Free Aerospace & Defense tools

95 templates, calculators, worksheets and reference tables. Each runs in your browser and exports to PDF, Excel, Word or CSV.

Templates and forms

AS9102 Form 1 Part Number Accountability Template

Generate the Form 1 header page of an AS9102 first article inspection report with part, drawing, FAI type and approval blocks.

AS9102 Form 2 Product Accountability Template

Fill in AS9102 Form 2 style product accountability records for raw materials, special processes and functional tests, then export a PDF or Word file.

Aerospace Material Review Board Disposition Template

Document an MRB decision with nonconformance details, engineering rationale, customer approval status and disposition, then export a PDF.

Aerospace MRB Nonconformance Disposition Record Template

A fill-in record for the material review board: nonconformance details, disposition, customer approval status and sign-offs.

AS9100 Process Turtle Diagram Template

Fill-in turtle diagram for one QMS process, covering inputs, outputs, resources, methods, competence and performance measures.

Material Review Board MRB Disposition Template

MRB record with engineering rationale, disposition, customer approval and cost impact for nonconforming material.

Defense Electronics First Article Inspection Template

A fill-in first article report for a PCB or box-level assembly with sections for configuration, parts, process, test and approvals. Exports to PDF or Word.

MRO Work Package Template

A fill-in work package cover and index with scope, task card list, parts, tooling, resources and sign-off blocks for an aircraft maintenance visit.

MRO Incoming Inspection and Receiving Report Template

Record what arrived, its paperwork, visible condition and disposition on one controlled receiving report for aircraft parts and components.

MRO Technician Task Card Template

Build a printable task card with the maintenance reference, tooling, parts, steps and inspection sign-offs for a single job.

MRO Quarantine and Unserviceable Parts Tag Template

Create a clear tag and record for parts held as unserviceable, suspect or in quarantine, with reason and disposition.

MRO Component Repair Quote Template

Produce a clear component repair quote with scope, price basis, turn time, warranty and beyond-economic-repair terms.

MRO Component Repair Order Request Template

Fill in a clean repair request covering part identity, history, removal reason, requested scope and release documents, then export to PDF or Word.

AS9100 Document Control Procedure and Template Pack

One editable AS9100 pack: document control procedure, process interaction table, KPI list, audit plan and schedule, with sample wording you can adapt.

AS9102 First Article Inspection Report (FAIR) Template

A fill-in AS9102 FAIR with Forms 1, 2 and 3, pre-filled with a sample machined bracket so you can see how each field and characteristic row is completed.

Nadcap AC7114 Self-Audit Checklist Template

A self-audit report template for Nadcap nondestructive testing, plus a plain explanation of where AC7114 checklists live and how audits use them.

AS9100 FAI Template (AS9102 Forms 1, 2 and 3) with ERP Data Mapping

One document with the three AS9102 form structures, a filled example for a machined bracket, and a table showing where each field comes from in your ERP.

AS9100D Risk Assessment, Organizational Context and Quality Objectives Template

One fillable document for AS9100D clauses 4.1, 4.2, 6.1 and 6.2: organizational context, interested parties, a scored risk assessment and measurable quality objectives.

CMMC Level 2 SSP Example for a Machine Shop

A System Security Plan template pre-filled with a realistic machine shop example, including the ERP system and the CUI boundary. Edit and export.

AS9100 Work Instruction Template

Build a controlled work instruction with revision history, step-by-step operations, inspection points, special process flags and approval signatures.

AS9100 Audit Report and Management Review Example

A completed sample AS9100D internal audit report with findings plus sample management review minutes, editable and exportable as your own template.

Worksheets

AS9102 Form 3 Characteristic Accountability Worksheet

Record each ballooned characteristic with nominal, tolerance, actual and automatic pass or fail, then export to Excel.

Aerospace Key Characteristics Worksheet

List key characteristics, their risk, control method and capability so variation is managed where it matters most.

Nadcap Special Process Supplier Approval Tracker

Editable worksheet for tracking special process suppliers, their Nadcap or customer approvals, scope and days to expiry.

