Engineering & PLMFree calculatorPDF, Excel, Word exportIndustrial Machinery

Spur Gear Dimensions Calculator

Enter the module, tooth counts and pressure angle and this calculator returns the pitch, outside, root and base diameters, whole depth, circular pitch and center distance for a standard spur gear pair. It is what a machinist, programmer or estimator needs to size the blank and set the shaft spacing.

Your numbers

mm

Pitch diameter divided by tooth count. Choose a standard value, see the module reference table.

teeth
teeth

The selection stores the cosine of the angle, which is what the base circle formula needs.

mm
rpm

Your results

Center distance (mm)
96
Gear ratio
3
Gear pitch diameter (mm)
144
d = m x z.
Pinion pitch diameter (mm)
48
Gear outside diameter (mm)
150
Blank diameter for a standard full-depth tooth: da = m x (z + 2).
Pinion outside diameter (mm)
54
Pinion root diameter (mm)
40.5
df = m x (z - 2.5) with a dedendum of 1.25 m.
Pinion base circle diameter (mm)
45.1051
Whole tooth depth (mm)
6.75
Circular pitch (mm)
9.4248
Pitch line velocity (m/s)
3.6442
Drives lubrication method and the quality grade you need.

Geometry for standard full-depth, zero-shift involute spur gears (addendum 1 m, dedendum 1.25 m). Profile shift, undercut limits and tooth strength are not checked.

Free, optional. Reopen it on any device.
Save results:

Center distance and gear outside diameter vs module

Sweeps Module from 1 to 10, holding your other inputs fixed.

Keep gear data in your ERP

Optional: a short review of how gear specifications could be stored and searched in your item master and routings.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Pick a standard module (see the related module table), then enter the number of teeth on the gear and pinion. Choose the pressure angle: 20 degrees is the modern default and 14.5 degrees appears on older equipment. Add face width and pinion speed to get pitch line velocity. The outside diameter is the blank size to turn before cutting, and the center distance is the bore spacing for the housing. The chart shows how both grow linearly with module.

Formulas and conventions

For a standard full-depth gear: pitch diameter d = m x z, outside diameter da = m x (z + 2), root diameter df = m x (z - 2.5), whole depth h = 2.25 m, circular pitch p = pi x m, and base diameter db = d x cos(pressure angle). Center distance a = m x (z1 + z2) / 2. These follow ISO 54 and ISO 53 proportions and match the usual metric handbook formulas. Diametral pitch in inch units is 25.4 divided by module.

  • Addendum equals one module
  • Dedendum equals 1.25 modules
  • Tooth thickness at the pitch circle is pi x m / 2 with no backlash

Reading the result

With module 3, a 48-tooth gear and a 16-tooth pinion, the pitch diameters are 144 mm and 48 mm, the center distance is 96 mm and the ratio is 3:1. A pinion with 16 teeth at 20 degrees is just under the 17-tooth limit where undercut starts, so consider 17 or more teeth, or profile shift. Pitch line velocity above roughly 5 m/s usually calls for ground or at least shaved teeth and oil lubrication rather than grease.

Common mistakes

Mixing module and diametral pitch is the classic error: a 3 module gear is not a 3 DP gear. Another is ordering a blank at pitch diameter instead of outside diameter. Gear pairs must share module and pressure angle, and real drives need backlash allowance, so cut center distance tolerance and tooth thickness reduction must be specified on the drawing and on the purchase order.

Frequently Asked Questions

How do I calculate the outside diameter of a spur gear?

Multiply the module by the number of teeth plus two. For module 3 and 48 teeth the outside diameter is 3 x 50 = 150 mm. In diametral pitch units the formula is (N + 2) divided by DP, in inches.

How do I calculate center distance between two spur gears?

Add the two pitch diameters and halve the result, which equals module times the sum of both tooth counts divided by two. Add a small tolerance or backlash allowance from your tolerancing practice before finalizing bore positions.

What is the difference between module and diametral pitch?

Module is pitch diameter in millimeters per tooth, while diametral pitch is teeth per inch of pitch diameter. They are reciprocal systems: module equals 25.4 divided by DP. Gears can only mesh if they share the same module and pressure angle.

Why does the calculator ask for pressure angle?

Pressure angle sets the base circle diameter, which defines the involute profile, and affects tooth strength and bearing load direction. Meshing gears must have the same pressure angle. Twenty degrees is the common standard for new designs.

If gear dimensions live in drawings and spreadsheets while your ERP routings and item masters are retyped by hand, Netray can help connect the two.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

Manufacturing hubs