On-Prem AIFree calculatorPDF, Excel, Word exportExact Macola

Macola AI Assistant Sizing and Value Calculator

This free calculator estimates GPU count, token volume, document index size, hours saved and payback for a private AI assistant on Macola. Change the inputs to match your user base and see the chart for how cost and value scale with users.

Your numbers

users

Licensed or named Macola users who could use the assistant.

40 %

Percent of named users who ask at least one question per day.

questions
tokens

Include retrieved context. Typical range 1000 to 3000.

documents
pages
minutes

Measure in a pilot; this is the most uncertain input.

per hour
per GPU per month

Amortised purchase plus power, space and support, or a private cloud rate.

tokens/s

Assumption: depends on model, quantisation and batching. Measure on your hardware.

once

Integration, indexing, testing and rollout effort.

Your results

GPUs needed
1
Larger of the GPUs needed to hold the model and load divided by throughput per GPU.
Net monthly value
$4,061
Active users per day
24
Questions per day
144
Tokens per day
259,200
Questions per day times average tokens per question.
Peak concurrent requests
1
Assumes 25% of daily questions in the busiest hour and 20 seconds per answer.
Peak load
40
Tokens per second: the larger of 40 tokens/s per concurrent stream and busy-hour token volume.
GPUs with a standby replica
2
Adds one more model replica for resilience.
Vector index size
0.96
GB, assuming 2 chunks per page and about 6 KB per chunk including vectors and metadata.
Hours saved per month
202 hrs
21 working days per month.
Monthly value
$7,661
Monthly GPU cost (with standby)
$3,600
Simple payback
11.1 months
Setup cost divided by net monthly value. Zero means value does not cover running cost.

Planning estimate. Throughput, minutes saved and token counts vary widely; measure them in a pilot before committing budget.

Free, optional. Reopen it on any device.
Save results:

Monthly value vs GPU cost by named users

Sweeps Named users from 10 to 1000, holding your other inputs fixed.

Optional Macola pilot sizing

We can help turn these estimates into a measured pilot on your Macola data.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the calculator

Enter named Macola users and the share who actually use the assistant on a typical day, then how many questions each asks and how many tokens a question and answer consume together. Add the number and length of documents you plan to index, the minutes each answer saves and your loaded hourly cost. The outputs give peak concurrent requests, a GPU estimate with and without a standby, the index size and a simple monthly value.

Formulas and assumptions

Questions per day are active users times questions each. The busiest hour is assumed to carry 25 percent of daily questions and each answer to take 20 seconds, which sets peak concurrency. Load in tokens per second is the larger of concurrency times 40 tokens per second per stream and busy-hour tokens divided by 3600. GPUs needed are the larger of the GPUs required to hold the model and load divided by the throughput per GPU you enter. Index size assumes 2 chunks per page and about 6 KB per chunk including vectors and metadata. A month is 21 working days.

Reading the result

For a Macola-sized user base the GPU count is usually driven by the model's memory footprint, not by user load, so the estimate often lands at one or two cards. Value depends almost entirely on minutes saved per question, which is the number to test with a pilot. If payback shows zero, the monthly value does not cover the monthly GPU cost under your inputs.

Frequently Asked Questions

Why is the GPU count so low?

A few dozen active users generate light load. The count is usually set by how many GPUs are needed to hold the model, so a single card or a pair is common. Larger models or many more users change this.

What throughput per GPU should I enter?

It depends on model, quantisation and batching. A figure from 800 to 2500 aggregate tokens per second is a plausible range for mid-size models, but measure on your own hardware before committing.

How reliable is minutes saved?

It is the least certain input. Use a small pilot to time how long a lookup takes today versus with the assistant, then enter the measured average.

Does it include setup costs?

Payback uses the one-time setup cost you enter, divided by monthly value minus GPU running cost. It excludes licences you may already own and staff time beyond what you include in setup.

If you want these numbers tested against your real Macola usage, Netray can help run a small pilot. The calculator is free either way.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

AI on your ERP

Integrations

Software