Other ERPsFree templatePDF, Excel, Word exportExact Macola

Macola Private AI Layer Blueprint Generator

This free generator produces a shareable architecture plan for adding a private AI assistant to Macola on SQL Server. Fill in your environment and constraints, then export the plan to PDF or Word for your IT lead and reseller.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

Macola Private AI Layer Blueprint Generator

Private AI Layer Architecture Plan: Macola

Company: Acme Components Inc System and version: Macola, Macola 10.x Database: SQL Server 2019 or later Hosting: On-prem server Named users: 60 Sites or plants: 1 GPU: 1-2 x 48 GB class GPUs Target go-live: 2027-03-31

Context and objectives

Acme Components Inc wants an AI assistant over its Macola data and documents that runs inside its own environment (On-prem server). The assistant must answer questions in natural language, show the data behind each answer, respect existing user permissions and remain read-only until approvals are in place.

Main use cases: Order status and shipping dates for customer service. Item availability and open PO lookups for purchasing. Questions across vendor certs and quotes stored on the file share.

Data boundaries

The following data must never leave the site and must stay out of any external service: Customer pricing and contract terms. Cost and margin fields. Export-controlled drawings and quality records.

All processing, indexing and model inference run on infrastructure controlled by Acme Components Inc.

Components

LayerDesignNotes for Acme Components Inc
Data access pathRead-only SQL Server reporting copy of each Macola company database, with an ai schema of curated views over item, order, PO, customer and vendor tablesTable names carry module prefixes and an _sql suffix; confirm columns on Acme Components Inc's Macola 10.x install
Retrieval indexVector index of drawings, POs, certs and SOPs, each chunk tagged with Macola item, order or vendor keyBuilt from the file shares Acme Components Inc already uses
Model servingOpen-weight model on vLLM or Ollama, sized to 1-2 x 48 GB class GPUsHost has no outbound route when hosting is On-prem server
Tool serverMCP or REST wrapper offering typed read actions (order status, item availability, open POs)No free SQL against base tables
Identity and permissionsMap each Macola user and company access to the assistant session; default deny on cost and marginMacola security is application-level, so it must be mirrored
AuditAppend-only log of question, user, tool calls, views and row countsReviewed weekly during phase 1

Security controls

ControlImplementationDriven by
Network isolationModel, index and tool server in a dedicated zone with no outbound internet routeHosting: On-prem server
Data minimisationOnly approved views and document sets are exposed; excluded data is never indexedData that must never leave the site
Least privilegeRead-only service identity; per-user filtering of tool calls60 named users
Model governanceOpen-weight model pinned by version, weights checksummed, updates via change controlGPU: 1-2 x 48 GB class GPUs
Audit and retentionAppend-only log of questions, tools, sources and users with an agreed retention periodInternal audit and compliance
Write-back controlNo writes in phases 1 and 2; later writes only through supported APIs with named approversRisk appetite of Acme Components Inc

Rollout plan

PhaseScopeExit criteria
1. Read-only questionsApproved views and documents for a pilot group; answers show their sourcesAccuracy sampled by owners; no permission leaks in review; log reviewed weekly
2. DraftsAssistant drafts emails, summaries and suggested changes for a person to copyUsers edit less over time; no unreviewed output leaves the system
3. Approved actionsSelected actions executed through supported APIs after human approvalApprover named per action; rollback tested; go-live target 2027-03-31

Open questions for IT

1. How fresh must answers be: real time, minutes or daily? 2. Which companies, databases or libraries are in scope across 1 site(s)? 3. Who owns document permissions and how are they mapped to Macola roles? 4. Which customisations or custom tables must be exposed? 5. What is the backup, monitoring and patching plan for the GPU host? 6. Who approves any write-back and through which supported interface? 7. Is a pilot group of 10 to 20 users available for phase 1?

Approvals

Prepared by / Date
IT lead / Date
Security / compliance / Date
Business sponsor / Date

Starting-point document, not a final design. Confirm table names, interfaces and security behaviour for your exact release with your vendor or implementation partner. Nothing you enter leaves your browser.

Optional Macola architecture review

Send us your generated plan and we will comment on the data path, permissions and rollout for your Macola setup.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the blueprint

Start with the fields that change the design most: hosting, database engine, the data that must never leave the site and the GPU you have. Write the use cases as real questions people ask today, such as which orders are late for a customer or what is on hand for an item across locations. The generated plan then maps these to a reporting copy, curated views, a retrieval index and a local model, with a rollout table you can paste into a project plan.

What Macola specifics it assumes

Macola 10 runs on SQL Server and keeps each company in its own database. The plan therefore calls for a read-only copy per company, a dedicated schema of views, and a service login limited to SELECT. Because Macola enforces its security in the application, the plan mirrors user and company access in the tool layer instead of trusting database logins alone. Writes are excluded from early phases and, later, use supported import or SDK routes only.

Reading the output and common mistakes

Treat the open questions as the agenda for your IT meeting: how fresh must data be, who owns document permissions, and who approves write-back. Common mistakes are querying production, covering only one company database, skipping an audit log and indexing documents without the Macola key. Replace the generic wording with names from your own environment before circulating the plan.

Frequently Asked Questions

Does this plan send Macola data to a cloud?

No. The plan keeps the reporting copy, retrieval index and open-weight model inside your network, including an air-gapped option. You choose the hosting model in the form.

Do I need Macola 10 on SQL Server?

The plan assumes SQL Server because it allows a readable copy and curated views. Progress-based releases need an export step into a reporting database, which the open questions section flags.

Is the output a finished design?

It is a structured starting point. Table names, customisations and security rules must be confirmed against your own Macola database with your reseller or administrator.

Can I edit the generated document?

Yes. Export to Word or PDF and edit freely. Nothing is stored on our side unless you choose to request the optional review.

If you would like a second pair of eyes on this plan for your Macola environment, Netray can review it and the views it implies. The tool works fully without us.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

AI on your ERP

Integrations

Software