Sheet Metal Gauge Thickness Chart
Gauge is a legacy numbering system, and the same gauge number means a different thickness for steel, galvanized steel, stainless steel and aluminum. This lookup shows the actual decimal thickness for each so that quotes, drawings and purchase orders are unambiguous.
| Gauge | Material / standard | Thickness (in) | Thickness (mm) |
|---|---|---|---|
7 | Carbon steel (Manufacturers Standard) | 0.1793 | 4.554 |
8 | Carbon steel (Manufacturers Standard) | 0.1644 | 4.176 |
10 | Carbon steel (Manufacturers Standard) | 0.1345 | 3.416 |
11 | Carbon steel (Manufacturers Standard) | 0.1196 | 3.038 |
12 | Carbon steel (Manufacturers Standard) | 0.1046 | 2.657 |
14 | Carbon steel (Manufacturers Standard) | 0.0747 | 1.897 |
16 | Carbon steel (Manufacturers Standard) | 0.0598 | 1.519 |
18 | Carbon steel (Manufacturers Standard) | 0.0478 | 1.214 |
20 | Carbon steel (Manufacturers Standard) | 0.0359 | 0.912 |
22 | Carbon steel (Manufacturers Standard) | 0.0299 | 0.759 |
24 | Carbon steel (Manufacturers Standard) | 0.0239 | 0.607 |
26 | Carbon steel (Manufacturers Standard) | 0.0179 | 0.455 |
28 | Carbon steel (Manufacturers Standard) | 0.0149 | 0.378 |
30 | Carbon steel (Manufacturers Standard) | 0.0120 | 0.305 |
8 | Galvanized steel | 0.1681 | 4.270 |
10 | Galvanized steel | 0.1382 | 3.510 |
12 | Galvanized steel | 0.1084 | 2.753 |
14 | Galvanized steel | 0.0785 | 1.994 |
16 | Galvanized steel | 0.0635 | 1.613 |
18 | Galvanized steel | 0.0516 | 1.311 |
20 | Galvanized steel | 0.0396 | 1.006 |
22 | Galvanized steel | 0.0336 | 0.853 |
24 | Galvanized steel | 0.0276 | 0.701 |
26 | Galvanized steel | 0.0217 | 0.551 |
28 | Galvanized steel | 0.0187 | 0.475 |
10 | Stainless steel (common) | 0.1406 | 3.571 |
11 | Stainless steel (common) | 0.1250 | 3.175 |
12 | Stainless steel (common) | 0.1094 | 2.779 |
14 | Stainless steel (common) | 0.0781 | 1.984 |
16 | Stainless steel (common) | 0.0625 | 1.588 |
18 | Stainless steel (common) | 0.0500 | 1.270 |
20 | Stainless steel (common) | 0.0375 | 0.953 |
22 | Stainless steel (common) | 0.0313 | 0.795 |
24 | Stainless steel (common) | 0.0250 | 0.635 |
10 | Aluminum (Brown and Sharpe / AWG) | 0.1019 | 2.588 |
12 | Aluminum (Brown and Sharpe / AWG) | 0.0808 | 2.052 |
14 | Aluminum (Brown and Sharpe / AWG) | 0.0641 | 1.628 |
16 | Aluminum (Brown and Sharpe / AWG) | 0.0508 | 1.290 |
18 | Aluminum (Brown and Sharpe / AWG) | 0.0403 | 1.024 |
20 | Aluminum (Brown and Sharpe / AWG) | 0.0320 | 0.813 |
22 | Aluminum (Brown and Sharpe / AWG) | 0.0253 | 0.643 |
24 | Aluminum (Brown and Sharpe / AWG) | 0.0201 | 0.511 |
Gauge numbers are not universal: the same number gives a different thickness for each material. Always put the thickness in inches or mm on the purchase order and in the item master. Stainless values are the commonly quoted nominal figures.
Clean up thickness attributes in your item master
Optional: a short review of how material thickness and spec could be structured in your ERP.
Optional. The tool and every export work without this. No spam.
How to use the chart
Type a gauge number or a material name into the search box to filter the table, then read the thickness in inches or millimeters. Export the filtered view to Excel or CSV if you need to share it with buyers or add it to an item master. Use the decimal thickness when you enter material in a nesting program, a CAD flat pattern or a bend table, because those tools work with real dimensions, not gauge numbers.
- Search by gauge, such as 16, or by material, such as galvanized.
- Copy the mm column into metric drawings and CAD material tables.
- Confirm the standard with your supplier when thickness is critical.
