PCB Microstrip Impedance and Delay Calculator
Controlled impedance traces are a common reason a quote comes back with extra cost. This calculator gives a fast, defensible first-pass Z0 and delay for a surface microstrip before you send a stackup to the fabricator.
Your numbers
Prepreg or core thickness between trace and plane.
35 um is 1 oz finished copper.
Check the laminate datasheet at your operating frequency.
Your results
The IPC-2141 closed-form formula is accurate to a few percent only inside its w/h range. For fabrication, confirm impedance with your fabricator's field solver and stackup, and specify tolerance on the drawing.
Z0 vs trace width
Sweeps Trace width from 0.1 to 0.8, holding your other inputs fixed.
Link stackups to your item master
Optional: talk through carrying PCB spec data into your ERP.
Optional. The tool and every export work without this. No spam.
How to use it
Enter the trace width, the dielectric height between the trace and its reference plane, the finished copper thickness and the laminate Er. The calculator returns Z0 and the delay per mm. Adjust the width until Z0 reaches your target, such as 50 ohm single ended, then give the width and stackup to the fabricator for field-solver confirmation.
The formula behind it
The IPC-2141 surface microstrip approximation is Z0 = 87 / sqrt(Er + 1.41) x ln(5.98 h / (0.8 w + t)). Delay per unit length follows from the effective dielectric constant, tpd = 85 x sqrt(0.475 Er + 0.67) picoseconds per inch, which converts to about 3.35 ps per mm times the same square root factor.
- Wider trace lowers Z0
- Thicker dielectric raises Z0
- Higher Er lowers Z0 and slows the signal
- Solder mask over the trace lowers Z0 by a few ohms
Reading the result
With 0.3 mm width, 0.2 mm dielectric, 35 um copper and Er 4.3, the result is near 53 ohm. A typical tolerance for fabricated controlled impedance is plus or minus 10%, and tighter tolerances cost more. Use the delay output to length-match differential pairs and memory buses in time rather than only in millimeters.
Common mistakes
Using nominal Er from a datasheet at 1 MHz when your signal runs at gigahertz gives errors. Another mistake is forgetting that prepreg thickness after lamination is less than the raw value because resin flows into copper-free areas. Always ask the fabricator for the pressed thickness used in their solver.
Frequently Asked Questions
Does this work for stripline?
No. Stripline sits between two planes and uses a different formula. This calculator covers surface microstrip only, with an air and mask interface on one side of the trace.
What width gives 50 ohm on FR-4?
It depends on dielectric height. For about 0.2 mm dielectric and Er 4.3, a width near 0.35 mm is typical. For thicker dielectrics the trace must be wider, so always run the numbers for your stackup.
How accurate is the closed-form formula?
It is usually within a few percent for w/h between 0.1 and 2.0, but field solvers account for etch trapezoid shape, mask and roughness. Use this for planning and a field solver for release.
Why is delay shown?
Signal timing depends on the effective dielectric constant. Delay lets you match trace lengths for clocks and buses in picoseconds, which is the unit signal integrity rules use.
Netray can connect your PCB specifications and fabricator quotes to the ERP item master so impedance requirements travel with the part.
Related Tools
PCB Trace Current Capacity and Temperature Rise Calculator
Enter trace width, copper weight, layer type and allowed temperature rise to get the maximum current from the IPC-2221 equation.
Electronics ManufacturingPCB Trace Resistance and Voltage Drop Calculator
Compute DC resistance, voltage drop and I squared R loss for a copper trace including the temperature coefficient of copper.
Electronics ManufacturingIPC Class Selector (Class 1, 2, or 3)
Answer 8 questions about failure consequence, environment, and service life to see whether your product needs IPC Class 1, 2, or 3.
Electronics ManufacturingEMS Partner Selection Scorecard
Score a candidate contract manufacturer across 10 weighted criteria, from certifications and quality data to traceability and change handling.
More Electronics Manufacturing tools
See all- J-STD-020 MSL Floor Life and Soak Reference
- PCB Panelization Calculator
- Solder Paste Volume Calculator
- SMT Placement Rate and Cycle Time Calculator
- Solder Alloy Melting Point Reference Table
- PCBA First Article Inspection Report Template
- MSD Moisture Sensitive Device Floor Life Log
- SMT Stencil Usage and Cleaning Log
- PCBA First Pass Yield and DPMO Calculator
Keep exploring
Free tools
- PCB Trace Width Calculator (IPC-2221)Find the minimum trace width for a given current, allowed temperature rise and copper weight using the IPC-2221 relationship.
- PCB Trace Width and Current Capacity Calculator (IPC-2221)Enter current, allowed temperature rise and copper weight to get the minimum external or internal trace width from the IPC-2221 formula.
- PCB Trace Current Capacity and Temperature Rise CalculatorEnter trace width, copper weight, layer type and allowed temperature rise to get the maximum current from the IPC-2221 equation.
Guides
- How to Quote PCB Assembly From a Customer BOMStep by step PCB assembly quoting from a customer BOM: part matching, price breaks, lead time risk, overage and attrition, and quote validity for EMS shops.
- PCBA Quoting Software for EMS CompaniesHow EMS and PCBA shops evaluate quoting software: BOM import, live distributor pricing, assembly labor models, NRE, and how quotes tie back to the ERP.
Software
- Siemens XpeditionWhat Siemens Xpedition is: enterprise PCB design, constraint management, analysis and Teamcenter links, plus limits and alternatives for electronics makers.
- Cadence AllegroWhat is Cadence Allegro? The Cadence PCB and package design platform explained: modules, Allegro X, constraint management, PLM and ERP links, limits and alternatives.