NIST 800-171 POA&M Worksheet
A plan of action and milestones, or POA&M, lists each unmet NIST SP 800-171 requirement with an owner, a fix and a date. It is the working document that turns a low score into a funded project. This worksheet adds cost and points so you can prioritise.
| Requirement ID | Family | Weakness / gap | Planned remediation | Owner | Score points recovered | Estimated cost | Effort (hours) | Target date | Status | Points per $1,000 | |
|---|---|---|---|---|---|---|---|---|---|---|---|
1.1111 | |||||||||||
0.3333 | |||||||||||
0.25 | |||||||||||
0.8333 | |||||||||||
1.6667 |
Requirement IDs follow NIST SP 800-171 numbering. Example rows are illustrative. Closed items still need supporting evidence, and a plan of action does not raise your score until the requirement is fully implemented.
Get help sequencing your remediation
Send us your gaps and we will suggest an order based on points, cost and shared tooling.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
Create one row per unmet requirement from your self-assessment. Write the weakness in plain words, the planned remediation, an owner, a target date and an estimate of cost and effort. Enter the SPRS points the fix will recover. The sheet computes points per thousand dollars so you can spot cheap wins, and the totals show the budget and effort needed to reach your score target.
Prioritising what to fix first
Start with items that recover the most points for the least cost, especially five-point requirements such as multifactor authentication. Group fixes that share a tool or project, since one logging platform can close several audit requirements at once. Items that are blocked by procurement or architecture decisions should be visible in the status column so leadership can unblock them.
- Sort by points per $1,000 to find quick wins
- Group related controls into shared projects
- Keep blocked items visible with an escalation owner
- Retain evidence for every closed item
POA&M and your SSP
The POA&M works alongside the system security plan. The plan describes how each requirement is met today, and the POA&M describes what is not yet met and how you will close it. Keep them consistent: a requirement marked implemented in the plan should not also appear as open here. Update both after each remediation sprint and again before you post a new score.
Common mistakes
Frequent problems are vague fixes with no owner, dates that never move because nobody reviews the list, and closing items without evidence. Some teams also count planned work toward their score, which the scoring method does not allow. Review the sheet monthly, record changes of date with a reason, and keep cost estimates honest so budget requests are credible.
Frequently Asked Questions
What is a POA&M?
A plan of action and milestones is a document that lists weaknesses, the actions planned to correct them, responsible people, resources and target dates. For NIST SP 800-171 it tracks requirements not yet fully implemented.
Does a POA&M count as implementation?
No. Under the DoD scoring method a requirement is credited only when it is implemented. A POA&M shows intent and accountability but does not raise your score until the work is complete and evidenced.
How often should I update it?
Review it at least monthly and after any remediation milestone. Update dates, status and cost as facts change, and keep a record of why dates moved so assessors can see the plan is actively managed.
How is this related to CMMC?
CMMC Level 2 assessments look at the same 110 NIST SP 800-171 requirements, and limited use of POA&Ms may be permitted for certain items under the rules. Confirm current CMMC program rules for which items may stay open.
If remediation evidence is scattered across systems, Netray can help collect configuration and log evidence privately on-prem to support closing items.
Related Tools
NIST 800-171 SPRS Score Calculator
Calculate your SPRS score from the DoD Assessment Methodology: start at 110 and subtract the weight of each unmet NIST SP 800-171 requirement.
Aerospace & DefenseCUI Marking Checklist for DoD Contractors
A practical checklist for marking, handling, storing, transmitting and destroying controlled unclassified information in contractor environments.
Compliance & ContractsDFARS 252.204-7012 Cyber Incident Report Template
A fill-in internal record to collect the details you need for a DFARS 7012 cyber incident report: timeline, systems, CUI impact, preservation and notifications.
Aerospace & DefenseCMMC 2.0 Level 2 Readiness Assessment
Answer 10 questions mapped to NIST SP 800-171 control families and get an instant CMMC Level 2 readiness score with prioritized next steps.
More Aerospace & Defense tools
See all- ITAR Compliance Checklist for Manufacturers
- DFARS 252.204-7012 Compliance Self-Assessment
- AS9100 Audit Readiness Checklist
- Export Control Screening Checklist
- Defense Contractor AI Readiness Assessment
- Counterfeit Parts Risk Assessment (AS5553)
- Aerospace Supplier Scorecard
- First Article Inspection (AS9102) Checklist
- Government Contract Compliance Cost Calculator
Keep exploring
Free tools
- CMMC POA&M (Plan of Action and Milestones) WorksheetAn editable POA&M tracker for NIST 800-171 gaps with owner, status, target date, estimated cost and a running cost total.
- NIST 800-171 SPRS Score CalculatorCalculate your SPRS score from the DoD Assessment Methodology: start at 110 and subtract the weight of each unmet NIST SP 800-171 requirement.
- Plan of Action and Milestones (POA&M) TemplateFill in a security requirement gap and get a formatted POA&M document with weakness, risk, resources, milestones and sign-off lines.
Guides
- How to Improve Your SPRS Score as a Small ManufacturerHow to calculate and improve your SPRS score as a small manufacturer: the NIST 800-171 scoring method, high-value controls to fix first, and common mistakes.
- Building a CUI Enclave for Defense ManufacturingHow to build a CUI enclave for defense manufacturing: scope NIST SP 800-171 and CMMC boundaries, isolate ERP and engineering data, and cut assessment cost.
- On-Prem AI for CUI in Small ManufacturersOn-prem AI for CUI: how small defense manufacturers run an LLM on their own GPUs inside the NIST 800-171 boundary, with hardware sizing and real trade-offs.