Laser Cutting Kerf Compensation Calculator (Offset and Programmed Size)
A laser beam removes a strip of material, the kerf, and the finished part is smaller or larger than the programmed line unless the toolpath is offset. This calculator gives the offset per side, the programmed dimension for outside contours and inside features, and how much material the kerf consumes.
Your numbers
The finished part dimension on the drawing.
Measured cut width from a test cut at the same material, gas, speed and nozzle.
Outside contours are programmed larger by the kerf. Inside features are programmed smaller.
Sum of all contours cut for the part or the nest.
Your results
Kerf varies with material, thickness, gas, nozzle, focus position, speed and machine wear, and is not uniform at corners and on small holes. Measure it with a test cut on your machine. Most CAM and laser controllers apply the offset for you.
Programmed path dimension vs kerf width
Sweeps Kerf width from 0.05 to 0.6, holding your other inputs fixed.
Nest, cut and scrap data in your ERP
Optional: an expert review of connecting actual cut results and kerf loss to quoting and job costing.
Optional. The tool and every export work without this. No spam.
How to use it
Cut a test shape, such as a 50 mm square with a 20 mm hole, in the same material, gas and nozzle you will use for production. Measure the result with calipers and divide the difference by the number of edges it covers to get the kerf. Enter the nominal feature size, the kerf, and whether the feature is an outside dimension or a hole or slot. The calculator returns the toolpath offset, the programmed center-line dimension and the error you would see without compensation. If you enter the thickness and the cut length you also get the volume and mass lost to kerf.
- Measure kerf on your machine, not from a chart
- Re-measure after a nozzle change or lens service
- Use a separate kerf for each material, thickness and gas
- Small holes and tight corners need extra care
How the compensation works
The beam center follows the programmed path and the kerf removes half its width on each side. For an outside contour the path must sit half a kerf outside the finished edge, so the programmed path dimension is the nominal plus the kerf. For a hole or slot the path sits half a kerf inside, so the programmed dimension is the nominal minus the kerf. Controllers and CAM systems do this with a cutter compensation value equal to half the kerf, selecting left or right of the path. Applying it twice, once in CAM and once in the controller, is a classic error.
Worked example
A 3 mm mild steel part on a fiber laser has a measured kerf of 0.20 mm. The nominal outside width is 100 mm with a tolerance of plus or minus 0.1 mm. The offset is 0.10 mm per side and the programmed path dimension is 100.20 mm. A 20 mm hole is programmed at 19.80 mm. Without compensation the part would be 0.20 mm undersize, which is 100 percent of the 0.2 mm tolerance band, so it would sit right on the limit. The kerf also removes about 1.44 cm3 or around 11 g of steel over a 2,400 mm cut length.
Common mistakes
People often enter the offset instead of the full kerf, which halves or doubles the correction. Another is using one kerf for all thicknesses: kerf typically grows with thickness and varies with gas and focus. Small holes cut with high power may taper, with different top and bottom diameters, which a single kerf cannot fix. Last, forgetting that nesting needs spacing at least equal to the kerf plus a safety margin leads to parts that clip each other or lose edge quality.
Frequently Asked Questions
What is a typical kerf for fiber laser cutting?
Roughly 0.1 to 0.5 mm depending on material, thickness, gas, nozzle and focus. Thin sheet cut with nitrogen is at the low end and thick plate at the high end. Always measure on your own machine and material.
Do I offset by the kerf or half the kerf?
Offset each side by half the kerf. The programmed dimension changes by the full kerf, because both sides move. Entering the full kerf into a field that expects the offset doubles the correction.
Is kerf compensation done in CAM or in the controller?
Either, but only one. Most nesting and CAM software writes the offset into the path, and then the controller must have compensation turned off. If both apply it, parts are off by a full kerf.
Why do small holes come out the wrong size?
Heat, taper, piercing and the lead-in strategy affect small holes more than large profiles. Kerf at the top and bottom of the hole differ, and the hole can be bell-shaped. Use test cuts and adjust parameters per hole size rather than relying on one kerf value.
If your cutting jobs, nest programs and material consumption sit in an ERP or shop floor system, Netray can help connect actual cut results and scrap to quotes and costing, using private on-prem tools.
Related Tools
Laser Power Density Calculator
Convert laser power, spot diameter, repetition rate and pulse width into average irradiance, peak irradiance, pulse energy, fluence and peak power.
Discrete ManufacturingPhotonics Rolled Throughput Yield Calculator
Multiply stage yields from incoming to final test to get rolled throughput yield, good units, scrap, starts needed for a target and cost per good unit.
Engineering & PLMOptical Lens Focal Length Calculator
Find focal length from surface radii and glass index, then image distance, magnification, f-number and diffraction-limited spot size.
Safety & WorkforceLaser Safety Classification Reference
A searchable table of laser classes and the safety terms behind them: AEL, MPE, NOHD, optical density, interlocks and controlled areas.
More Discrete Manufacturing tools
See all- OEE Calculator (Overall Equipment Effectiveness)
- Scrap Rate Cost Calculator
- Takt Time Calculator
- Cycle Time & Capacity Calculator
- Inventory Carrying Cost Calculator
- Economic Order Quantity (EOQ) Calculator
- MRP Nervousness Assessment
- Production Scheduling Maturity Assessment
- Shop Floor Digitization Scorecard
Keep exploring
Free tools
- Laser Cutting Cost CalculatorWork out run time, machine cost, setup per part, material and a selling price for laser cut parts, and see how quantity changes unit cost.
- Laser Cutting Time per Part CalculatorBreak a laser job into cutting, piercing and sheet handling time to get a realistic run time and parts per hour.
- Fiber Laser Cutting Speed and Pierce Time Indicative ReferenceIndicative speed and pierce time ranges for common sheet and plate thicknesses on a 6 kW class fiber laser, for early estimating only.
Guides
- How to Estimate Laser Cutting Cost Per PartA working formula for laser cutting cost per part: cut time, pierce time, assist gas, material by nest, machine rate, setup and handling for fab shops.
- Sheet Metal Quoting Software for FabricatorsHow to choose sheet metal quoting software: DXF import, nest-aware material cost, bend and weld time, outside finishing, and a clean handoff to your ERP.
- Bar Stock Cost Estimating for Screw Machine and Swiss PartsEstimate bar stock cost for screw machine and Swiss parts: bar length, remnant, cutoff kerf, face-off, mill minimums and yield per bar, with ERP tips.