Why gauge numbers differ by material
Gauge systems developed around the wire and sheet industries, not a single standard. Carbon steel sheet follows the Manufacturers Standard Gauge, galvanized steel includes the zinc coating, aluminum follows the Brown and Sharpe or AWG series, and stainless is commonly quoted using round fractional values. Higher gauge numbers mean thinner material. As a result, 16 gauge is about 1.52 mm in carbon steel, about 1.61 mm in galvanized steel and about 1.29 mm in aluminum.
- Higher gauge number means thinner sheet.
- Galvanized gauge is thicker than bare steel of the same number.
- Plate is specified by thickness, not by gauge.
Tolerances and ordering
Gauge values are nominal. Mill tolerance on thickness varies by product, width and standard, and coatings add thickness. For parts where bend allowance, press brake tonnage or fit-up matters, measure the actual sheet with a micrometer. Put the nominal thickness in millimeters or inches, the material specification and the tolerance class on the purchase order. In your ERP item master, store thickness as a numeric attribute so it can drive nesting, costing and weight calculations.
- Order by decimal thickness plus material specification.
- Measure actual stock before setting a K-factor.
Common mistakes
The usual mistake is assuming that one gauge table covers every metal. Another is confusing galvanized and bare steel thickness, or ordering aluminum with a steel gauge number. Drawings that say only 14 gauge force the buyer and the programmer to guess. Convert gauge to decimal thickness once, record it in the item master, and use that value everywhere downstream.
- Never reuse a steel gauge number for aluminum.
- Never leave gauge as the only thickness on a drawing.
Frequently Asked Questions
What is 16 gauge steel in mm?
Carbon steel 16 gauge on the Manufacturers Standard Gauge is 0.0598 inch, about 1.52 mm. Galvanized 16 gauge is slightly thicker at 0.0635 inch, about 1.61 mm, because the coating is included.
Is a higher gauge number thicker or thinner?
Thinner. 10 gauge steel is about 3.4 mm, while 20 gauge steel is about 0.9 mm. The only exception to think about is plate and heavy sheet, which is usually ordered by thickness rather than gauge.
Why is aluminum gauge different from steel?
Because aluminum sheet uses the Brown and Sharpe (AWG) series, which is a different numbering system from the steel standard. Always quote aluminum by decimal thickness to avoid mix-ups.
Should I use gauge on drawings?
It is better not to. Specify thickness in mm or inches with the material specification. Gauge alone is ambiguous across materials and standards and can lead to wrong purchases.
If your item master still holds gauge numbers as free text, Netray can help clean up thickness attributes and link them to costing and nesting data in your ERP.
Related Tools
Sheet Metal Bend Allowance Calculator
Enter thickness, inside radius, K-factor and bend angle to get bend allowance, bend deduction and the flat blank length for a single bend.
Discrete ManufacturingPress Brake Tonnage Calculator
Estimate the force needed to air bend, bottom or coin a part, then check it against your press capacity and the minimum flange.
Discrete ManufacturingSheet Metal Nesting Yield Calculator
Turn a nest result into yield, scrap percentage, sheets required and material cost per part, with scrap credit.
Costing & FinanceLaser Cutting Cost Calculator
Work out run time, machine cost, setup per part, material and a selling price for laser cut parts, and see how quantity changes unit cost.
More Discrete Manufacturing tools
See all- Sheet Metal K-Factor Worksheet
- Punching Force Calculator for Sheet Metal
- Sheet Metal Flat Blank Length Calculator
- Press Brake Die Opening and Minimum Flange Calculator
- Sheet Metal Springback and Overbend Calculator
- Laser Cutting Time per Part Calculator
- Sheet Metal Part Cost Calculator
- Sheet Metal Part Cost Estimator
- Sheet Metal Calculation Formulas and Calculator
Keep exploring
Free tools
- Steel Sheet Gauge Thickness and Weight ChartGauge to thickness in inches and mm with calculated carbon steel weight per area.
- Sheet Metal Density and Weight per Area ReferenceDensity and weight per area per millimetre of thickness for steel, stainless, aluminum, copper, brass and titanium sheet.
- Sheet Metal Part Weight and Material Cost CalculatorEnter blank size, thickness, material and price per kilogram to get part weight, total weight with scrap and material cost per part.
Guides
- Steel Price Volatility and Quote Validity for FabricatorsProtect fabrication margin from steel, stainless and aluminum price swings: quote validity periods, surcharge clauses, material holds and repricing rules.
- ERP for Metal Fabricators: What the System Must HandleERP for metal fabricators and sheet metal shops: nested material, multi-level BOMs, heat number traceability, outside processing, and shop floor data.
- AI for Sheet Metal Fabrication Shops: What Works TodayWhere AI helps a fabrication shop today: reading RFQs and prints, checking quotes against past jobs, answering ERP questions, and flagging late jobs.