Costing & FinanceFree calculatorPDF, Excel, Word exportSheet Metal Fabrication

Press Brake Bend Cost per Part Calculator

Press brake pricing is a two-part problem: a setup that is paid once and a run time that is paid every part. This calculator keeps them separate so quantity breaks are honest and cost per bend is easy to compare across jobs.

Your numbers

bends
s

Position, bend, reposition and flip. Small parts run 5 to 8 s; long or heavy parts take 20 s or more.

s
parts
min

Gauging, program load, first test bend.

changes
min
min
$/hr
$/hr
2 %

Your results

Brake cost per part
$5
Job brake cost
$471
Combined hourly rate
$133
Total setup time
55 min
Setup cost for the job
$122
Run seconds per part
92
Run cost per part
$3
Setup cost per part
$1
Cost per bend
$1

Planning figures only. Heavy, long or tight-tolerance parts, forming tools and back gauge repositioning need adjusted time per bend.

Free, optional. Reopen it on any device.
Save results:

Brake cost per part by order quantity

Sweeps Order quantity from 1 to 300, holding your other inputs fixed.

Capture bend times from the floor

Optional review of how press brake run and setup times could be captured and fed into estimating.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Count bends on the drawing, then estimate seconds per bend from your own time studies. Add handling for loading and stacking. Enter setup minutes, the number of tool changes and first piece inspection time. Use machine rate plus operator rate for the hourly figure, and choose two operators for long or heavy parts. The tool returns job setup cost, run cost per part, cost per part including a scrap allowance, cost per bend and the whole job cost, and the chart shows how setup falls away as quantity rises.

  • Use real tool change counts from the setup sheet.
  • Include flipping and regripping in time per bend.
  • Keep the scrap allowance for bend rework and test pieces.

Method and formulas

Run cost per part equals bends times seconds per bend plus handling seconds, divided by 3600 and multiplied by the combined hourly rate. Setup cost equals setup, tool change and inspection minutes divided by 60, times the hourly rate; dividing it by order quantity gives setup per part. The scrap allowance multiplies the sum. This is a standard time-based cost model; it does not use machine-specific tonnage, so check forces with the press brake tonnage calculator before committing tooling.

Reading the result

At the defaults, run time is 92 seconds per part and a 100 piece order carries about 83 dollars of setup. The chart shows brake cost per part falling steeply under 50 pieces and flattening past 200. If cost per bend is far above your shop average, check time per bend and tool changes first. A job with many distinct flange heights often needs more tool changes than the drawing suggests.

Common mistakes

Estimators often charge a flat price per bend regardless of part size, which underprices long or heavy parts. Another is ignoring first piece inspection, and treating setup as free on repeat orders when programs and gauges still need verification.

Frequently Asked Questions

How long does a press brake setup usually take?

Simple single-tool jobs take 10 to 20 minutes. Multi-tool jobs with several flange heights, offset forms or gooseneck tooling take 30 to 60 minutes or more. Use your own setup logs since back gauge programming and tool library quality vary a lot.

What is a typical time per bend?

Small light parts on a CNC brake run about 5 to 10 seconds per bend. Mid-size parts take 10 to 20 seconds. Long, heavy or tight tolerance parts can take 30 seconds or more per bend and may need two operators or a support.

Should I charge a flat price per bend?

Only for a narrow family of similar parts. A per-bend price hides differences in part length, thickness and setup. Use time-based costing and then express the result per bend as a sanity check, as this tool does.

How do I handle parts with multiple setups?

Add the tool changes to the count or run the calculator once per setup and add the job totals. Parts bent in two stations, with a deburr or hardware insertion between, should be costed operation by operation.

If bend times and setups are tracked on the floor but not fed into quotes, Netray can help connect shop data with your ERP estimating. Ask for an expert review.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring