Costing & FinanceFree templatePDF, Excel, Word exportSheet Metal Fabrication

Sheet Metal Quote Worksheet Template

A good fabrication quote states what is included, what it assumes and what quantity the price applies to. This template gives estimators a clear document with a cost build-up checklist, quantity breaks and space for assumptions.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

Sheet Metal Quote Worksheet Template

Quotation Q-2026-1042

From: Acme Precision Fabrication To: Northfield Equipment Ltd Date: 2026-10-20 Valid for: 30 days

Part and process

ItemDetail
Part number / revisionBRK-2210 Rev B
MaterialMild steel CR
Thickness2.0 mm
ProcessLaser cut and form
FinishDeburr only

Pricing by quantity

QuantityUnit priceExtended price
505.40
2504.35
10003.80

Internal cost build-up (remove before sending)

ElementPer partBasis
Material incl. scrapWeight / nesting yield x price per kg
Cutting or punchingRun time x machine rate
FormingBends x time per bend x press rate
Welding / hardwareTime or hardware cost
Finishing / outside processVendor quote or internal rate
Setup per partSetup time x rate / quantity
Inspection and packaging
MarginPercent on cost

Lead time

15 working days from approved order

Assumptions and exclusions

Material supplied by us to the specification above. Tolerances per ISO 2768-m unless noted. Tooling and first article inspection are included. Packaging is standard cartons on pallets.

Acceptance

Prepared by (estimator) / Date
Approved by (management) / Date
Customer acceptance / Date

A starting point, not legal advice. Add your own payment terms, warranty, tolerance and certificate requirements, and have contract terms reviewed locally. Delete the internal cost build-up block before you send a quote to a customer.

Connect estimating to your ERP

Optional: a short conversation about moving quotes into orders and routings without re-keying.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the template

Fill in the customer, part number and revision, material, thickness, process and finish, then add up to three quantity breaks with their unit prices. Write the assumptions and exclusions in the text field, since this is where most disputes are avoided. The internal cost build-up block is a prompt for your estimator and should be removed or kept internal before sending. Export to PDF or Word for the customer and keep the Excel or CSV for your records.

  • Always quote against a drawing revision.
  • State who supplies the material and to what specification.
  • Show at least two quantity breaks to guide ordering.

What a sheet metal quote should cover

A complete quote covers material (including scrap), cutting or punching time, forming operations, welding or hardware insertion, finishing or outside processing, setup spread across the quantity, inspection, packaging and margin. It also states tolerances, certificates, lead time and validity. Missing items are the common source of margin loss. For repeat work, the cost build-up gives a consistent structure so two estimators price the same part in the same way.

  • Material, cutting, forming, finishing and setup as separate lines.
  • Outside processing priced from a current vendor quote.
  • Lead time tied to order approval, not quote date.

Pricing by quantity

Unit price falls with quantity because setup, programming and first article work are spread over more parts, and because nesting improves. Use the laser cutting cost and nesting yield calculators on this site to estimate each element, then enter the prices at your chosen breaks. Many shops add a minimum order charge for small runs. Keep a record of quoted versus actual cost after each job to improve the next estimate.

  • Quote breaks where setup effect flattens.
  • Add a minimum order value for very small quantities.

Common mistakes

Quoting without a drawing revision, leaving out outside processing lead time, forgetting that material prices move, and not stating what happens if quantities change are the common problems. Set a short validity period when material is volatile. If you use an ERP, link the quote to the item, routing and revision so that an accepted quote becomes a sales order with the same assumptions.

  • Tie validity to material price volatility.
  • Convert accepted quotes into orders without re-keying.

Frequently Asked Questions

What should be on a sheet metal fabrication quote?

Customer and part details with revision, material and thickness, process and finish, unit price by quantity, lead time, validity, assumptions and exclusions, and any inspection or certificate requirements. Clear assumptions prevent most later disputes.

How do I price small quantities?

Spread setup, programming and first article inspection over the actual quantity, and add a minimum order value. A single piece can cost many times the unit price of a hundred, so show quantity breaks.

Should material price be fixed in a quote?

Only for a short validity period, or state that material is surcharged to the price at order. Metal prices move, and long validity with a fixed price transfers the risk to the fabricator.

Can I use this as a contract?

No. It is a quotation format and a starting point. Payment terms, warranty, liability and other contract clauses should be added and reviewed according to your local requirements.

If quotes are rebuilt in spreadsheets and re-keyed into the ERP, Netray can help connect estimating to your item, routing and order data, with on-prem options for sensitive customers.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

AI on your ERP