Free Discrete Manufacturing tools
189 templates, calculators, worksheets and reference tables. Each runs in your browser and exports to PDF, Excel, Word or CSV.
Templates and forms
Infor VISUAL Engineering Change Notice Template
A fill-in ECN form covering part revision, engineering master and BOM changes, open work order impact and approvals, ready to export.
Job Shop RFQ Intake Form Template
A one-page request for quote intake form so every RFQ reaches the estimator with the same information before anyone opens JobBOSS, E2 Shop System or Global Shop Solutions.
Manufacturing KPI Dashboard Template
A one-page monthly KPI dashboard for plant reviews: delivery, quality, inventory, cost and safety with target, actual and commentary.
Monthly Operations Review Report Template
Fill-in monthly operations review covering delivery, quality, inventory and cost, with actions and decisions required.
Kaizen Event Charter Template
Fill in the fields and generate a one-page charter for a kaizen blitz, with scope, targets, team, timeline and approvals.
Daily Tier 1 Huddle Meeting Template
Record the daily Tier 1 huddle: safety, quality, delivery, cost, problems and actions, with owners and due dates.
Risk Response and Contingency Plan Template
A document for the top risks on a program: how you will respond, what triggers the fallback and who decides.
CNC Chip Load Reference Worksheet
A printable chip load starting-point chart for carbide end mills with a fill-in record for the cutting data you finally prove out.
Returnable and Non-Returnable Gate Pass Template (India Factory)
A printable gate pass for tools, dies, samples and materials leaving the plant, with return tracking and approvals.
COO Monthly Operations Report Template
A one to two page monthly operations report: headline KPIs, highlights, problems, actions and decisions needed from leadership.
Excel Machine Shop Quote Template
A fillable machine shop quote with price breaks, setup charges, lead time and terms. Includes a worked example and format notes for sheet metal and injection molding quotations.
Manufacturing MIS Report Template
Fill in one monthly MIS report for a manufacturing company: production, quality, delivery, inventory and cost, with the ERP source of each number.
Work Order Template (PDF Sample and Filled Example)
A fill-in work order form pre-loaded with a realistic sample for a production job. Edit the fields and export a clean PDF, Word or Excel copy.
Manufacturing Routing Sheet Template
A routing sheet generator for operations, work centers, setup and run times, tooling and inspection points, with a worked sample you can overwrite.
CNC Machining and Machinery Quotation Format Template
Choose CNC parts, machinery supply or machine repair, fill the fields and export a professional quotation with terms, tolerances, lead time and exclusions.
Worksheets
Job Shop Quote Worksheet
Quote a machined part operation by operation: setup hours, run minutes per piece, shop rate and material. Totals the cost and shows the price at a target margin.
KPI Target Setting Worksheet
Compare baseline, best recent result and target for each KPI, with gap and improvement percent computed per row.
SMED Changeover Element Analysis Worksheet
List each changeover element, classify it as internal or external, and record planned time savings with totals.
Value Stream Map Data Worksheet
Fill in the data box for each process step of your current-state map and get total lead time, value-added time and process cycle efficiency.
Yamazumi Line Balancing Worksheet
Record station times by value-add, necessary and waste, compare each to takt time and see how balanced the line is.
Lean 8 Wastes Observation Log
Log waste by type and area, estimate daily minutes and cost, and see which wastes deserve a kaizen first.
Master Production Schedule Template
A weekly MPS grid with forecast, customer orders, projected on hand and planned production quantity for a single product.
Sheet Metal K-Factor Worksheet
An editable log of verified K-factors by material, thickness, radius and angle, with bend allowance and radius-to-thickness ratio computed on every row.
Steel Plate Cut List Weight Worksheet
Fill a cut list row by row and get piece weight, line weight and total order weight for plate, sheet and flat parts.
Plate Nesting Utilization and Material Cost per Part Worksheet
Enter sheet size, thickness, density, part area and parts per nest to get sheet weight, utilization percent and material cost per part for each job.
Pharma Stage Yield and Reconciliation Worksheet
Enter input, output, samples and rejects for each manufacturing stage to see yield and unaccounted loss that needs an explanation.
Furniture Cut List and Panel Yield Worksheet
An editable cut list that totals part area and estimates how many board sheets a furniture job needs, exportable to Excel.
Load Shedding Downtime Loss Log Worksheet
An editable outage log that turns grid downtime and generator hours into lost units, lost contribution and diesel cost per shift.
Strategic Initiative Portfolio Tracker Worksheet
Track every improvement and transformation initiative in one table: owner, budget, spend, percent complete, expected benefit and status.
Hoshin Kanri X-Matrix Worksheet
A table-based policy deployment worksheet: link long-term objectives to annual goals, improvement priorities, metrics and owners.
Site Consolidation Decision Matrix Worksheet
Compare plants or footprint options against weighted criteria such as cost, capability, labor, customers and risk. Editable and exportable.
Strategic Initiative Prioritization Scoring Worksheet
An editable scoring table that ranks operations initiatives on impact, strategic fit, effort and risk, with benefit, cost and payback for each.
Automation Candidate Process Scoring Worksheet
List manual processes, enter volume and effort, score rule clarity, data quality and risk, and get a ranked automation shortlist with annual hours at stake.
Manufacturing Capacity Planning Template (Excel)
An editable capacity planning spreadsheet for work centers. Enter machines, shifts and planned load by week and see available hours, utilization, spare hours and overload flags.
Machine Shop Scheduling Excel Template
An editable job shop schedule with machines, jobs, setup and run hours, due dates and priority. Includes scheduling model examples such as earliest due date and shortest processing time.
Excel Manufacturing Production Planning and Tracking Worksheet
An editable production worksheet for small manufacturers. Enter planned and actual quantities per order and work center, and it calculates hours, yield and attainment, then exports to Excel.
Work Order Tracking Report Worksheet
An editable open work order report with status, quantities, hours and due dates. It computes hour variance and percent complete per row and shows where the ERP report equivalents live.
Standard Work Sheet Template for Manufacturing
An editable standard work sheet with work elements, times, takt, standard WIP and safety or quality points. It totals operator time and compares it to takt.
Calculators and simulators
OEE Calculator (Overall Equipment Effectiveness)
Break your Overall Equipment Effectiveness into availability, performance, and quality, and see how far you sit from the 85% world-class benchmark.
Scrap Rate Cost Calculator
Turn your scrap percentage into an annual dollar figure - including labor and overhead absorbed by scrapped units - and see what each point of improvement is worth.
Takt Time Calculator
Compute the takt time your line must hit to meet customer demand, plus the required hourly rate for supervisors and schedulers.
Cycle Time & Capacity Calculator
Translate cycle time, parallel stations, shift pattern, and realistic utilization into hourly, daily, and annual production capacity.
Inventory Carrying Cost Calculator
Build your true annual carrying cost from capital, storage, insurance, and obsolescence components - and see what an inventory reduction target is worth.
Economic Order Quantity (EOQ) Calculator
Compute the order quantity that minimizes combined ordering and holding cost, with orders per year and total annual cost at the optimum.
Manufacturing Downtime Cost Calculator
Combine lost contribution margin, idle labor, and absorbed overhead into a defensible monthly and annual downtime cost - with recovery effects modeled.
Safety Stock Calculator
Size statistically defensible safety stock using demand variability, lead time variability, and your target service level, then see what that buffer costs to carry.
Reorder Point Calculator
Calculate the reorder point that triggers replenishment at the right moment, including review period coverage, and see the inventory value your ordering policy carries.
Inventory Turnover Calculator
Convert your COGS and average inventory into turns and days on hand, then see how much working capital a realistic turns target would release.
Forecast Accuracy (MAPE) Calculator
Turn your forecast and actual history into MAPE, accuracy, and bias figures, then price what that error is costing you across the year.
Stockout Cost Calculator
Price the full annual cost of stockouts across lost margin, expediting, and downstream customer damage, and see what each point of fill rate is worth.
Make vs Buy Calculator
Compare in-house production cost against fully landed purchase price, including tooling amortization, and find the volume where making beats buying.
Procure-to-Pay Efficiency Calculator
Quantify the labor cost buried in your purchase order and invoice processing, including exception handling, and benchmark your cost per invoice against automation leaders.
Smart Factory ROI Calculator
Convert a targeted OEE improvement into monthly revenue lift, total capex, and payback period across your production lines.
IIoT Sensor Deployment Cost Calculator
Estimate hardware, gateway, installation labor, network upgrade, and annual platform costs for an industrial IoT sensor rollout across your machines.
Predictive Maintenance ROI Calculator
Predictive and condition-based maintenance ROI calculator: compare baseline unplanned downtime cost against monitoring cost to see net annual savings across your asset fleet.
MES Implementation Cost Calculator
Estimate total MES implementation cost across licensing, shop-floor terminal hardware, configuration labor, and ERP integration complexity.
Warehouse Automation ROI Calculator
Compare manual and automated pick times to calculate daily labor hours saved, annual savings, and payback period for a warehouse automation investment.
Energy Efficiency Savings Calculator
Estimate monthly and annual energy savings, net capex, and payback period for common manufacturing energy efficiency measures.
Paperless Shop Floor ROI Calculator
Calculate labor time saved and rework avoided by replacing paper travelers and work orders with digital shop-floor terminals or tablets.
Supply Chain AI ROI Calculator
Estimate year-one ROI and payback for a supply chain AI initiative from forecast accuracy, freight avoidance, and inventory reduction against your spend and implementation cost.
Tariff Impact Calculator
Model how origin-specific duty rates hit your imported cost of goods, how much margin erodes after pass-through, and the price increase needed to hold your target margin.
Nearshoring Cost Comparison Calculator
Compare the fully loaded landed cost per unit across sourcing regions, including freight, duty, lead-time-driven inventory carrying cost, and quality rework.
Logistics Cost Optimization Calculator
Model freight savings from shifting mode mix, consolidating shipments, and cutting accessorial fees against your actual monthly shipment volume and average cost.
VISUAL EOQ and Lot Size Setup Cost Calculator
Compute economic order quantity and see what your current lot size costs per year, with a sweep chart across lot sizes.
Bar Stock Yield and Material Cost per Part Calculator
Work out how many parts come from each bar after cutoff and end loss, how many bars to buy, and the true material cost per part.
Make to Order Promise Date and Lead Time Calculator
Compute the calendar days to promise a customer from material arrival, queue, setup, run hours at your efficiency, and ship time.
Production Run Economic Batch Size Calculator
Find the economic production quantity that balances setup cost against carrying cost when parts are made in house at a finite rate.
Load Shedding Cost Calculator for Manufacturers
Put a monthly rand figure on power outages: generator fuel, maintenance, idle labour and the contribution you could not produce.
Order Backlog Coverage and Book-to-Bill Calculator
Convert backlog into weeks of coverage, compute book-to-bill and project where the backlog goes if orders and shipments stay on trend.
Changeover Reduction (SMED) Savings Calculator
Quantify the annual hours, extra capacity and value released by shortening changeovers with SMED.
Spaghetti Diagram Distance Calculator
Convert the distance you measured on a spaghetti diagram into walking time and annual cost, and compare it to an improved layout.
Little's Law Lead Time and WIP Calculator
Convert WIP and throughput into lead time, process cycle efficiency and the WIP cap needed for a target lead time.
SMED Changeover Reduction Savings Calculator
Turn a setup time reduction target into hours freed, machine cost saved and extra parts per year, with a what-if sweep of the target setup time.
EPEI Every Part Every Interval Calculator
Calculate how often you can make every part on a shared resource given changeover time, demand and run time, and the batch each part needs.
Process Cycle Efficiency Calculator
Calculate process cycle efficiency (value-add time as a share of total lead time) and see how much waiting dominates your flow.
Batch Size vs Lead Time and Setup Share Calculator
Compare the lead time of a batch through several operations with the share of time lost to setup, and find the batch that reaches a target setup share.
Planned Order Offset and Start Date Calculator
Add setup, run, queue, move and safety time to get the lead time offset MRP should use to back schedule a made-in-house order.
CNC Speeds and Feeds Calculator
Turn a surface speed and chip load into spindle RPM and table feed for any end mill, capped at your machine's maximum RPM.
Material Removal Rate Calculator
Calculate milling MRR from width of cut, depth of cut and feed, then estimate the spindle horsepower the cut will need.
Surface Finish Ra to RMS Converter
Convert Ra to RMS in microinches or micrometers and estimate the theoretical Ra a turning insert leaves from feed and nose radius.
Tool Life Taylor Equation Calculator
Use the Taylor equation V x T^n = C to predict tool life at a new cutting speed or find the speed that gives a target tool life.
CNC Spindle Power and Torque Required Calculator
Check whether your machine has enough power and torque for a milling cut before you run it, using specific cutting force kc and drive efficiency.
CNC Thread Milling Feed Rate Calculator
Convert the feed per tooth at the cutting edge into the programmed centreline feed for internal and external helical thread milling.
Ball End Mill Scallop Height and Stepover Calculator
Choose the stepover for 3D finishing so that cusp height stays within your surface finish target, and see the time cost of a finer stepover.
CNC Radial Chip Thinning Feed Compensation Calculator
When radial depth is less than half the cutter diameter the chip is thinner than the feed per tooth. Find the feed that restores the chip thickness you want.
CNC Turning Surface Roughness and Feed Calculator
Connect feed per revolution and insert nose radius to the theoretical surface roughness, and pick the fastest feed that still meets the drawing.
CNC End Mill Deflection Calculator
Predict how far a cutter bends under load, and see why shorter stickout and a larger diameter matter so much for accuracy.
Drill Point Length Calculator
Calculates drill point length for common point angles, the Z depth to program for a full-diameter hole, spindle rpm, feed and drilling time.
Turning Cutting Time Calculator
Estimates turning rpm, feed rate, number of passes, cutting time and metal removal rate for a straight turning cut.
Boring Bar Overhang Ratio Calculator
Checks boring bar overhang to diameter ratio against typical limits and estimates tip deflection under a cutting force.
Knurling Blank Diameter Calculator
Estimates the blank diameter to turn before a formed knurl, the diameter growth, and a diameter that gives a whole number of teeth for clean tracking.
Tapping Torque Calculator
Estimates cutting tap torque, thread engagement and spindle power from thread size, tap drill diameter, material and tap condition.
Turning Surface Finish Calculator (Ra, Nose Radius and Feed)
Theoretical Ra and peak-to-valley height for a turned surface, plus the maximum feed that still meets your drawing's finish callout.
Turning Cutting Power and Spindle Load Calculator
Find cutting force, power at the cut, motor power and spindle torque for a turning pass, and see how depth of cut drives the load.
Drilling Torque, Power and Feed Rate Calculator
Know the spindle rpm, feed in mm/min, torque and power a twist or indexable drill needs before you run it on a small machine.
Lathe Taper Per Foot and Tailstock Offset Calculator
Calculate taper per foot, taper per inch, an approximate half angle and tailstock setover from large and small diameters.
Sheet Metal Bend Allowance Calculator
Enter thickness, inside radius, K-factor and bend angle to get bend allowance, bend deduction and the flat blank length for a single bend.
Press Brake Tonnage Calculator
Estimate the force needed to air bend, bottom or coin a part, then check it against your press capacity and the minimum flange.
Sheet Metal Nesting Yield Calculator
Turn a nest result into yield, scrap percentage, sheets required and material cost per part, with scrap credit.
Punching Force Calculator for Sheet Metal
Estimate the tonnage to punch round holes in sheet metal, including stripping force, die clearance and a machine capacity check.
Sheet Metal Flat Blank Length Calculator
Turn outside leg dimensions and bend data into the flat pattern length, using outside setback, bend allowance and bend deduction.
Press Brake Die Opening and Minimum Flange Calculator
Choose a V-die width by thickness multiplier and check whether your flange is long enough to form without slipping into the die.
Sheet Metal Springback and Overbend Calculator
Estimate how far a bend relaxes after the punch retracts and what tool angle to program to land on the target angle.
Laser Cutting Time per Part Calculator
Break a laser job into cutting, piercing and sheet handling time to get a realistic run time and parts per hour.
Mold Shrinkage Cavity Dimension Calculator
Compute the cavity dimension needed to hit a nominal part size after the resin shrinks, and see how much of the tolerance shrinkage variation consumes.
Injection Molding Cooling Time Calculator
Estimate the cooling time of a molded part from wall thickness, resin thermal diffusivity, melt, mold and ejection temperatures, and see how it drives total cycle time.
Barrel Residence Time Calculator
Estimate how long resin sits in the barrel and how much of the machine capacity a shot uses, to spot degradation risk from oversized presses.
Forging Press Tonnage Estimator
Estimate the press force needed for open die or closed die forging from projected area, flow stress and a shape complexity factor, with a safety margin.
Forging Billet Weight and Yield Calculator
Work out the billet weight needed for a forged part given flash, scale and butt losses, then see yield and net material cost per piece.
