Optical and Laser Standards Reference: ISO 10110, ISO 11146, IEC 60825 and More
Optical drawings and laser quality documents reference a lot of standards, and it is easy to cite the wrong one. This guide maps each ISO, IEC, ANSI and MIL standard to its topic so you can find the right reference when writing a specification, auditing a supplier or answering a customer.
| Standard | Topic | What it covers | Who uses it |
|---|---|---|---|
ISO 10110-1 | Optical drawings | General indications and conventions for preparing optical element and system drawings | Optical designers, drafting, suppliers |
ISO 10110-2 | Material imperfections | Stress birefringence indication and tolerance | Optical designers, incoming inspection |
ISO 10110-3 | Material imperfections | Bubbles and inclusions in the blank material | Optical designers, glass buyers |
ISO 10110-4 | Material imperfections | Inhomogeneity and striae of the material | Optical designers, glass buyers |
ISO 10110-5 | Surface form | Surface form tolerances such as irregularity and power | Optical designers, metrology |
ISO 10110-6 | Centring | Centring tolerances of lens elements | Optical designers, assembly |
ISO 10110-7 | Surface imperfections | Surface imperfection tolerances, an alternative to scratch-dig | Optical designers, incoming inspection |
ISO 10110-8 | Surface texture | Surface texture, roughness and waviness indications | Optical designers, polishing |
ISO 10110-9 | Surface treatment | Surface treatment and coating indications on drawings | Optical designers, coating suppliers |
ISO 10110-10 | Drawing data | Table representing data of a lens element | Optical designers, suppliers |
ISO 10110-11 | Drawing data | Non-toleranced data | Optical designers |
ISO 10110-12 | Aspheric surfaces | Indications for aspheric surface description | Optical designers, asphere manufacturers |
ISO 10110-14 | Wavefront | Wavefront deformation tolerance | Optical designers, interferometry |
ISO 10110-17 | Laser irradiation | Laser irradiation damage threshold indications | Laser optics designers |
ISO 9211-1 | Optical coatings | Definitions for optical coatings | Coating engineers, buyers |
ISO 9211-2 | Optical coatings | Optical properties of coatings | Coating engineers |
ISO 9211-3 | Optical coatings | Environmental durability of coatings | Coating engineers, quality |
ISO 9211-4 | Optical coatings | Specific test methods for coatings | Coating engineers, quality |
ISO 11145 | Laser vocabulary | Vocabulary and symbols for lasers and laser-related equipment | Everyone writing specs |
ISO 11146-1 | Beam measurement | Beam widths, divergence and propagation ratio for stigmatic and simple astigmatic beams | Laser engineers, metrology |
ISO 11146-2 | Beam measurement | Beam widths, divergence angles and propagation ratios for general astigmatic beams | Laser engineers, metrology |
ISO 11146-3 | Beam measurement | Intrinsic and geometrical laser beam classification, propagation details | Laser engineers |
ISO 21254-1 | Damage threshold | Laser-induced damage threshold, definitions and general principles | Laser optics suppliers and buyers |
ISO 21254-2 | Damage threshold | Determination of laser-induced damage threshold | Test labs, laser optics suppliers |
ISO 21254-3 | Damage threshold | Assurance of laser power (energy) handling capabilities | Laser optics suppliers and buyers |
ISO 21254-4 | Damage threshold | Inspection, detection and measurement of damage | Test labs |
ISO 14999 | Interferometry | Interferometric measurement of optical elements and optical systems | Optical metrology |
ISO 12123 | Raw optical glass | Specification for raw optical glass | Glass buyers, optical designers |
IEC 60825-1 | Laser safety | Safety of laser products: classification, requirements and user guidance | Laser manufacturers, safety officers |
IEC TR 60825-14 | Laser safety | A user's guide to laser product safety | Safety officers, integrators |
ISO 11553-1 | Laser machine safety | Safety of machinery: laser processing machines, general safety requirements | Machine builders, integrators |
ANSI Z136.1 | Laser safety (US) | Safe use of lasers, the base US standard behind the laser safety officer role | US laser users, LSOs |
MIL-PRF-13830 | Surface quality (US) | Optical components for fire control and similar instruments, with the scratch-dig surface quality method | Defense optics suppliers and buyers |
This guide names standards and describes their scope in our own words. Clause details, current revisions and limits are in the published standards, so buy or access the current edition before citing a requirement on a drawing or purchase order.
Standards register template review
Want your controlled standards register tied to part numbers and suppliers in your ERP? Tell us what you have and we will suggest a structure. Optional.
Optional. The tool and every export work without this. No spam.
How to use the guide
Search by topic words such as coating, damage, beam or drawing, or by standard number. The scope column tells you what a standard covers so you can pick the right one for a drawing note or a supplier quality agreement. Export the list to Excel to build a controlled standards register for your quality system.
