Quantity Discount EOQ Calculator
A supplier offers a lower price for bigger orders, and the cheapest unit price is not always the cheapest total cost. This calculator tests each price tier against purchase cost, ordering cost and carrying cost and picks the winner.
Your numbers
Buyer time, receiving, inspection, freight handling and payables per order.
Your results
All-units discounts only: the lower price applies to every unit once the break is reached. Incremental discounts need a different calculation.
Total annual cost by tier vs cost per order
Sweeps Cost per order from 5 to 400, holding your other inputs fixed.
Price break analysis on your item master
Optional: we can run this across your high-spend items using ERP purchase history.
Optional. The tool and every export work without this. No spam.
How to use it
Enter annual demand, your cost per order and the carrying rate as a percent of price. Then fill in up to three price tiers and the quantities where tiers two and three begin. The tool computes the best feasible order quantity within each tier and the total annual cost of each, and reports the lowest.
- Leave tier 3 at an unreachable break if there are only two tiers
- Use a full carrying rate: capital, storage, insurance, obsolescence
- Re-run when the carrying rate or order cost changes
The method
For each tier, compute the EOQ with that tier's price. If the EOQ falls below the tier's minimum, order at the break quantity. If it exceeds the tier's top, order at the top. Total annual cost is D times price plus (D / Q) times S plus (Q / 2) times carrying rate times price. The tier with the lowest total wins.
Reading the result
If tier 3 wins at the break quantity, you are buying more than you would like to hold. Check shelf life, storage space and demand risk before accepting. The chart shows that as ordering cost rises, the larger tiers become more attractive, because each avoided order saves more.
Common mistakes
Buyers often forget carrying cost and chase the lowest price. Others use a tiny order cost that makes small lots look cheap. In an ERP, price breaks live on the purchasing info record or price list, while lot sizing is separate, so the cheapest quantity may not be what MRP proposes unless you set a fixed or minimum lot.
Frequently Asked Questions
What is an all-units discount?
When you reach the break quantity, the lower price applies to every unit on the order, not just the units above the break. An incremental discount applies the lower price only to the extra units.
Why compare total cost rather than price?
A lower price on a bigger order raises average inventory, and that has a holding cost. Total cost adds purchase, ordering and holding cost so you can see the real net saving.
What carrying rate should I use?
Many manufacturers land between 15% and 30% a year once capital cost, storage, handling, insurance and obsolescence risk are included. Use your own finance number if you have one.
Does this include freight breaks?
Not directly. Add freight per order into the cost per order if it is fixed, or model a freight break as another price tier by adjusting the landed price.
If you want price breaks checked against actual demand and storage data inside your ERP, Netray can build that analysis for you.
Related Tools
Periodic Review Order-Up-To Level Calculator
Set the order-up-to level S for items you review on a fixed schedule, with safety stock sized to the review period plus lead time.
Costing & FinanceInventory Reduction Target and Cash Release Calculator
Turn a days-of-supply target into cash released, carrying cost saved and the turns you would reach.
Supply Chain & InventoryNewsvendor Single-Period Order Quantity Calculator
Find the best one-time order quantity for seasonal, short-life or last-time buys using the critical ratio.
Supply Chain & InventoryRisk Pooling Safety Stock Centralization Calculator
See how much safety stock you save by pooling several locations into one, given how correlated their demand is.
More Supply Chain & Inventory tools
See all- Oracle Fusion Inventory Turns and Carrying Cost Calculator
- Distribution ERP Fill Rate Calculator
- Distributor Rebate Tracking Worksheet
- Branch Transfer Planning Worksheet
- Distributor Slow-Moving Inventory Review Worksheet
- Distributor Vendor Performance Scorecard Worksheet
- Distributor GMROI Calculator
- Distributor Backorder Cost and Fill Rate Calculator
- EOQ with Vendor Minimum Order Calculator
Keep exploring
Free tools
- Volume Discount Break-Even Order Quantity CalculatorCompares the annual cost at your normal EOQ with the cost of ordering at the supplier's price break quantity, so you know if the discount really pays.
- Economic Order Quantity (EOQ) CalculatorCompute the order quantity that minimizes combined ordering and holding cost, with orders per year and total annual cost at the optimum.
- Infor LN EOQ Order Quantity CalculatorCalculate economic order quantity, orders per year and total annual cost, then use the result to set LN item ordering data.
Guides
- Infor M3 Pricing and Discount Structure ConfigurationConfigure complex pricing and discount structures in Infor M3 including price lists, tiered discounts, promotions, rebates, and customer-specific agreements.
- SyteLine Vendor Price Matrix Setup and ConfigurationConfigure SyteLine vendor price matrix for accurate procurement costing. Set up quantity breaks, effective dates, and currency pricing in CloudSuite Industrial.
- How to Price Small-Lot and Prototype Work in a Job ShopHow job shops price prototypes and small lots: setup amortization, programming, first article, minimum lot charges, scrap allowance and quantity breaks that protect margin.