Sage 100 and Sage 300 Private AI Layer Blueprint Generator
This generator turns a few inputs about your Sage 100 and Sage 300 environment into a structured architecture plan for a private, on-prem AI assistant. It covers components, security controls, a three-phase rollout and questions for IT, ready to export and share.
Fill in
Sage 100 and Sage 300 Private AI Layer Blueprint Generator
Private AI Layer Architecture Plan: Sage 100 and Sage 300
Company: Acme Precision Ltd Sage 100 and Sage 300 version: Sage 100 Advanced or Premium (SQL Server) Database: SQL Server Hosting: on-prem server Named users: 60 across 2 site(s) Target go-live: 2027-03-01
1. Context and goal
Acme Precision Ltd runs Sage 100 and Sage 300 and wants an AI assistant that answers questions and drafts work without moving data off its own infrastructure. The assistant is read-only by default and shows the query or API call behind each answer.
Main use cases: Order and stock status questions, shortage summaries, supplier email drafts, and answers from procedures and certificates.
Typical Sage 100 and 300 questions cover customer balances, open orders, item availability by warehouse and purchase receipts, so answers are short and context windows are modest.
2. Components
| Component | Design for Sage 100 and Sage 300 | Notes |
|---|---|---|
| Data access path | Reporting copy (Sage 300 SQL Server replica, or Sage 100 scheduled ODBC extract); Sage 300 Web API or Sage 100 BOI for single records | Views with plain-language column descriptions including user-defined fields |
| Retrieval index | Vector and keyword index over contracts, data sheets and scanned invoices | Folder permissions as metadata |
| Model serving | vLLM or Ollama on 1 x 48 GB GPU, hosted on-prem server | Model sized for 60 named users |
| Tool server | Named read tools over the reporting copy; drafts for writes | Fixed queries with row limits |
| Identity and permissions | Directory user mapped to Sage role or security group; warehouse, division or company filters applied | Rights rebuilt as filters on the copy |
| Audit | Prompt, tool call, SQL or API request, answer, approver | Retained in your log store |
3. Security controls mapped to your inputs
| Requirement from your inputs | Control | Verification |
|---|---|---|
| Data that must never leave the site: Customer pricing, drawings, personnel data and any export controlled or contract data. | Model and index run on-prem server; no outbound inference calls; egress blocked at the gateway | Firewall rule review and test with outbound traffic blocked |
| Named users: 60 | Directory sign-in; every call carries the asking user; rights applied as filters or by the system API | Test with users of different rights and confirm different answers |
| Database: SQL Server | Read-only replica or reporting copy; no write access for the assistant account | Attempt a write with the assistant login and confirm it fails |
| Sites: 2 | Site and company limits applied to every tool call | Cross-site test queries |
| Writes | Only via supported APIs with named human approval; no direct database writes | Review the approval log for a sample period |
4. Three-phase rollout
| Phase | Scope | Exit criteria |
|---|---|---|
| Phase 1: read-only | Questions on core transactions, with the query shown. Pilot group first. GPU: 1 x 48 GB GPU. | Answer accuracy checked against reports on a sample set; no permission leaks |
| Phase 2: drafts | Draft emails, summaries and transaction payloads; nothing sent or posted automatically. | Users accept most drafts with light edits; audit log complete |
| Phase 3: approved actions | Narrow set of low-risk actions through supported APIs with approvers. Writes go through the Sage 300 Web API or views, or the Sage 100 Business Object Interface, never direct SQL or ODBC updates. | Rollback procedure tested; approvers named per action |
5. Open questions for IT
1. Which environments and companies or folders are in scope? 2. Can a read-only replica be created on SQL Server, and who owns it? 3. Which directory provides identity, and how are users mapped to Sage 100 and Sage 300 users? 4. Where do documents and attachments live, and who controls their permissions? 5. Is 1 x 48 GB GPU confirmed, and who hosts and patches the model server? 6. Which logs go to the SIEM, and how long are they kept? 7. Who approves each write action, and what is the rollback plan? 8. Does the plan need to be added to a security or compliance boundary before go-live on 2027-03-01?
Approvals
Planning document, not a design guarantee. Model size, GPU count and index size must be validated with your own prompts and data. Verify table, API and version details against your Sage 100 and Sage 300 documentation.
Review my Sage 100 and Sage 300 AI blueprint
Send your generated plan for an optional expert review against your Sage 100 and Sage 300 environment. The tool works fully without it.
Optional. The tool and every export work without this. No spam.
How to use it
Fill in the company name, your Sage 100 and Sage 300 version, database engine, hosting model, user and site counts, the main use cases, and the data that must stay on site. Pick the GPU you have or expect to buy, set a target go-live date, and the document updates as you type. Export to PDF or Word and circulate to IT, security and the business owner before any build starts.
- Be specific in the never-leave field; it drives the security table.
- Use the open questions section as an agenda for the first IT meeting.
- Re-generate after each decision so the plan stays current.
The design behind the plan
The plan follows a common pattern: a read-only copy of the data, a retrieval index over documents, a tool server that exposes only approved read actions, an open-weight model served locally with vLLM or Ollama, and an audit log. Sage 100 and Sage 300-specific choices are in the components table, including how to read records and how to apply user permissions.