Tempering Hollomon-Jaffe Parameter Calculator
Compute the Hollomon-Jaffe tempering parameter and the equivalent time at another temperature, or the temperature that gives the same softening in a target time.
Carburizing Case Depth and Time Calculator
Estimate effective case depth for a carburizing temperature and time using a square-root diffusion model, or solve for the time needed for a target depth.
Casting Riser Sizing Modulus Calculator
Calculate riser diameter, height and volume from casting volume and cooling area, and check the riser has enough feed metal.
Photonics Rolled Throughput Yield Calculator
Multiply stage yields from incoming to final test to get rolled throughput yield, good units, scrap, starts needed for a target and cost per good unit.
Laser Cutting Kerf Compensation Calculator
Work out the kerf offset per side, the programmed toolpath dimension for outside contours, holes and slots, and the material removed by the kerf.
Laser Pulse Overlap and Heat Input Calculator
Work out pulse spacing, overlap and line energy for a scanning or moving pulsed laser from speed, repetition rate, spot size and power.
Recipe Batch Scaling Calculator
Scale a base formula up to a target finished weight, accounting for cook or process loss and the number of mixer batches.
Brix Syrup Blend Calculator (Pearson Square)
Calculate the masses of concentrated syrup and diluent needed to hit a target Brix for a batch, with solids mass and a target Brix sweep.
Refrigeration Product Cooling and Freezing Load Calculator
Estimate the heat to remove from product when chilling or freezing, then convert it to a refrigeration load in kW and tons of refrigeration.
Weight Percent to Molarity Calculator
Convert a w/w percent assay into molarity, molality and the mass of active chemical in a volume.
Agitator Power and Reynolds Number Calculator
Calculate agitator power from power number, speed and diameter, with Reynolds number and kW per cubic metre.
Cutting Room Efficiency Calculator
Measure marker efficiency and true fabric utilization for a lay, and put a cost on the fabric lost between marker and cut piece.
Corrugated Box Compression Strength (BCT) Calculator
Estimate box compression test (BCT) strength from ECT, board caliper and box footprint with the McKee formula, then convert it to a safe stacking height.
Label Roll Length and Outer Diameter Calculator
Enter label size, gap, core and material thickness to get roll length in metres, the finished roll diameter, and the most labels that fit under a diameter limit.
Ink Coverage and Consumption Calculator
Estimate ink usage and cost for a print run from sheet or web area, average coverage, ink laydown in grams per square metre and a waste allowance.
Corrugated RSC Blank Size and Board Yield Calculator
Converts inside box dimensions into the RSC blank size, then shows blanks per sheet, board yield and board cost per box.
Corrugated RSC Blank Size and Web Trim Waste Calculator
Turn inside box dimensions into a regular slotted container blank, see how many fit across your web and what the trim costs you.
Anilox BCM Ink Film Thickness and Consumption Calculator
Convert anilox volume to expected wet and dry ink film, then estimate ink kilograms and cost for a job.
Paper Roll Length, Weight and Run Time Calculator
Estimate how many metres, square metres and kilograms are on a roll and how long it runs on your press.
Polyethylene Bag Film Weight, Gauge and Cost per 1000 Calculator
Work out film grams per bag, bags per kilogram, film yield and cost per 1000 bags for a given gauge and size.
Print Job Makeready, Spoilage and Overs Calculator
Find how many sheets to feed to deliver a good quantity after makeready, running spoilage and postpress waste.
Customer Lead Time Quote Calculator
Estimate the lead time to quote a customer from queue load, setup, run time, material wait, outside processing, transit and a safety buffer.
Plant Capacity Expansion Calculator
Projects future demand, compares it with machine capacity at your target utilization and tells you how many machines to add and what they cost.
OEE Gain Capacity Release vs Capex Calculator
Convert an OEE improvement into extra units, extra margin and avoided capital for a new line, so you can compare improvement with expansion.
Third Shift Addition Economics Calculator
Tests whether adding another shift earns its keep once crew cost, shift differential and fixed overhead are counted, and shows break-even utilization.
Bottleneck Throughput Gain Investment Payback Calculator
Shows how much more you can sell and how fast an investment pays back when a constraint is relieved, capped by the next constraint and by demand.
Overtime vs New Hire Break-even Calculator
Compares chronic overtime, including fatigue-related productivity loss, with the loaded cost of hiring and shows the weekly hours where hiring wins.