- Search for 10110 to see every part of the optical drawing series
- Filter on laser safety to find product and machine standards
- Use the who-uses-it column to route standards to the right team
- Record the revision you actually hold in your document control
Drawings and surface quality
The ISO 10110 series describes how to specify an optical element on a drawing: material imperfections in parts 2 to 4, surface form, centring, surface imperfections and texture in parts 5 to 8, coatings in part 9, and data tables in parts 10 and 11. Many US suppliers still quote scratch-dig, derived from MIL-PRF-13830, while ISO 10110-7 uses a defect area approach. Your drawing must state which system applies, because grades from the two systems are not interchangeable.
Beams, damage and coatings
ISO 11146 defines how beam width, divergence and the beam propagation ratio M-squared are measured, so two suppliers quoting M-squared are using the same method. ISO 21254 covers laser-induced damage threshold testing and power handling assurance, which matters when you buy mirrors and windows for high-power lasers. ISO 9211 covers definitions, optical properties and durability testing of optical coatings, and is a common reference in coating purchase specifications.
Laser safety standards
IEC 60825-1 sets the classification and requirements for laser products and underpins the class labels (1, 1M, 2, 2M, 3R, 3B, 4) that you see worldwide. ISO 11553-1 addresses the safety of laser processing machines, while ANSI Z136.1 is the base US standard for safe use. A product that satisfies one does not automatically satisfy the others, since they cover different obligations of manufacturer, integrator and user.
Frequently Asked Questions
What is ISO 10110?
ISO 10110 is a multi-part standard that defines how to indicate optical elements and systems on technical drawings. It covers material imperfections, surface form, centring, surface imperfections, texture, coatings, aspheres, wavefront deformation and laser damage threshold indications, so optics suppliers read drawings the same way.
How is scratch-dig different from ISO 10110-7?
Scratch-dig comes from the US military specification MIL-PRF-13830 and grades defects by visual comparison against a standard. ISO 10110-7 specifies tolerances using the actual measured size and count of defects. The two cannot be converted exactly, so state one system clearly on the drawing.
Which standard defines M-squared measurement?
ISO 11146 defines how to measure laser beam widths, divergence angles and the beam propagation ratio, written as M-squared. Using this standard lets a buyer compare a supplier's M-squared claim against their own measurement on equal terms.
Do I need to buy the standards to use this guide?
No, the guide is free and summarises scope only. But clause numbers, limits and test details come from the published documents, so purchase or access the current edition before you write a requirement into a drawing, contract or audit finding.
If your supplier specifications, certificates and inspection results are scattered across ERP attachments and shared drives, we can build a private assistant that finds the governing standard and the evidence for each part. Talk to us about what that would involve.
Related Tools
Laser Safety Eyewear Selection and Inspection Checklist
Work through selection, labelling, inspection and storage checks for laser protective eyewear used in manufacturing and test areas.
Industry TemplatesOptical Coating Types and Performance Reference
Compare common optical coatings by operating band, typical reflectance or transmission, strengths and limitations before you write a purchase spec.
Industry TemplatesLaser Types, Wavelength and Application Reference
Find the output wavelength, spectral region and typical industrial use for common gas, solid-state, fiber, diode and excimer lasers.
Industry TemplatesOptical Glass and IR Material Refractive Index Reference
Look up refractive index, Abbe number, transmission window and typical use for common optical glasses, crystals and infrared materials.
More Compliance & Contracts tools
See all- SAP SoD Residual Risk Score Calculator
- SAP Firefighter ID Usage Review Log
- IBM i (AS/400) User Profile Access Review Worksheet
- SyteLine Security and User Access Audit Checklist
- Infor XA (MAPICS) User Access Review Worksheet
- China ERP Data Security and Compliance Assessment
- ERP Vendor Data Processing Agreement Outline
- GDPR ERP Data Migration Checklist
- EU Machinery Regulation 2023/1230 Readiness Checklist
Keep exploring
Free tools
- Laser NOHD and Eyewear Optical Density CalculatorCalculate nominal ocular hazard distance and the optical density needed at a given distance for a continuous-wave laser, from power, beam size, divergence and MPE.
- Optical Coating Types and Performance ReferenceCompare common optical coatings by operating band, typical reflectance or transmission, strengths and limitations before you write a purchase spec.
- Laser Safety Classification ReferenceA searchable table of laser classes and the safety terms behind them: AEL, MPE, NOHD, optical density, interlocks and controlled areas.
Guides
- Optics Job Costing: Why Quoted Margin and Actual Margin DivergeWhy optics shops lose margin between quote and actual: hidden rework, yield, coating reruns, metrology time and tooling. How to cost jobs honestly.
- ITAR and EAR Export Controls for Optics and Photonics ManufacturersITAR and EAR for optics and photonics makers: USML vs CCL classification, deemed exports, foreign customers and what to log. Not legal advice.
- Optical Inspection Records and Certificates of Conformance for Optics MakersWhat optics makers should record for quality: interferometer data, scratch-dig, centration, coating spectra, lot traceability and certificates of conformance.