Aerospace Delta FAI Trigger Worksheet

Score each change for design, process, supplier, tooling and location impact to decide whether a full or partial delta FAI is needed.

Aerospace Internal Audit Programme Planner Worksheet

Plan which processes you audit, how often and for how many hours, and see total annual auditor workload.

NIST 800-171 POA&M Worksheet

An editable plan of action and milestones for NIST SP 800-171 gaps, with owner, cost, due date, status and the SPRS points each fix recovers.

DFARS Flowdown Subcontractor Risk Tracker

An editable worksheet that records CUI exposure, flowdown status and cyber maturity per subcontractor and scores risk so you know whom to chase first.

DMSMS Obsolescence Management Worksheet

A part-by-part obsolescence tracker that computes months of stock cover and a likelihood-by-impact risk score so you can see which parts need a last-time buy or redesign first.

MIL-PRF Component Qualification Tracking Worksheet

Track each qualified component against its MIL-PRF specification, QPL or QML status, quality level, source type, lot date code and cost.

MRO Shelf Life Tracking Worksheet

An editable log of sealants, adhesives, greases and other limited-life materials with expiry, months left, value and action.

MRO Non-Routine Findings Log Worksheet

Log every non-routine finding during a check with estimated hours and parts, and see the running cost to share with the customer.

AD and Service Bulletin Compliance Tracker Worksheet

Track recurring AD and SB items by interval, last done and current flight hours, with remaining hours calculated for each line.

Life-Limited Part (LLP) Tracking Worksheet

List serialized life-limited parts with their limit and cycles since new, then see percent used, cycles remaining and months left at your utilization.

MRO Component Repair Quote Comparison Worksheet

Compare vendor repair quotes on total landed cost including freight and downtime, with cost per warranty day and approval status, then export to Excel.

AS9100D Internal Audit Checklist by Clause

An editable AS9100D internal audit checklist, clause 4 to 10, with audit questions, evidence and results, plus a guide to building an audit plan.

AS9100D Gap Analysis Template

An editable gap analysis against AS9100D clauses. Score each requirement area, see your overall percentage and list actions with owners and dates.

Calculators and simulators

Government Contract Compliance Cost Calculator

Estimate the implementation, assessment, and recurring annual cost of DFARS/CMMC compliance for your DoD business, and see it as a percentage of contract revenue.

Aerospace Supplier OTD and Quality Rating Calculator

Turns lots received, late lots and rejects into on-time delivery, lot acceptance, PPM and a single weighted supplier rating.

Aerospace Delta FAI Cost Savings Calculator

Compares the cost of a full first article inspection with a delta FAI that re-inspects only affected characteristics.

NIST 800-171 SPRS Score Calculator

Calculate your SPRS score from the DoD Assessment Methodology: start at 110 and subtract the weight of each unmet NIST SP 800-171 requirement.

CMMC Level 2 Remediation Budget Calculator

Turn a gap count and CUI headcount into a first-year CMMC Level 2 budget, with a sweep showing how cost scales with the number of CUI users.

NIST 800-171 Audit Log Storage Sizing Calculator

Estimate gigabytes per day, online searchable storage and compressed archive storage for the audit logs your CUI environment must produce and keep.

CUI Enclave vs Enterprise Scope Cost Calculator

Model whether a dedicated CUI enclave is cheaper than bringing every user into scope, with a break-even CUI headcount and a what-if chart.

DPAS Rated Order Acceptance Deadline Calculator

Find how many working and calendar days remain to accept or reject a DO or DX rated order and how much your lead time must shrink to meet the required delivery.

Export License Delay Schedule Risk Calculator

See expected and worst-case license lead time against production and delivery dates, and the liquidated damages exposure if the license arrives late.

MRO Turn Time Calculator

Add up the stages of a repair, see total turn time against target, the value-adding share and the work in process your shop will carry.

Rotable Pool Sizing Calculator

Estimate rotable spares from fleet size, removal rate, repair loop time and service level using a Poisson safety margin.