Plant Floor Space Requirement Calculator
Rough-cut floor area estimate for a new line or plant from machine count, clearance factor, pallet storage, support space and growth margin.
Production Capacity Calculator
Calculate machine and line capacity from machines, cycle times, shifts and OEE. Finds the bottleneck work center and shows annual output, utilization and shifts needed.
Sheet Metal Part Cost Calculator
Calculates the price of a cut and bent sheet metal part from material weight, utilization, cutting and bending time, finishing, setup and markup, and shows price per square foot.
Sheet Metal Part Cost Estimator
Estimate the cost and quote price of a laser cut and bent sheet metal part from blank size, material, cutting, bending, finishing and margin.
Sheet Metal Calculation Formulas and Calculator
One calculator for the common sheet metal formulas: flat pattern length, bend allowance and deduction, blank area and weight, and punching force.
Reference tables
Job Shop ERP Glossary Reference
Plain-language definitions of job shop terms, with where each one shows up in ERP data.
Manufacturing KPI Formula Reference
A searchable lookup table of the formulas behind common manufacturing and ERP KPIs, with units and typical data sources.
Seven Wastes of Lean (Muda, Mura, Muri) Reference Table
A searchable lookup of the classic wastes with floor examples, the ERP data that exposes each one, and the usual countermeasure.
Lean Manufacturing Japanese Terms Glossary
A searchable list of common lean and Toyota Production System terms with plain English meaning and where each is used.
CNC G-Code Reference Table
A searchable table of common G-codes for milling and turning with their function, group and practical notes.
CNC M-Code Reference Table
A searchable table of common CNC M-codes for spindle, coolant, tool change, program control and subprograms, with practical notes.
Tap Drill Size Chart (UNC, UNF and Metric Coarse/Fine)
Look up the standard tap drill for common inch and metric threads, with pitch, and export the chart for the shop floor.
ISO Material Groups for Cutting Tools (P M K N S H) Reference
Map common workpiece materials to the ISO P, M, K, N, S and H groups used on carbide insert and end mill catalogs.
Fanuc Macro B System Variables Reference
A lookup table of widely used Fanuc Custom Macro B variable numbers for offsets, positions, timers and alarms.
Tap Drill Size Chart (Metric, UNC, UNF)
Searchable tap drill chart for common metric coarse, metric fine, UNC and UNF sizes with the standard drill and its diameter in mm.
Thread Pitch Chart (Metric, UNC, UNF)
Reference of thread pitch in mm, threads per inch and approximate thread depth for common metric, UNC and UNF sizes.
ISO Turning Insert Designation Code Reference
Decode the letters in an indexable insert name such as CNMG 120408: shape, clearance angle, hole type. Searchable and exportable.
NPT and BSP Pipe Thread TPI and Diameter Reference
Pipe thread sizes with TPI, pitch in mm and outside diameter for NPT and BSP (G) threads, so you stop mixing them up.
Letter Size Drill Chart A to Z with mm Equivalents
Letter drills A through Z with decimal inch and millimetre diameters, ready to search, print or export.
Sheet Metal Gauge Thickness Chart
A searchable gauge-to-thickness lookup for carbon steel, galvanized steel, stainless steel and aluminum, in inches and millimeters.
Thermoplastic Resin Processing Temperature and Shrinkage Reference
Typical processing windows, drying needs and shrinkage ranges for common injection molding resins, in a searchable table.
Cast Iron and Steel Casting Grades ASTM Reference
Look up ASTM A48, A536, A27, A216, A351, A148 and A897 casting grades with minimum tensile and yield values in ksi and MPa.
Forging Temperature Ranges by Material Reference
Searchable guide of typical hot forging start and finish temperatures in Celsius and Fahrenheit for common steels and non-ferrous alloys.
Steel Heat Treatment Processes Reference
Quick lookup of common heat treatment processes with typical temperature ranges, cooling method and what each one is used for.
Manufacturing Operating Rhythm and Meeting Cadence Reference
A lookup table of the standard meeting cadence for a manufacturing plant, from the shift start huddle to the annual strategy review, with owners, inputs and outputs.
Manufacturing Process Types and Product-Process Matrix Reference
Compare project, job shop, batch, cell, repetitive, assembly line and continuous processes by volume, variety, layout, planning approach and typical ERP setup.
