Ransomware Tabletop Exercise Scenario Template for Manufacturers
A ransomware tabletop is a facilitated conversation that walks your plant and IT leaders through a realistic attack, one inject at a time. This template builds the scenario sheet, injects table and after-action log so you can run the session in an hour.
Fill in
Ransomware Tabletop Exercise Scenario Template
Exercise overview
Company: Acme Precision Ltd Site: Plant 2, Erie PA Date: 2026-11-12 Facilitator: IT Security Lead
Objective: test decision making, communication and recovery priorities when ransomware hits Infor SyteLine and MES on Windows terminals at each cell. This is a discussion exercise. No production systems are touched.
Scenario background
Initial access: Stolen VPN credentials.
File servers and the ERP database server are encrypted. The domain controllers are unreachable. Two CNC cells lose their program share. A ransom note demands payment within 72 hours.
Injects and discussion questions
| Time | Inject | Discussion question | Owner |
|---|---|---|---|
| T+0:00 | Operators report a ransom note on HMI and office screens | Who is called first and who declares an incident? | |
| T+0:30 | ERP is unreachable, shipping cannot print labels | What manual process keeps shipments moving? | |
| T+1:30 | Attacker claims data was copied and posts a sample | Who decides on legal, customer and regulator notice? | |
| T+4:00 | Backup admin finds the backup server also encrypted | Do we have an offline or immutable copy and has it ever been restored? | |
| T+24:00 | A key customer asks for delivery status | Who speaks to customers and what do we say? | |
| T+72:00 | Ransom deadline passes | What is the decision path on payment, and who must approve? |
Recovery priority decisions
Record the order in which the group would restore: identity services, network, ERP database, ERP application, MES, engineering file shares, quality systems, email. Note dependencies the group missed.
After-action findings
| Finding | Gap type (people, process, tool) | Action | Owner | Due |
|---|---|---|---|---|
Sign-off
Adjust injects to your own network. Do not run the exercise against live systems. Contact details for law enforcement, insurer and counsel belong in your incident response plan, not here.
Map your recovery order to real ERP dependencies
Optional expert review of which systems must come back first and what they depend on.
Optional. The tool and every export work without this. No spam.
How to run the exercise
Fill in the fields, export to PDF or Word, and print one copy per participant. Invite IT, plant operations, quality, finance, HR, legal and a senior sponsor. The facilitator reads one inject at a time and lets the group answer before moving on. Capture decisions and disagreements in the findings table as they happen, not afterward.
- Keep it to 60 to 90 minutes
- Assign a separate note taker
- Do not defend the current plan, test it
- Invite a plant supervisor who will actually lose their screens
Why manufacturers need a different scenario
Office ransomware scripts ignore the plant. In a factory the questions are different: can machines run from local programs, can you ship without the ERP, how do you keep traceability records for regulated customers, and who authorizes a line stop. Adjust the injects so they touch ERP, MES, CNC program storage and quality records.
Reading the results
Group findings into people, process and tool gaps. Typical outputs are an unclear decision owner, no offline contact list, backups never restored at scale, and no manual order and shipping procedure. Convert each finding to an action with an owner and a date, then repeat the exercise within a year with a changed scenario.
Common mistakes
Making the scenario too technical, letting IT answer for operations, skipping the legal and communication injects, and filing the report without actions. A tabletop that produces no tracked actions is a meeting, not an exercise.
Frequently Asked Questions
How long should a ransomware tabletop take?
Plan 60 to 90 minutes for a single scenario with five or six injects. Longer sessions lose attention. Reserve the last 15 minutes for findings and owners, and send the after-action list within a week.
Who should attend a manufacturing tabletop?
IT security, infrastructure, ERP admin, plant manager, a shift supervisor, quality, finance, HR, legal or outside counsel, and an executive sponsor. The plant voices matter most because they own manual fallback procedures.
How often should we repeat it?
At least once a year and after major changes such as an ERP upgrade, a new plant, or a switch of backup platform. Vary the entry point and the systems affected each time so people do not rehearse one script.
Does this replace a technical recovery test?
No. A tabletop tests decisions and communication. You still need technical restore tests of backups and a check that critical systems come back in the order you planned. Use both.
If you want the recovery order for ERP and MES systems mapped against your real dependencies, we can help document it. The template works fully without us.
Related Tools
Cyber Risk Register Worksheet for Manufacturers
Score IT and OT cyber risks by likelihood and impact, compare inherent and residual risk and track the treatment owner.
ERP OperationsBackup Restore Test Log Worksheet
Record each restore test, compare restore time to the target and see which systems miss their RTO.
ERP OperationsRansomware Recovery Time Objective Calculator
Estimate realistic hours to restore a plant after ransomware from data volume, restore speed, server rebuilds and validation.
Compliance & ContractsCyber Security Exception and Risk Acceptance Form Template
Record a policy exception for an unpatchable machine, legacy OS or vendor limitation, with compensating controls, expiry and executive acceptance.
More Industry Templates tools
See all- OEE Improvement A3 Charter Template
- Customer Order Change Request Form Template
- Plant Network Segmentation Checklist (Purdue Model)
- Server Room UPS Runtime and Sizing Calculator
- Server Room Cooling Load BTU Calculator
- Ransomware Downtime Cost Calculator for Manufacturers
- Plant Switch Port Budget Worksheet
- Industrial Protocol and Plant IT TCP/UDP Ports Reference
- Plant Network VLAN and IP Addressing Plan Worksheet
Keep exploring
Free tools
- Manufacturer Ransomware Readiness AssessmentA 10-question self-assessment that scores how ready a manufacturing site is to prevent, survive and recover from ransomware, including OT and ERP recovery.
- Plant Ransomware Response Readiness ChecklistA practical checklist to test whether your plant can detect, contain and recover from ransomware across IT, ERP and OT.
- Ransomware Downtime Cost Calculator for ManufacturersTurn restore effort, detection time and plant revenue into a recovery time and a cost estimate, and see how faster recovery changes the loss.
ERP fixes and how-tos
Guides
- Ransomware Preparedness for ManufacturersRansomware preparedness for manufacturers: immutable backups, tested ERP restores, segmentation, incident response playbooks, and realistic recovery targets.
- Lot Traceability for Medical Turned ComponentsLot traceability for medical turned components: heat numbers, ISO 13485 records, device history, recall readiness and how Swiss shops tie bar lots to shipments.