Mexico Fully Loaded Labor Cost Per Hour Calculator
A Mexican operator's daily wage is only part of what they cost. This calculator adds aguinaldo, the vacation premium and employer charges to give a loaded annual and hourly figure you can use for quoting and for a fair comparison with other countries.
Your numbers
Base pay per calendar day for the operator.
The legal minimum is 15 days of pay; many employers give more.
Statutory vacation grows with seniority.
At least 25 percent of vacation pay.
Approximate combined IMSS, INFONAVIT, SAR and state payroll tax. Use your payroll provider's actual rate.
Your results
Estimate. Real employer charges depend on integrated daily wage (SDI), risk class, wage caps and state tax. Profit-sharing (PTU) is not included. Verify with your payroll provider.
Loaded hourly cost vs daily wage
Sweeps Daily wage (salario diario) from 250 to 900, holding your other inputs fixed.
Tie labor rates to your ERP
Optional: compare standard rates to payroll actuals by cost center.
Optional. The tool and every export work without this. No spam.
How to use it
Enter the daily wage in pesos and the benefits your plant actually provides. The burden percentage should come from your payroll provider, since it depends on your IMSS risk class and wage level. Set productive hours after holidays, vacation and absence, then enter the exchange rate. The result is the annual cost in pesos and dollars and the cost per productive hour.
- Use 365 days for base pay because rest days are paid within the daily wage.
- Use productive hours, not contract hours, for standard costing.
- Re-run for each job grade and shift.
The method
Annual base pay is the daily wage times 365. Aguinaldo is the daily wage times the number of days owed, with a legal minimum of fifteen. Vacation premium is the daily wage times vacation days times the premium percentage. Their sum is the pay base to which employer social security, housing and savings contributions and other benefits are applied as a percentage. Dividing by the exchange rate gives dollars, and dividing by productive hours gives the rate per hour.
Worked example
At 450 pesos a day, base pay is 164,250 pesos, aguinaldo 6,750 and vacation premium 1,575, so pay is 172,575. With 28 percent burden and 8 percent other benefits the loaded cost is 234,702 pesos, or about 13,039 dollars at 18 pesos per dollar. Over 2,200 productive hours that is roughly 5.93 dollars an hour.
Common mistakes
Plants frequently quote the wage as the cost, forget that contributions apply to an integrated wage that already includes aguinaldo and premium, or ignore profit sharing and turnover. High turnover adds hiring and training costs that this tool does not model. Link the result to your ERP labor rate and update it each January when minimum wages change.
Frequently Asked Questions
Is the burden percentage accurate for my plant?
It is an approximation. The true rate depends on risk class, wage band and state payroll tax. Take the actual employer cost from a payroll run and divide by gross pay to get a real percentage for your plant.
Does this include profit sharing?
No. PTU is based on taxable profit and varies each year, so add an accrual to the other benefits percentage if it applies to your entity. Some structures such as shelter services handle it differently.
Why 365 days for base pay?
In Mexico the daily wage is paid for every day of the year including rest days, so annual base pay is the daily wage multiplied by 365. Monthly payroll is generally 30 or 30.4 days of pay.
Should I use productive hours?
Yes for costing. After holidays, vacation, sick days and training, productive hours are lower than paid hours, which raises the cost per productive hour compared with a simple division.
Netray can compare standard labor rates in your ERP with actual payroll cost by cost center and flag drift.
Related Tools
Mexico Peso FX Exposure Plant Cost Calculator
Shows what a stronger or weaker peso does to the dollar cost of payroll and local spend at a Mexican plant, with a simple hedge ratio.
Costing & FinanceNearshoring Break-Even Volume and Payback Calculator
Compares your current landed cost per unit with a nearshore cost, adds one-time transfer cost and extra fixed overhead, and returns break-even volume and payback months.
Supply Chain & InventoryMexico to US Cross-Border Truckload Cost Per Unit Calculator
Builds the all-in cost of a cross-border truckload and divides it by units on the trailer, so you can compare it with ocean freight from Asia.
Supply Chain & InventoryNearshore vs Asia Pipeline Inventory Carrying Cost Calculator
Prices the inventory sitting in transit and in safety stock on a nearshore lane versus an Asian lane, using transit time, demand variability and carrying rate.
More Costing & Finance tools
See all- SAP QM Inspection Effort and Cost Calculator
- SAP Standard Cost Estimate BOM Rollup Calculator
- Legacy ERP Retirement Cost and Payback Calculator
- JD Edwards World Month-End Close Procedure Template
- Distributor Customer Credit Application Template
- Distributor Customer Profitability Worksheet
- Distributor GMROI and Inventory Turns Calculator
- Vendor Early Pay Discount Worksheet
- SyteLine Cost Rollup Variance Calculator
Keep exploring
Free tools
- Mexico Labor Cost Burden WorksheetBuild a loaded monthly labor cost per role for a Mexican plant including aguinaldo, vacation premium and employer charges.
- Mexico Maquiladora Monthly Cost WorksheetBudget the monthly and annual operating cost of a Mexican plant line by line: headcount, shelter fees, rent, utilities, customs brokerage and freight.
- Machine Hour Rate Build-Up WorksheetCalculate a fully loaded machine hour rate per machine from depreciation, power, maintenance, tooling and floor space.