How to read the result
Treat the components table as the technical scope and the security table as the acceptance test list. The rollout table is deliberately cautious: phase 1 is read-only, phase 2 is drafts, and only phase 3 touches transactions. If your organisation is not ready for phase 3, stopping after phase 2 still delivers real value.
Common mistakes
Skipping identity mapping, giving the assistant a broad service account, letting the model compose free-form SQL, and planning hardware before measuring prompts are the usual failures. Another is treating the model as an authority on arithmetic; totals should come from queries. The plan encodes the opposite choices.
Frequently Asked Questions
Does this plan require internet access?
No. The design runs the model, index and gateway inside your network. For an air-gapped network, weights and containers are imported on approved media and there is no outbound route.
Is the assistant able to change data in Sage 100 and Sage 300?
Read-only by default. Writes are limited to supported APIs, drafted by the assistant and submitted only after a named person approves them. Direct database writes are excluded.
How accurate are the hardware choices?
They are planning ranges. Use the sizing calculator and then test with your own prompts and document sizes before ordering hardware.
Can I share the output with auditors?
Yes, as a design starting point. It lists controls and verification steps. It does not assert any certification; your own compliance process decides what evidence is required.
Want this plan reviewed against your actual Sage 100 and Sage 300 environment? Netray can review the blueprint with your IT team and partner and build the private AI layer on your own servers.
Related Tools
Sage 100 and Sage 300 AI Assistant Sizing and Value Calculator
Estimate GPUs, index size and value for a private AI assistant on Sage 100 or Sage 300. Smaller sites often need very little hardware, and this calculator shows how little.
On-Prem AIOn-Prem GPU Sizing Calculator for ERP AI
Work out how much GPU memory and how many cards you need to serve an open-weight model to your ERP users on-prem.
On-Prem AIAir-Gapped LLM Deployment Checklist
A practical control checklist for deploying and maintaining large language models in a fully air-gapped environment, from initial staging through ongoing patching and drift detection.
On-Prem AIOn-Prem AI Deployment Checklist
A 30-point pre-deployment checklist covering use cases, hardware, security, model operations, and rollout for self-hosted enterprise LLMs.
More Other ERPs tools
See all- Infor VISUAL Work Order Status and Structure Reference
- Infor VISUAL Manufacturing Scheduling Checklist
- Infor XA (MAPICS) Period End Close Checklist
- Infor VISUAL Database Table Reference
- Infor XA (MAPICS) Application Module Reference
- IBM i Commands for Infor XA Administrators Reference
- Acumatica Generic Inquiry Design Template
- Acumatica Manufacturing Edition Setup Checklist
- Sage X3 Import Template Worksheet
New to Sage X3 and Sage 100? Start with the Sage X3 and Sage 100 guide and toolkit.
Keep exploring
Free tools
- Sage 100 and Sage 300 AI Assistant Sizing and Value CalculatorEstimate GPUs, index size and value for a private AI assistant on Sage 100 or Sage 300. Smaller sites often need very little hardware, and this calculator shows how little.
- Sage X3 Private AI Layer Blueprint GeneratorGenerate an architecture plan for adding a private AI assistant to on-prem Sage X3: SQL replica views, Syracuse SData and web services, retrieval, local GPU model, permissions and audit.
- Sage 300 Database Table ReferenceA quick lookup of well-known Sage 300 SQL table names, the module they belong to and what each stores, for reports and integrations.
ERP fixes and how-tos
- How to Add AI to Sage 100 and Sage 300 On-PremPrivate AI architecture for on-prem Sage 100 and Sage 300: ODBC or SQL extracts, Sage 300 Web API, Sage 100 BOI, local GPU model, permissions and audit log.
- Sage X3 AI Integration On-Prem: A Private ArchitectureHow to add a private AI assistant to on-prem Sage X3: SQL read replica, Syracuse SData and web services, retrieval index, local GPU model and audit trail.
- Fix Sage 100 SOTAMAS90 ODBC Connection ErrorsFix Sage 100 ODBC failures on the SOTAMAS90 DSN: 32-bit versus 64-bit driver mismatch, wrong company code, path rights, and external access security.
AI on your ERP
- AI for Sage 300, Built for Multi-Entity ManufacturersGround a private LLM on Sage 300 (Accpac) financial and operations data. On-prem AI for multi-currency, multi-entity manufacturers without a public API.
- AI for Sage 100 Small Manufacturers: Practical Answers From Work Orders, BOMs and InventoryPractical AI for small manufacturers on Sage 100: ask about work orders, BOMs, stock and shortages in plain English via ODBC or SQL, kept on a small server.
Integrations
- How to build an MCP server for Sage 100How to build a Model Context Protocol server for Sage 100: tool design, ODBC and SQL access, auth, transports, permission scoping and audit logging.
- How to add Slack to Sage 100Connect Slack to Sage 100: slash commands for order and stock lookups, interactive approval messages, and alerts, built on ODBC reads and BOI writes.