Projected Stockout Date and Days of Supply Calculator
When a supplier slips a delivery, the first question is how long you can last. This calculator turns on hand, demand and receipt timing into a stockout date and a shortage quantity.
Your numbers
Your results
Assumes constant daily demand. Use the actual demand profile from your MRP time buckets when demand is lumpy.
Shortage quantity vs receipt arrival day
Sweeps Days until that receipt from 0 to 80, holding your other inputs fixed.
Live shortage view over your ERP
Optional: ask how a read-only stockout projection could run on your own item and supply data.
Optional. The tool and every export work without this. No spam.
How to use it
Enter usable on hand, which should exclude quarantine, held and reserved stock, then average daily demand and the next scheduled receipt. The results show days of supply, when safety stock is breached, and how many days of demand go unserved if the receipt arrives after you run out. Move the receipt day to test a pushed out delivery.
- Use net available stock, not the gross book balance.
- Take demand from the next few weeks, not the annual average.
- Include only receipts with confirmed dates.
The method
Days of supply equals usable stock divided by average daily demand. The safety stock breach day uses stock above the safety level. If the receipt is due after days of supply, the gap is receipt days minus days of supply, and the shortage equals the gap times daily demand. If the receipt arrives in time, cover after receipt is the remaining stock plus the receipt, divided by demand.
Reading the result
With 1,800 units and 60 a day you have 30 days of supply and breach safety stock after about 23 days. A receipt due on day 40 leaves a 10 day gap and a shortage of 600 units. The chart shows the shortage growing linearly once the receipt passes day 30, which gives you a number to take to the supplier or to sales when deciding whether to expedite, substitute or reallocate.
Common mistakes
Planners often use demand averaged over a year when the next month is far heavier. Others include stock in quality hold, or count a receipt that is still only a planned order. Also check allocations: stock reserved to a single order may not be available to the line that is about to run out.
Frequently Asked Questions
What is days of supply?
It is usable inventory divided by average daily demand. It tells you how long current stock lasts if nothing else arrives and demand stays at the assumed rate.
How is it different from inventory turns?
Turns are an annual, aggregate measure of inventory efficiency. Days of supply is a forward looking, item level measure used to prioritize shortages and expedites.
Should safety stock count as available?
For planning it is protected stock, so a breach is a warning. For a true stockout date, it is available until it reaches zero. This tool shows both dates.
What if demand is not constant?
Use the sum of actual gross requirements over the horizon to find when cumulative demand exceeds supply. The result will differ from this average based estimate.
Netray can keep this calculation live over your ERP data and alert planners when projected stockout dates fall inside lead time.
Related Tools
Expedite Cost vs Delay Cost Calculator
Decide whether paying to expedite is cheaper than waiting, using fees, price premium, order value and the daily cost of delay.
Supply Chain & InventorySafety Lead Time from Supplier Variability Calculator
Set safety lead time from the standard deviation of supplier lead time and a target service level, then see the carrying cost of that buffer.
Supply Chain & InventoryMRP Planned Order Release Date Calculator
Back-schedule a planned order from its need date using lead time, safety lead time, receiving and transit, and see whether the release date is already past.
ERP OperationsMRP Planner Exception Workload Calculator
Estimate how many planners you need to work MRP exception messages, based on items, exception rate and handling time.
More Supply Chain & Inventory tools
See all- Oracle Fusion Inventory Turns and Carrying Cost Calculator
- Distribution ERP Fill Rate Calculator
- Distributor Rebate Tracking Worksheet
- Branch Transfer Planning Worksheet
- Distributor Slow-Moving Inventory Review Worksheet
- Distributor Vendor Performance Scorecard Worksheet
- Distributor GMROI Calculator
- Distributor Backorder Cost and Fill Rate Calculator
- EOQ with Vendor Minimum Order Calculator
Keep exploring
Free tools
- Supplier Delay Stockout Exposure CalculatorTest what a late purchase order does to coverage: days short, units short and the expedite quantity needed.
- Stockout Root Cause Report TemplateA structured report to investigate a stockout, classify the cause and assign corrective actions with owners.
- Stockout Cost CalculatorPrice the full annual cost of stockouts across lost margin, expediting, and downstream customer damage, and see what each point of fill rate is worth.
AI on your ERP
- NetSuite Inventory and Demand Planning With AI That Checks Your Reorder LogicAI for NetSuite inventory and demand planning: review reorder points, safety stock, item demand plans and stockouts using SuiteQL on private infrastructure.
- AI for Acumatica Inventory and Purchasing: Stock, Reorder and Vendor Questions AnsweredAI for Acumatica inventory and purchasing: reorder risk, receipts, vendor lead times and stock questions answered in plain English via the REST API, read-only.