SyteLine Cost Rollup Variance Calculator
After a cost roll, the standard changes and so does the value of everything on the shelf. Then every completed job lands either above or below the new standard. This calculator shows both effects in one place: the variance by cost element and the revaluation of on-hand stock.
Your numbers
From the rolled standard cost of the item.
Fixed plus variable overhead absorbed per unit.
Standard before the cost roll.
Your results
Simplified per-unit comparison for planning and training. Your SyteLine variance accounts, overhead absorption and posting rules may split variances differently, so reconcile to your ledger before booking anything.
Total job variance by quantity completed
Sweeps Quantity completed from 0 to 2000, holding your other inputs fixed.
Variance explanations from your data
Optional: see how job cost variances can be explained by item and element directly from your SyteLine data.
Optional. The tool and every export work without this. No spam.
How to use the calculator
Enter the rolled standard per unit for material, labor and overhead, then the actual cost per unit from a completed job. Set the quantity completed to scale the variance to a job total. To see what a cost roll did to inventory, enter the prior standard and the on-hand quantity at the time of the roll. The chart sweeps the quantity so you can see how a small unit variance becomes a large dollar variance on bigger runs.
The formulas behind it
Each element variance is actual per unit less standard per unit, multiplied by quantity. Total variance is the sum of the three. A positive result is unfavorable, meaning you spent more than standard. Percent variance divides the unit difference by the new standard cost. Revaluation is the new standard less the prior standard, times the quantity on hand at the roll, which is the gain or loss recognized when inventory is restated. This is a simplified view: price and usage splits, scrap and overhead rate variances need more detail than one per-unit figure.
- Material variance = (actual material - standard material) x quantity.
- Revaluation = (new standard - prior standard) x on hand.
- Positive variance is unfavorable.
Reading results and common mistakes
A persistent material variance usually points at stale purchase prices in the standard or at scrap and yield assumptions. A labor variance suggests routing times that no longer match the floor. Overhead variances are often an absorption issue rather than a spending issue. The most common mistake is rolling costs without reviewing the revaluation first, which surprises finance at period end. Another is comparing one job to a standard that was rolled with outdated routings, which tells you the standard is wrong, not that the floor is.
- Review revaluation before posting a new standard.
- Update routings before the roll, not after.
- Investigate variances by element, not only in total.
Frequently Asked Questions
What is a cost rollup in SyteLine?
A cost rollup calculates an item's standard cost by summing the cost of its components, operations and overhead through the bill of materials and routing. The result becomes the standard against which actual job costs and receipts are compared.
Is a positive variance good or bad?
In this calculator a positive variance means actual cost exceeded standard, which is unfavorable. Some reports use the opposite sign convention, so check the sign used in your own ledger accounts before comparing numbers.
Why does inventory value change after a cost roll?
Stock is valued at standard cost. When the roll changes the standard, the on-hand quantity is revalued at the new figure, and the difference is posted according to your accounting setup. Review it before committing the new standard.
Does this replace the SyteLine variance reports?
No. It is a quick what-if and training tool. Your system reports reflect your posting rules, overhead absorption and price versus usage splits. Use this to understand and sanity check numbers, then reconcile to the official reports.
Netray can pull completed job cost and standard cost data from SyteLine and produce a variance explanation by item, with the query shown so your cost team can verify it.
Related Tools
Product Cost Rollup Calculator
Roll material, direct labor, applied overhead, machine time, and scrap loss into a single defensible unit cost the way your ERP cost rollup should.
Costing & FinanceSyteLine Month End Close Checklist
A step by step month end checklist for SyteLine users covering operational cut-off, subledger reconciliation, WIP, inventory and the general ledger.
Infor SyteLineSyteLine Item Import Worksheet
A staging sheet for item master data with computed first-buy value, ready to clean in the browser and export to Excel or CSV for loading.
Infor SyteLineSyteLine Job and Order Status Codes Reference
Look up what Planned, Firm Planned, Released, Stopped, Complete and the other SyteLine status codes mean and how they behave in planning and shipping.
More Costing & Finance tools
See all- SAP QM Inspection Effort and Cost Calculator
- SAP Standard Cost Estimate BOM Rollup Calculator
- Legacy ERP Retirement Cost and Payback Calculator
- JD Edwards World Month-End Close Procedure Template
- Distributor Customer Credit Application Template
- Distributor Customer Profitability Worksheet
- Distributor GMROI and Inventory Turns Calculator
- Vendor Early Pay Discount Worksheet
- SyteLine Inventory Carrying Cost and Turns Calculator
New to Infor SyteLine? Start with the Infor SyteLine guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.
Keep exploring
Free tools
- Standard Cost Change Request TemplateDocument why a standard cost is changing, the inventory revaluation impact and who approved it before the roll-up runs.
- Product Cost Rollup CalculatorRoll material, direct labor, applied overhead, machine time, and scrap loss into a single defensible unit cost the way your ERP cost rollup should.
- Direct Labor Rate and Efficiency Variance CalculatorBreak the difference between actual and standard direct labor cost into a rate variance and an efficiency variance.
ERP fixes and how-tos
- How to Run a Cost Rollup in SyteLineRun a SyteLine standard cost rollup: use Simulate mode first, fix variance exceptions from missing routings or zero-cost items, then post new standard costs.
- How to Change an Item's Standard Cost in SyteLineUpdate a SyteLine item's standard cost by hand or through Cost Rollup, then run Recost Inventory to revalue on-hand stock and post the GL variance correctly.
- SyteLine error: no cost record exists for this item at this siteWhy SyteLine blocks a transaction with a missing standard cost or cost element error, and how to fix it via Item Costs, Cost Rollup, and cost effective-dating.
Guides
- How to Fix SyteLine Cost Rollup VariancesDiagnose and resolve cost rollup variances in Infor SyteLine including material, labor, and overhead cost discrepancies with SQL validation queries and BOM audit steps.
- How to Run Cost Rollup in SyteLineComplete guide to running cost rollups in Infor SyteLine. Learn how to calculate rolled-up costs across BOM levels, validate results, and update standard costs.
- How to Configure Standard Costing in SyteLineStep-by-step guide to configuring standard costing in Infor SyteLine CloudSuite Industrial. Set up cost types, material costs, overhead rates, and cost rollup parameters.