Injection Molding Process Values and Formulas Reference
Searchable reference of key injection molding parameters, formulas and typical ranges, including clamp tonnage, pressure, cooling time, drying and shrinkage, exportable to PDF.
Code and query generators
Thread Milling G-Code Generator
Fill in thread size, pitch, tool path radius and feed to generate a Fanuc-style helical thread milling program for an internal right-hand thread.
Fanuc G76 Threading Cycle Code Generator
Fill in thread size, pitch, depth and length and get a Fanuc style G76 two-line multi-pass threading block with comments.
Fanuc G83 Peck Drilling Cycle Code Generator
Generate a G83 deep hole peck drilling block with tool call, coolant, R plane and cancel, ready to paste into a program.
Checklists
Supply Chain Resilience Checklist
A 30-point audit across sourcing, buffers, demand visibility, ERP data quality, and disruption response, with the highest-risk items flagged as critical.
China Manufacturing Plant ERP Rollout Checklist
A rollout checklist for a new or replacement ERP in a Chinese factory, from governance and shop floor to tax and hypercare.
5S Audit Checklist
A 30-point 5S audit covering Sort, Set in Order, Shine, Standardize and Sustain, with scoring you can export.
Gemba Walk Checklist
A 28-point gemba walk checklist covering safety, quality, flow, standard work and people, with an exportable result.
Lathe Chatter Troubleshooting Checklist
A step-by-step checklist to find and fix chatter, grouped by workholding, tooling, cutting parameters and machine condition.
Internal Turning and Boring Bar Setup Checklist
A practical checklist for setting up boring bars on CNC lathes, to cut chatter, scrap and crashed tools.
Plant Manager First 90 Days Checklist
A structured list for new plant managers covering safety, people, customers, performance data, systems and early priorities.
Plant Expansion Project Readiness Checklist
A gate review checklist covering demand case, capacity, site and utilities, permits, workforce and ERP readiness before approving a plant or line expansion.
Manufacturing Plant Startup and Site Visit Checklist
A tickable checklist for starting up a new plant or production line, with a second section for plant visits and supplier site assessments. Export your results.
CNC Machine Operator Daily Checklist (PDF)
A printable daily start-up, pre-use inspection and safety checklist for CNC mills and lathes, covering lubrication, coolant, tools, guards and E-stops.
Assessments
MRP Nervousness Assessment
A 10-question diagnostic that scores how badly your MRP plan churns between runs - and pinpoints which levers will stabilize it.
Production Scheduling Maturity Assessment
Score your scheduling practice across method, capacity logic, adherence, and shop floor feedback - and see the staged path to finite-capacity scheduling.
Shop Floor Digitization Scorecard
A 10-question scorecard measuring how much of your shop floor still runs on paper - and which digitization gaps are costing you the most.
Supplier Risk Scorecard
Score your supply base across financial, sourcing, quality, cyber, and continuity risk in eleven questions, and get a banded action plan for the gaps you find.
S&OP Maturity Assessment
Assess your sales and operations planning process across cadence, data quality, scenario capability, and accountability, and get a staged roadmap to the next maturity level.
Digital Twin Feasibility Assessment
Score your readiness for a digital twin project across data models, sensor coverage, historian maturity, simulation skills, and executive sponsorship.
Plant Connectivity Readiness Assessment
Score your plant network across segmentation, wireless coverage, legacy PLC protocols, OT security, and ERP integration before starting an Industry 4.0 project.
Industry 4.0 Maturity Assessment
Score your plant's Industry 4.0 maturity across digital strategy, data infrastructure, automation, analytics, workforce skills, and systems integration.
Supply Chain Visibility Assessment
Score your organization's visibility across tier-1 and sub-tier suppliers, inventory, demand signals, and disruption alerting in about five minutes.
Demand Planning Maturity Assessment
Score your demand planning maturity across forecasting method, accuracy tracking, S&OP process, and data granularity in about five minutes.
Lean Manufacturing Maturity Self-Assessment
Ten questions that place your plant on a simple lean maturity scale and suggest where to focus next.
Africa Factory Power Resilience Assessment
Score your plant on backup power, critical load planning, maintenance and IT protection to see how exposed you are to grid outages.
Manufacturing Change Readiness Assessment
Ten questions on sponsorship, capacity, data, skills and past change history, scored into a readiness band with recommended actions.