Sheet Metal Density and Weight per Square Metre Reference
Use this table to convert sheet size and thickness into weight for quoting, freight, crane and rack planning, and scrap valuation. Every value is a nominal handbook density, shown in metric and imperial units.
| Material | Density (kg/m3) | Density (lb/in3) | Weight (kg/m2 per mm) | Weight (lb/ft2 per inch) |
|---|---|---|---|---|
Mild / carbon steel | 7,850 | 0.284 | 7.85 | 40.8 |
Galvanized steel (base metal) | 7,850 | 0.284 | 7.85 | 40.8 |
Stainless steel 304 | 8,000 | 0.289 | 8 | 41.6 |
Stainless steel 316 | 8,000 | 0.289 | 8 | 41.6 |
Aluminum 1100 | 2,710 | 0.098 | 2.71 | 14.1 |
Aluminum 3003 | 2,730 | 0.099 | 2.73 | 14.2 |
Aluminum 5052 | 2,680 | 0.097 | 2.68 | 13.9 |
Aluminum 6061 | 2,700 | 0.098 | 2.7 | 14 |
Copper C110 | 8,940 | 0.323 | 8.94 | 46.5 |
Brass C260 | 8,530 | 0.308 | 8.53 | 44.3 |
Titanium Grade 2 | 4,510 | 0.163 | 4.51 | 23.4 |
Nominal handbook values. Real sheet varies with alloy composition and thickness tolerance, and coated material carries extra weight. Weight (kg) = thickness (mm) x area (m2) x the kg/m2 per mm column.
Validate item master weights
Optional: a quick review of how unit weight and material specs are held in your ERP.
Optional. The tool and every export work without this. No spam.
How to use it
Pick the material, then multiply the kg per square metre per millimetre value by the thickness in millimetres and by the area in square metres. A 1500 x 3000 mm sheet is 4.5 square metres. At 3 mm in mild steel that is 7.85 x 3 x 4.5, or about 106 kg. For imperial work, multiply pounds per square foot per inch by the thickness in inches and the area in square feet.
- Weight (kg) = thickness (mm) x area (m2) x kg/m2 per mm.
- Part weight uses the blank area, then subtract cutouts.
- Add coating or paint weight for heavy galvanized or powder coat.
Where weight matters in a fab shop
Weight feeds material cost when suppliers price by the kilogram or tonne, freight quotes, forklift and vacuum lifter limits, and the scrap credit you expect from skeleton remnants. It also sets the ERP item master unit weight that many systems use for shipping and customs. Entering a calculated blank weight instead of a guess removes a frequent source of freight disputes.
Gauge versus millimetre
Gauge numbers are not a physical standard shared across metals, so convert gauge to actual thickness before using this table. A gauge number for steel differs from the same number for aluminum or stainless. Always record the real thickness in millimetres or inches in the item master, along with the material specification, so that purchasing and estimating use the same figure.
Common mistakes
The usual errors are applying the steel density to aluminum, forgetting the unit conversion between millimetres and metres, and using the cut part bounding box area instead of the real blank area. For nested sheets, weight the whole sheet for purchasing and the individual blanks for costing, then reconcile the difference as skeleton scrap.
Frequently Asked Questions
What is the weight of 1 mm steel sheet per square metre?
Mild steel is about 7.85 kg per square metre per millimetre of thickness, based on a density of 7850 kg per cubic metre. A 2 mm sheet is therefore roughly 15.7 kg per square metre.
Why is stainless slightly heavier than mild steel?
Austenitic grades such as 304 and 316 contain nickel and chromium, giving a density near 8000 kg per cubic metre against about 7850 for carbon steel. The difference is around 2 percent.
Do these figures include coating weight?
No. They are for the base metal. Galvanizing, paint and powder coat add a small amount of weight per area, which matters for very large quantities or tight shipping limits.
Can I use this for plate as well as sheet?
Yes, the density is the same. Plate has wider thickness tolerance, so purchased weight can differ from calculated weight by several percent. Mills often quote theoretical weight with an allowed variance.
If item master weights in your ERP are guesses, we can help check them against geometry and material data. Reach out if useful.
Related Tools
Sheet Metal Minimum Bend Radius by Material Reference
Typical minimum inside bend radius for common sheet metal alloys and tempers, shown as a multiple of material thickness, with cracking notes.
Developer ToolsSheet Metal BOM to Material Demand Python Script Generator
Generates a ready-to-run Python script that totals blank weight and estimated sheet count per material and thickness from an exported part list.
Developer ToolsSheet Metal Job Cost Rollup SQL Query Generator
Builds a job cost rollup query over generic job, operation and material tables, with your table and column names filled in.
Supply Chain & InventorySheet Metal Fabrication RFQ Request Template
A fill-in RFQ document for sending a sheet metal part package to a fabricator, with all the details needed for an accurate quote.
More Engineering & PLM tools
See all- Press Brake V-Die Opening and Minimum Flange Reference
- Sheet Metal DFM Design Review Checklist
- Fiber Laser Cutting Speed and Pierce Time Indicative Reference
- SAP Super BOM Design Worksheet
- SAP Engineering Change Number Checklist
- SAP Document Info Record Template
- SAP Change Master and Revision Level Log
- SAP Engineering Change Request (ECR) Template
- SAP BOM Usage and Item Category Reference
Keep exploring
Free tools
- Sheet Metal Part Weight and Material Cost CalculatorEnter blank size, thickness, material and price per kilogram to get part weight, total weight with scrap and material cost per part.
- Steel Sheet Gauge Thickness and Weight ChartGauge to thickness in inches and mm with calculated carbon steel weight per area.
- Sheet Metal Gauge Thickness ChartA searchable gauge-to-thickness lookup for carbon steel, galvanized steel, stainless steel and aluminum, in inches and millimeters.
Guides
- ERP for Metal Fabricators: What the System Must HandleERP for metal fabricators and sheet metal shops: nested material, multi-level BOMs, heat number traceability, outside processing, and shop floor data.
- AI for Sheet Metal Fabrication Shops: What Works TodayWhere AI helps a fabrication shop today: reading RFQs and prints, checking quotes against past jobs, answering ERP questions, and flagging late jobs.
- Steel Price Volatility and Quote Validity for FabricatorsProtect fabrication margin from steel, stainless and aluminum price swings: quote validity periods, surcharge clauses, material holds and repricing rules.
AI on your ERP
- AI for ERP in Metal Fabrication: Nesting, Traceability and QuotingPrivate AI on your ERP for fab shops: nesting yield, remnants, MTR and heat traceability, weld procedure records, outside processing and quote turnaround.
- Epicor Kinetic AI for Metal Fabrication: Jobs, Heat Numbers and Outside Processing in Plain EnglishPrivate AI on Epicor Kinetic for metal fabricators: ask about jobs, nests, heat numbers and outside processing in plain English, grounded in live data.