or output format at the version or processing option level, which is one of the main reasons organizations move a report to BI Publisher in the first place.
What happens if the underlying report's business view changes after the template is built?
The XML data definition should be regenerated to reflect the new fields, and the template may need updating if fields it referenced were removed or renamed. Skipping this step is a common reason a previously working BI Publisher report starts producing blank or misaligned fields.
Related
JDE package build failed: how to find the real cause
A package build (Full or Update) that ends in a failed or errored status on the deployment server does not explain itself in the Package Build Workbench screen. The real diagnostic detail is in the package's own log subdirectory on the deployment server, which holds a build log, a table conversion log, and per-object compile logs that pinpoint the actual failure.
Error fixJDE UBE failed (status E): how to read jde.log and jdedebug.log
A UBE (batch report/program) that ends with status E in Work With Submitted Jobs tells you almost nothing on its own. The real error is in jde.log on the enterprise server, in the job's own PDF/log subdirectory (jdedebug.log if you turned on debug), and in the work directory for that job number under PrintQueue or the OS temp path.
How-toHow to set data selection and processing options in JD Edwards
Data selection controls which rows a UBE's underlying business view reads (a filter, stored per version in F9210/F9211), while processing options control how the program behaves once it has that data (a settings template stored per version in F983051/F983052). They are configured from the same Version Detail screen but are separate, unrelated mechanisms that new users routinely confuse.
How-toJDE One View Report stuck pending: how to publish it to other users
One View Reports are a type of User Defined Object (UDO), and like other UDOs, a report a business user designs is saved as Pending by default and only visible to its creator until an administrator with UDO administration security approves it and assigns it to a role or *PUBLIC. This approval and availability step, not the report design itself, is the most common reason a finished One View Report is not showing up for anyone else.
Error fixJD Edwards: record is being used by another user (record reservation)
EnterpriseOne places a soft record reservation lock when a user opens a record for edit, tracked in the F00165 table, and releases it when the user saves, cancels, or the session ends cleanly. A stuck lock almost always means a session died abnormally (browser crash, network drop, kiosk timeout) without triggering the release, and it must be cleared by an admin, not by the original user retrying.
Error fixJD Edwards business function (BSFN) errors: how to diagnose them
A BSFN error in EnterpriseOne means either the compiled function was not found for the current package build, or the function ran and threw an internal exception (often a null business view row, an unhandled C runtime error, or a failed table I/O). The fix path is different for each, so the first step is always determining which one you are facing from jde.log.
AI for ERPAI for JD Edwards EnterpriseOne, Built on Orchestrator and AIS
Add AI to JD Edwards E1 9.2 using Orchestrator, AIS, and BSSV rather than screen-scraping. Ground a private LLM on F4211, F4111, and F0411 data.
AI for ERPAI for JD Edwards World on IBM i, without a EnterpriseOne migration
Add AI to JD Edwards World on IBM i without replatforming: read the physical files safely, ground an LLM on your data, and keep control on the box you already run.
Stuck on JD Edwards EnterpriseOne?
Talk to engineers who work inside JD Edwards EnterpriseOne every week, and who build private AI that answers these questions from your own ERP data.
New to JD Edwards EnterpriseOne? Start with the JD Edwards EnterpriseOne guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.
Keep exploring
Free tools
- Oracle EBS XML Publisher RTF Template Syntax ReferenceSearchable list of the RTF template tags used in EBS XML Publisher (BI Publisher) reports, with examples for loops, grouping, conditions, date and number formatting, totals, variables and page layout.
- Oracle Fusion BI Publisher Report Specification TemplateDocument a BI Publisher report before you build it: purpose, data model, parameters, layout, schedule and security in one template.
- JD Edwards UBE Job Scheduling WorksheetEditable worksheet to plan and document scheduled UBE batch jobs with versions, queues, run windows, dependencies and owners.
ERP fixes and how-tos
- How to Create a BI Publisher Report in Oracle EBSBuild an Oracle EBS BI Publisher report end to end: write the data model, register the data definition, design the RTF template, and wire it to a concurrent program.
- Oracle EBS Standard Reports by Module and Sample XML for BI PublisherHow to find and run Oracle EBS standard reports by module, and how to get sample XML data to design a BI Publisher template for an EBS report.
- How to set data selection and processing options in JD EdwardsHow data selection and processing options actually work on a JD Edwards version, how they differ, and how to set them up correctly for a report or batch program.
Runs with your ERP
- Spreadsheet Server with JD Edwards EnterpriseOne: live Excel reportingHow insightsoftware Spreadsheet Server pulls live JD Edwards GL and transaction data into Excel with drill-down and scheduling: setup, pitfalls, AI options.
- RF-SMART and JD Edwards EnterpriseOne: Barcode Scanning and Mobile WMSHow RF-SMART connects barcode scanning to JD Edwards EnterpriseOne and World: integration method, data flows, setup steps, pitfalls and where private AI helps.
- Oracle CPQ and JD Edwards EnterpriseOne: quote to sales orderHow Oracle CPQ integrates with JD Edwards EnterpriseOne: customer data into quotes, sales orders created from quotes, and status back, with setup and pitfalls.
AI on your ERP
- JD Edwards AI Consulting: How to Scope and Implement AI on EnterpriseOneJD Edwards AI consulting and implementation: scope, phases, Orchestrator and AIS design, security, cost and partner questions for EnterpriseOne and World.
- AI for JD Edwards Inventory Management and Shop Floor ManufacturingAI on JD Edwards EnterpriseOne inventory and manufacturing: item ledger, work orders, MRP messages and cost variances, answered in plain English on your own servers.
Integrations
- How to connect Power BI to JD Edwards EnterpriseOneConnect Power BI to JD Edwards EnterpriseOne: database, AIS and warehouse options, on-prem gateway, manufacturing dashboards and natural-language Q&A.
- How to add AI agents to JD Edwards EnterpriseOneHow to add AI agents to JD Edwards EnterpriseOne: Orchestrator and AIS as the tool layer, read-only first, human approval on writes, on-prem models.