AOG Cost Calculator

Total the daily cost of an aircraft on ground and compare an expedited AOG purchase with a standard-lead-time order.

Aircraft Component Repair vs Replace Cost Calculator

Compare total repair cost with the cost of a new unit after adding downtime and adjusting for remaining life, and find the break-even repair price.

Engine Shop Visit Reserve per Flight Hour Calculator

Turn a shop visit estimate (labor, parts, life-limited parts, other) into a reserve per engine flight hour, per cycle and per month, with a sweep over the interval between visits.

LLP Remaining Life and Pro-Rata Value Calculator

Calculate remaining cycles, life consumed, pro-rata value and the date to order a replacement for a life-limited part, with a chart over utilization.

MRO Repair vs Exchange Breakeven Calculator

Compare repairing a rotable with exchanging it, adjusting for loaner cost, turn time, beyond-economic-repair probability and remaining life, and find the breakeven repair price.

MRO Shop Capacity and Backlog Weeks Calculator

Turns headcount, shifts, utilisation and standard hours per unit into weekly capacity and how many weeks the backlog will take.

AS9100 Certification Cost Estimator

Calculator for the total cost of AS9100 certification: registrar fees, consultant, training, internal time and the three year surveillance cycle.

Reference tables

AS9100D Clause Structure Reference

Searchable map of AS9100D clauses 4 to 10, flagging the aerospace additions to ISO 9001 and the usual ERP evidence for each.

Aerospace Special Process Specification Reference

Lookup of common aerospace special processes and the AMS, ASTM, AWS and MIL specifications usually cited on drawings and purchase orders.

Aerospace Alloy AMS Specification Reference

Lookup of common aerospace alloys, product forms and the AMS specifications often cited for material purchasing and certification.

AMS 2750 Furnace Class and Uniformity Reference

Furnace classes 1 to 6 with the temperature uniformity range, plus how to read a class against a heat treat specification.

ITAR USML Categories I to XXI Reference

All 21 USML categories with their official titles and a plain summary of what a machine shop, electronics house or software team should look for.

ITAR License, Agreement and DDTC Form Reference

A quick reference to DSP-5, DSP-61, DSP-73, DSP-85, DSP-83, TAA, MLA, WDA and other ITAR authorizations and what each is used for.

MIL-STD-810H Test Methods Reference Table

Look up every MIL-STD-810H environmental test method number, title and the stress it covers, then export the list for your test plan.

MIL-STD-461 EMI/EMC Test Method Reference Table

Every MIL-STD-461 method code (CE101 to RS105) with its title and emission or susceptibility type, searchable and exportable.

FAA 8130-3 Tag Field Guide

A searchable reference of 8130-3 fields, what belongs in each, and the errors receiving inspectors most often find.

ATA Chapter Numbers Reference List

Search every ATA chapter number and title used to organise aircraft maintenance manuals, task cards and parts catalogues.

Aircraft Time-in-Service Abbreviations Reference

A searchable glossary of the abbreviations used for component life, repair status and maintenance records in aviation MRO.

Aerospace Counterfeit Avoidance Standards and Clauses Reference

A lookup table of the standards, contract clauses and programs that govern counterfeit parts avoidance, with who they apply to and what they require in general terms.

Checklists

ITAR Compliance Checklist for Manufacturers

A 32-point checklist covering DDTC registration, technical data controls, foreign person access, IT security, and recordkeeping for ITAR-regulated manufacturers.

AS9100 Audit Readiness Checklist

A 30-point checklist for AS9100 Rev D certification and surveillance audits, weighted toward the aerospace-specific requirements where auditors write the most findings.

Export Control Screening Checklist

A 28-point checklist for screening every order, party, and shipment against EAR and ITAR requirements - restricted parties, classification, end-use, licensing, and documentation.

First Article Inspection (AS9102) Checklist

A 30-point checklist for complete, first-pass-acceptable AS9102 FAIs - planning, Form 1/2/3 completeness, characteristic accountability, and the delta FAI triggers teams miss.

ISO 27001 Readiness Checklist

Work through ISMS foundations, risk treatment, Annex A controls, documentation, and audit readiness to find your gaps before engaging a certification body.

FOD Prevention Program Checklist

Check your foreign object debris program across tool control, housekeeping, training, work area rules and audits.

Aerospace External Provider Flowdown Checklist

Checklist of items to include on aerospace purchase orders so external providers receive process, quality, record and regulatory requirements.

CUI Marking Checklist for DoD Contractors

A practical checklist for marking, handling, storing, transmitting and destroying controlled unclassified information in contractor environments.

Aircraft Part Traceability Checklist

A 28-point checklist covering receiving, documentation, serial and batch control, life-limited parts and installation records for aircraft parts in an MRO.

EASA Form 1 Field Checklist

A 27-point checklist for checking an EASA Form 1 Authorised Release Certificate at receiving, field by field.

Suspected Unapproved Parts Receiving Checklist

A receiving inspection checklist for catching suspected unapproved aircraft parts before they reach stock or an aircraft.

Nadcap Compliance Checklist

A 36-point Nadcap audit-readiness checklist: what you need in place before the audit, by commodity (heat treat, chemical processing, NDT, coatings), and how to close findings.

Nadcap Audit Checklists for Heat Treat, Welding and Composites

Pre-audit checklists organised by special process: heat treating, welding and composites, plus common items every Nadcap audit checks. Tick items, export your status.

Nadcap Self-Audit Checklist (AC7004 Quality System and Commodity Criteria)

A self-audit checklist for the quality system topics covered by AC7004, plus a reference of Nadcap commodity audit criteria so you know which checklist applies.

CMMC Level 2 Compliance Checklist by Domain

A CMMC Level 2 requirements checklist grouped by the 14 NIST SP 800-171 domains, with the critical items flagged. Export it to PDF.

Assessments

CMMC 2.0 Level 2 Readiness Assessment

Answer 10 questions mapped to NIST SP 800-171 control families and get an instant CMMC Level 2 readiness score with prioritized next steps.

DFARS 252.204-7012 Compliance Self-Assessment

A 10-question self-assessment covering the full DFARS 7012 clause: NIST 800-171 implementation, SPRS, incident reporting, cloud requirements, and flowdown.

Defense Contractor AI Readiness Assessment

A 9-question assessment measuring whether your defense manufacturing business can adopt AI productively and compliantly - across governance, data, infrastructure, and skills.

Counterfeit Parts Risk Assessment (AS5553)

A 10-question assessment of your counterfeit electronic parts exposure, aligned to AS5553 and DFARS counterfeit prevention requirements, with a risk band and mitigation plan.

Aerospace Supplier Scorecard

Rate a supplier across 10 criteria - OTD, quality escapes, AS9100 status, FAI performance, CAPA responsiveness, compliance flowdown, and financial health - for an instant risk rating.

ITAR AI Workload Compliance Assessment

Score your AI deployments across eight dimensions of ITAR exposure, from technical data classification and US persons access control to technology control plan coverage.

Zero Trust Readiness Assessment

Answer 8 questions on identity, device posture, segmentation, and access policy to get a scored zero trust maturity band with a specific remediation roadmap.

SOC 2 Readiness Assessment

Answer 7 questions on policies, access control, monitoring, and evidence retention to get a scored SOC 2 readiness band with specific next steps before engaging an auditor.

Business Continuity Readiness Assessment

Answer 8 questions on DR testing, RTO validation, single-source supply risk, and cyber integration to see how ready your operation is to survive a major disruption.

Third-Party Risk Assessment Scorer

Answer 8 questions on supplier due diligence, sub-tier visibility, concentration risk, and export control flowdown to score your third-party risk exposure.

Data Residency Requirements Assessment

Answer 8 questions on ITAR and CUI data location, US-persons-only cloud enforcement, and sub-tier verification to score your data residency compliance posture.

MRO Digital Records Readiness Self-Assessment

A ten question self-assessment of how well your repair station holds traceability data across planning, stores, shop floor and finance.